You are on page 1of 51

KEGIATAN : PENYEDIAAN, PENGEMBANGAN DAN PEMELIHARAAN SARANA DAN PRASARANA

PEKERJAAN : PEMELIHARAAN GEDUNG APANG SEMANGAI


LOKASI : KABUPATEN SINTANG
JANGKA WAKTU : 75 (TUJUH PULUH LIMA) HARI KALENDER
TAHUN ANGGARAN : 2023

NOMOR KONTRAK : 000.3.3/043/SPK-APS/DISPORAPAR.E/IX/2023


SUMBER DANA : DAU

KONSULTAN PENGAWAS : CV. KARYA BERSAUDARA


DIREKTUR : SUPRIYANTO, A.Md
INSPECTOR : MICHAEL ABONG, S.T

KONTRAKTOR PELAKSANA : CV. TRISUNG JAYA MAKMUR


DIREKTUR : SUJITO
MANAGER PELAKSANA :
N SARANA DAN PRASARANA OLAHRAGA REKREASI

BOBOT

(%) MINGGU 1 MINGGU 2 MINGGU 3

0 #DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0 #DIV/0!
JADWAL PELAKSANAAN

MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10


MINGGU 11 KET.
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMELIHARAAN GEDUNG PADEPOKAN
LOKASI : KABUPATEN SINTANG, KALIMANTAN BARAT
ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN
SUMBER DANA :
ANGGARAN 2023

JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
I. PEKERJAAN PENDAHULUAN Rp 16,611,150.00
II PEKERJAAN RING BALOK Rp 5,913,191.88
III PEKERJAAN PINTU, KACA DAN VENTILASI Rp 36,052,800.00
IV PEKERJAAN PLAFON Rp 110,572,791.30
V PEKERJAAN ATAP Rp 209,895,927.47
VI PEKERJAAN LANTAI Rp 12,075,384.75
VII PEKERJAAN PENGECATAN Rp 65,932,422.85
VIII PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 21,922,500.00
JUMLAH TOTAL Rp 478,976,168.24
PEMBULATAN Rp 478,970,000.00

TERBILANG : EMPAT RATUS TUJUH PULUH DELAPAN JUTA SEMBILAN RATUS TUJUH PULUH RIBU RUPIAH

Landak, 15 September 2023


Penawar
CV. SARAGAH RAYA

SARAGAH AGUSTINUS
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMELIHARAAN GEDUNG PADEPOKAN
LOKASI : KABUPATEN SINTANG, KALIMANTAN BARAT
SUMBER DANA : ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


KODE
NO ITEM PEKERJAAN SATUAN VOLUME
ANALISA (Rp.) (Rp.)

I. PEKERJAAN PENDAHULUAN
a. Pekerjaan Persiapan
1 Pembongkaran Dan Pembersihan lokasi Pkt 1.00 - Rp 5,000,000.00 Rp 5,550,000.00
2 Dokumentasi Dan Papan Nama Proyek Pkt 1.00 - Rp 500,000.00 Rp 555,000.00
3 Prancah Kerja Pkt 1.00 - Rp 1,000,000.00 Rp 1,110,000.00

