DIMENSIONAL INSPECTION REPORT (BEFORE WELDING)

PROJECT NAME : FABRICATION OF SWITCH BOARD (VOYAGEUR SPIRIT) CLIENT : DRYDOCKS WORLD DUBAI
PROJECT NUMBER : RE-2023-01396 DATE : 25.10.2023

U85 - FIRST DECK FRAMING PLAN AT EL+40600


R = 3217 R = 4476 R = 4475
A= 3219 A= 4478 A= 4476

R = 3130
R = 3500 A = 3132
A = 3503

R = 4475
A = 4476

RESULT
R = 4316
R = 4316
A = 4318 ACCEPTED
A = 4317
ABBREVIATIONS
R – REQUIRED AS PER DRAWING
A – ACTUAL AT SITE
NOTES
DIMENSIONAL INSPECTION WILL BE CARRIED
R = 3217 R = 4476 OUT AFTER WELDING
A= 3219 A = 4478

CHECKED BY REVIEWED BY ACCEPTED

VIJAY KUMAR (QC INSPECTOR) DHANEESH (QA/QC ENGINEER) CLIENT