You are on page 1of 6
MASTER LIST REFERENTIAL ADAPTATION 1 1(One) | 21June | PV (Piping valves Vessels) 25 2 1(One) | 21June | COR (Corrosion) 10 3 1(One) | 21June | INS (Instrument) 6 4 1(One) | 21June | PWW( Piping Valves Vessels) 10 ELE (Electrical, ICS (Conception and Safety 5 1(One) | 21June Engineering), 9 SAF (Safety), STR (structural), PLR{Pipelines Rises) Referential Adaptation Approval list — Batch 01-01/2017 Batch #1(One) List No :1 (One) Date 221 June 2017 Technical Domain: PVV( Piping Valves Vessels) 1 NG VALVES VESES | Pioig Hoop Sans Degn and rabies ef MAE PigSppors= 2 rnc vats veces | DOW ensranaton Me 3. WCcoMRSEpwoues —| PNG VANES VESES | ale Pes @[“Miiccour sre enrvvaiaa —| we VALVES VESSELS [Ftngs S| MiccoMspEenpvuies —| Fire VALVES VEsrIs-[ Fangs 6] ico s-e-rw.o\4e —[ Pp VALVES vessels | Bong org [Wik conp-sper-rWo145 —| vie VANES VESSELS" pig loge an SpaTS &[— wiecomp sr-r-pwos9 —| PN VAWES VESSELS [vain ype See 9 MHK-COMP-SPE-EP-PVV-0151_ PIPING VALVES VESSELS | Valves for High Temperature Service 10-| Micon rvai7s | PING VALVES VESSEL | Preurai Testing a Aleve Ground PBST 11[_sanccomeseeernvoire | mms vaives vssis | De 4 recon of Gas Reorced Fas (6) Png 12 | _Muxcompsreerpw.ozti | prem vaives esses | Pesan and Fabricio of Pressure VesasAcordng 13 | _mnccommsecernvania | rime aie vessais | Deteh and Fvtion of Fressre Vel Aran to Piping and Equipment Subject to Severe Sour Service iad PIPING VALVES VESSELS | sy etatlurgical and Welding Requirements 55_| — wncconPspeerwrosrs —| ping VALVES VSS | Valves Matra oguteren for Ue in Saran 56 [_— Wik ConP-sp-t-9W.0614 [RING VALVES VEsses | Weng Duolex ond Supe Duplex Sule Se 17 wiccon-spesrrosis —[ PNG VALVES Vessels Welln of UNS 7254 Aloy 1: | — winccowse er env osis —[ wre Alves vests | Welng Mann Ppe and Fags 15. |—Wiccon.e-r-py.0s17 —| BG VALVES VESSELS 207 MK COMP-SPE-EP-PW.OEIA | ING VALUES VESEL_[Fabreton of lay UNE O65 Gade Matera te Png Presi Vest! Cnmponets in Duplex 21| _MHKCOMPSPEcPROvO5i9 | APNG VALVES vesas | PRES resis Vs Comp 7 ‘Specification for Fabrication and Welding of Piping Systems 22 | _muccomrsecerewvosia | mrmavaivesvesss | Seeeaton or Fabscton an WER Ping and arent bec to Wd nd Tae Sar 23 | _MAKCOMPSrEEPmIvaG2 | PRNGVAIVESVEsas | PBRESTEEnipment Sule o Mi and Fr | COMP SPE. AW-GE50 —|-PPWG VALVES ESSE | TOR Pspecton 25 MHK-COMP-SPE-EP-PVV-0631_ PIPING VALVES VESSELS | Phased Array Inspection (PAUT) Authorized by PHM Director an Batch List No Date Technical Domain Referential Adaptation Approval list— Batch 01-02/2017 :1(One) :2 (Two) :21.June 2017 COR ( Corrosion) 1 MHK-COMP-SPE-EP-COR-0201 CORROSION Galvanic Anodes 2 MHK-COMP-SPE-EP-COR-0221 CORROSION Three Layer Polypropylene External Coating for Pipelines 2 | mxcompsreerconcias | comosion | Fobstvere and PotpropeneCotngsor tens n External protection of offshore and coastal 4 MHK-COMP-SPE-EP-COR-0350_ CORROSION structures and equipment by painting ieeenn External Protection of Structures and Equipment by 5 MHK-COMP-SPE-EP-COR-0351_ CORROSION Floating Structures 6 MHK-COMP-SPE-EP-COR-0354 CORROSION Lavine Protection of Onshore Structures and Equipment