b. Penyelenggaraan SMKK Bangunan Gedung


A. PERLENGKAPAN K3
1 Penyiapan RKK
Pembuatan Prosedur dan Instruksi Kerja Ls 1.00 - Rp 100,000.00 Rp 111,000.00
2 Sosialisasi & Promosi K3
Spanduk (Banner) Lmbr 1.00 - Rp 100,000.00 Rp 111,000.00
Papan Informasi K3 Bh 1.00 - Rp 100,000.00 Rp 111,000.00
3 Alat Pelindung Diri
Topi Pelindung (Safety Helmet) Bh 10.00 - Rp 50,000.00 Rp 555,000.00
Pelindung Pernapasan dan Mulut (Masker) Kotak 5.00 - Rp 35,000.00 Rp 194,250.00
Sarung Tangan (Safety Gloves) Psng 10.00 - Rp 25,000.00 Rp 277,500.00
Rompi Keselamatan (Safety Vest) Bh 10.00 - Rp 30,000.00 Rp 333,000.00
Sepatu Karet Keselamatan Psng 10.00 - Rp 150,000.00 Rp 1,665,000.00
Handsatizer 500 ML Botol 8.00 - Rp 30,000.00 Rp 266,400.00
4 Asuransi
Asuransi Kecelakaan Kerja Risiko Sangat Rendah
Mandor OB 1.00 - Rp 50,000.00 Rp 55,500.00
Kepala Tukang OB 1.00 - Rp 50,000.00 Rp 55,500.00
Tukang OB 6.00 - Rp 50,000.00 Rp 333,000.00
Pekerja OB 3.00 - Rp 50,000.00 Rp 166,500.00
5 Personel K3 Konstruksi
Ahli K3 OB 3.00 - Rp 1,000,000.00 Rp 3,330,000.00
6 Fasilitas Sarana & Prasarana Kesehatan
Peralatan P3K (Kotak K3, Obat Luka, Obat Umum, Perban) Ls 1.00 - Rp 250,000.00 Rp 277,500.00
7 Rambu-Rambu
Rambu Petunjuk Bh 1.00 - Rp 100,000.00 Rp 111,000.00
Rambu Larangan Bh 1.00 - Rp 100,000.00 Rp 111,000.00
Rambu Peringatan Bh 1.00 - Rp 100,000.00 Rp 111,000.00
8 Pengendalian Risiko Keselamatan Konstruksi
Bendera K3 Ls 1.00 - Rp 100,000.00 Rp 111,000.00
9 BPJS Tenaga Kerja Ls 1.00 - Rp 1,000,000.00 Rp 1,110,000.00
JUMLAH - I Rp 16,611,150.00
II PEKERJAAN RING BALOK
1 Pekerjaan Pembesian tulangan Kg 104.06 A.4.1.1.17 Rp 18,813.30 Rp 2,173,060.32
2 Pekerjaan Bakesting M 7.14 A.4.1.1.23 Rp 331,782.00 Rp 2,629,505.06
3 Pekerjaan Cor Beton, mutu K.175 M 0.61 A.4.1.1.7. Rp 1,345,181.00 Rp 910,822.06
4 Plesteran Ring Balok M 2.20 A.4.4.2.4 Rp 81,820.00 Rp 199,804.44
JUMLAH - II Rp 5,913,191.88
III PEKERJAAN PINTU, KACA DAN VENTILASI
1 Ventilasi Kaca Bingkai Alumunium M 32.48 - Rp 1,000,000.00 Rp 36,052,800.00
JUMLAH - III Rp 36,052,800.00
IV PEKERJAAN PLAFON
1 Rangka plafon baja ringan M 221.00 - Rp 130,000.00 Rp 31,890,300.00
2 Rangka Plafond Bahan Kayu Kelas II M 144.63 - Rp 100,000.00 Rp 16,053,930.00
3 Plafon Triplek t = 3 mm M 680.00 A.4.5.1.7. Rp 48,257.00 Rp 36,424,383.60
4 Plafon GRC Board M 391.70 A.4.5.1.7.a Rp 60,269.00 Rp 26,204,177.70
JUMLAH - IV Rp 110,572,791.30
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan M 271.04 - Rp 185,000.00 Rp 55,658,064.00
2 Pekerjaan Atap Zincalume Kotak 0.3 (Spandek Mini Colour) M 763.55 A.4.5.2.32. Rp 175,945.00 Rp 149,120,513.27
3 Pekerjaan Penutup prabung Seng BJLS polos 0.25 (colour) M 51.08 A.4.5.2.37 Rp 90,255.00 Rp 5,117,350.19
JUMLAH - V Rp 209,895,927.47
VI PEKERJAAN LANTAI
1 Pekerjaan Acian Lantai Area Sasana M 221.00 A.4.4.2.27. Rp 49,225.00 Rp 12,075,384.75
JUMLAH - VI Rp 12,075,384.75
VII PEKERJAAN PENGECATAN
1 Pengecatang Lisplank M 42.24 A.4.7.1.4 Rp 55,357.00 Rp 2,595,490.44
2 Pengecatan Dinding Tembok Lama M 97.88 A.4.7.1.10. Rp 48,787.00 Rp 5,300,551.43
3 Pengecatan Plafon M 1071.70 A.4.7.1.10. Rp 48,787.00 Rp 58,036,380.97
JUMLAH - VII Rp 65,932,422.85
VIII PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Jaringan Instalasi Listrik (Kabel NYY Uk. 3 x 2,5 mm) M 200.00 - Rp 30,000.00 Rp 6,660,000.00
2 Lampu Led Inbow 18 watt Bh 54.00 - Rp 150,000.00 Rp 8,991,000.00
3 Lampu Led 30x120 48 watt Bh 9.00 - Rp 250,000.00 Rp 2,497,500.00
4 Sakelar tunggal Bh 42.00 - Rp 30,000.00 Rp 1,398,600.00
5 Sakelar ganda Bh 12.00 - Rp 35,000.00 Rp 466,200.00
6 Saklar Triple Bh 3.00 - Rp 40,000.00 Rp 133,200.00
7 Stop Kontak 2 Pole Bh 8.00 - Rp 50,000.00 Rp 444,000.00
8 Kotak MCB Box Panel Bh 4.00 - Rp 300,000.00 Rp 1,332,000.00
JUMLAH - VIII Rp 21,922,500.00
JUMLAH TOTAL Rp 478,976,168.24
JADWAL PELAKSANAAN PEKERJAAN / TIME SCHEDULE
Pekerjaan : PEMELIHARAAN GEDUNG PADEPOKAN
Lokasi : KABUPATEN SINTANG, KALIMANTAN BARAT
Sumber Dana : ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN ANGGARAN 2023

JANGKA WAKTU PELAKSANAAN 90 HARI KALENDER


NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) JUMLAH BOBOT (%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13

I. - 16,611,150.00 #NAME? #NAME? #NAME?


II. #NAME? 5,913,191.88 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
III. #NAME? 36,052,800.00 #NAME? #NAME? #NAME? #NAME? #NAME?
IV. #NAME? 110,572,791.30 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
V. #NAME? 209,895,927.47 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
VI. #NAME? 12,075,384.75 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
VII. - 65,932,422.85 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
VIII. - 21,922,500.00 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
IX. #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
X. #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
XI. #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
XII. #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME?
REALISASI MINGGUAN
REALISASI KOMULATIF MINGGUAN
RENCANA MINGGUAN #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RENCANA KOMULATIF MINGGUAN #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
DEVISIASI (SELISIH)

Di Buat Oleh,
Putussibau, 22 April 2022
CV. SAKTI UTAMA

SUDIRMAN
DIREKTUR
STANDARISASI HARGA BAHAN BANGUNAN & JASA PERALATAN

NO JENIS PEKERJA SATUAN HARGA SATUAN

1 Pekerja OH Rp 110,000.00
2 Tukang OH Rp 140,000.00
3 Kepala Tukang OH Rp 140,000.00
4 Mandor OH Rp 150,000.00

NO MATERIAL SATUAN HARGA SATUAN

A. BAHAN PENGISI
Pasir Halus M³ Rp 200,000.00
Batu pecah 1-2 cm M³ Rp 500,000.00
Batu pecah 2-3 cm M³ Rp 475,000.00
Tanah Timbunan M³ Rp 100,000.00
Bataco 20 x 40 x 7 cm ( press ) Bh Rp 3,000.00
Semen PC Zak Rp 90,000.00
Semen Warna (Oker) Kg Rp 20,000.00
Rooster bh Rp 30,000.00
B. BAHAN BESI & BAJA
Kawat Bindrat/Ikat Kg Rp 40,000.00
Kawat Las Listrik Kg Rp 50,000.00
Besi Beton Ø 10 Kg Rp 13,900.00
Besi Beton D 13 Kg Rp 13,900.00
Besi Beton D 16 Kg Rp 13,900.00
Wiremesh M6 Kg Rp 15,000.00
Besi Plat Kg Rp 20,000.00
Baut Bh Rp 8,000.00
Metal Furing M' Rp 11,250.00
Paku Campur Kg Rp 25,000.00
Paku 2-5" Kg Rp 25,000.00
Paku Triplek Kg Rp 30,000.00
Paku Gypsum Kg Rp 40,000.00
Skrup Fixer Bh Rp 1,500.00
Lem Kayu Kg Rp 30,000.00
C. BAHAN KAYU
Kayu Cerucuk Ø 8-10 panjang 4 m Btg Rp 15,000.00
Kayu Papan Mal M3 Rp 1,500,000.00
Papan Kayu Kelas I (Ketam) M3 Rp 10,000,000.00
Papan Kayu Kelas II (Ketam) M3 Rp 3,000,000.00
Papan Kayu Kelas III (Ketam) M3 Rp 2,000,000.00
Kayu Balok 5/10 Klas I M3 Rp 5,500,000.00
Kayu Balok 5/7 Klas III M3 Rp 3,000,000.00
Gypsum Profil List Plafond / Cornice M' Rp 15,000.00
Gypsum Board Tebal 4 mm Lbr Rp 85,000.00
GRC Board Tebal 4 mm Lbr Rp 85,000.00
Triplek 3mm Lbr Rp 55,000.00
HPL Lbr Rp 300,000.00
Multiplek 9 mm Lbr Rp 120,000.00
Multiplek 12 mm Lbr Rp 250,000.00
NO MATERIAL SATUAN HARGA SATUAN