by Painting External Protection of Piping and Equipment by 7 MHK-COMP-SPE-EP-COR-0355, CORROSION: Thermal Spray Coating Corrosion Protection of Fasteners for Subsea and 2 | macconmsreesconcsss | conmonon | Careion Poet 9 MHK-COMP-SPE-EP-COR-0771 CORROSION Thermal insulation (Hot and Dual Services) 10 MHK-COMP-SPE-EP-COR-O772, CORROSION Thermal Insulation (Cold Service) Authorized by PHM Director a ee Referential Adaptation Approval list - Batch 01-03/2017 Batch :1(One) List No :3 (Three) Date #21 June 2017 Technical Domain: INS (instrument) 1 | MHK-COMP-SPE-EP-INS-o101 INSTRUMENTATION | instrumentation Design 2. | MHK-COMP-SPE-EP-INS-o102 INSTRUMENTATION | Instrumentation Identification 3 | MHK-COMP-SPE-EP-INS-0114 INSTRUMENTATION | Instrument Tubing and Fittings 4 | MHK-COMP-SPE-EP.INS.0116 INSTRUMENTATION | instrument Cables 5 | MHK-COMP-SPE-EP-INS.0125 INSTRUMENTATION _| Safety Relief Valves and Rupture Discs 6 | MHK-COMP-SPE-EP-INS-0137 INSTRUMENTATION —_| On/Off Valve Control Panels and Actuators Authorized by PHM Director - k Ida Yusi Referential Adaptation Approval list— Batch 01-04/2017 Batch :1(One) list No 4 (Four) Date #21 June 2017 Technical Domain : PV (Piping Valves Vessels) 1 | MHK-comp-sPE-ep-pwo101 | PIPING vaLves vEsseis | List of Pining Documents tobe Supplied to Company 2 | MHK-COMP-SPE-EP-PW.0107 | PIPING VALVES VESSELS _| Piping Stress Analysis 3. | MHK-COMP-SPE-EP-PW-0111 | PIPING VALVES VESSELS | Piping Design Specification 4 | ik-comp-sPe-ee-pw-0142 | PIPING VALVES VESSELS | Vales 5 | MHK-COMP-SPE-EP-PW-0147 | PIPING VALVES VESSELS | Gaskets for Piping and Vessels 6 | MHK-coMP-SPE-EP-PW.0154 | PIPING VALVES VESSELS _| Ball VaNes 7 | Mk-comp-sPe-ep-pw.o1ss | PIPING VALVES VESSELS | Gate, Globe and Check Valves 8 | MHK-ComP-SPE-EP-PW-0171 | PIPING VALVES VESSELS | Steel Piping Fabrication 9 | MHK-comp-sPE-Ep-pwv.0175 | PIPING VALVES VESSELS | Cleaning of Piping and Vessels 10 | | MHK-coMP-SPE-EP-pwv-o612 | PIPING vaLvesvesseLs | Welding of Pressure Containing Piping and Equipment ‘Authorized by PHM Director ay Referential Adaptation Approval list — Batch 01-05/2017 Batch +1 (One) List No 24(F) Date :21.June 2017 Technical Domain ELE (Electrical), ICS (Conception and Safety Engineering), SAF (Safety), STR (structural PLR(Pipelines Rises) ELECTRICAL Electrical Cables (CONCEPTION AND SAFETY 2 (MHK-COMP-SPE-EP-ICS-0001 ENGINEERING 2D CAD Layouts: CONCEPTION AND SAFETY 3 MHK-COMP-SPE-EP-ICS-0002 ENGINEERING 2D CAD Process Schematics CONCEPTION AND SAFETY 4 MHK-COMP-SPE-EP-ICS-0004 ENGINEERING 3D CAD Models 5 MHK-COMP-SPE-EP-STR-0005 STRUCTURAL tra apenances cthar shes Cranacand Winches 6 MHK-COMP-SPE-EP-STR-0301 STRUCTURAL Fabrication of Offshore Steel Structures 7 MHK-COMP-SPE-EP-PLR-0226 PIPELINES-RISERS Fabrication of Hot Bends for Pipelines Carbon Steel, Clad and Lined Pipe Manufacturing for Linepipe Applications According to API SPEC Ss >-SPE-EP-PLE 5 | MHK-cOMP 0205 PIPELINESRISERS | 51 and DNV-OS-F101 (Sweet Sour Service, Onshore and Offshore) 39 | mnk-comp-sPE-ep.sar-o322 SAFETY Fined fire water systems ‘Authorized by PHM Director Ida Y -

You might also like