D. BAHAN CAT
Cat Dasar Kg Rp 40,000.00
Cat Penutup Interior Kg Rp 100,000.00
Cat Penutup Exterior Kg Rp 150,000.00
Meni Besi Kg Rp 60,000.00
Dempul Kg Rp 20,000.00
Plamur Kg Rp 20,000.00
Kuas Bh Rp 30,000.00
Pengencer Kg Rp 15,000.00
Amplas Lbr Rp 10,000.00
E. BAHAN ATAP
Atap Zincalume 0.3 M2 Rp 88,000.00
Seng Gelombang BJLS 0,20 M2 Rp 50,000.00
Seng Gelombang BJLS 0,30 M2 Rp 80,000.00
Seng Plat BJLS 0,20 M2 Rp 80,000.00
Nok Genteng Metal M Rp 25,000.00
F. BAHAN KERAMIK
Keramik 60 x 60 cm Polished Bh Rp 275,000.00
Keramik 40 x 40 cm Unpolished Bh Rp 90,000.00
Keramik 30 x 30 cm Unpolished Bh Rp 90,000.00
Keramik 30 x 60 cm Bh Rp 90,000.00
ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1. PEKERJAAN PERSIAPAN

A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang Kayu OH 0.1000 140,000.00 14,000.00
Kepala Tukang OH 0.0100 140,000.00 1,400.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 27,150.00
B BAHAN - -
Kayu balok 5/7 m3 0.0120 3,000,000.00 36,000.00
Paku 2”-3” Kg 0.0200 25,000.00 500.00
Papan mal Kelas III m3 0.0035 1,500,000.00 5,250.00
JUMLAH HARGA BAHAN 42,525.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 69,287.50
E Overhead & Profit 10% 6,928.75
F Harga Satuan Pekerjaan (D+E) - 76,216.00

A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.0000 110,000.00 110,000.00
Tukang Kayu OH 2.0000 140,000.00 280,000.00
Kepala Tukang OH 0.2000 140,000.00 28,000.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 425,500.00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.2500 15,000.00 18,750.00
Kayu m3 0.1860 - -
Paku biasa Kg 0.3000 25,000.00 7,500.00
Semen portland Kg 18.0000 1,800.00 32,400.00
Pasir beton m3 0.0300 200,000.00 6,000.00
Seng gelombang Lbr 1.5000 50,000.00 75,000.00
Plywood 4 mm Lbr 1.3500 55,000.00 74,250.00
JUMLAH HARGA BAHAN 213,900.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 639,400.00
E Overhead & Profit 10% 63,940.00
F Harga Satuan Pekerjaan (D+E) - 703,340.00

A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Pekerja OH 0.1000 110,000.00 11,000.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 18,500.00
B BAHAN -
JUMLAH HARGA BAHAN
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 18,500.00
E Overhead & Profit 10% 1,850.00
F Harga Satuan Pekerjaan (D+E) - 20,350.00
A.2.2.1.13. Pembongkaran 1 m3 beton bertulang
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 13.3340 110,000.00 1,466,740.00
Mandor OH 0.6660 150,000.00 99,900.00
JUMLAH TENAGA KERJA 1,566,640.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,566,640.00
E Overhead & Profit 10% 156,664.00
F Harga Satuan Pekerjaan (D+E) - 1,723,304.00

A.2.3.1. PEKERJAAN TANAH


A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.7500 110,000.00 82,500.00
Mandor OH 0.0250 150,000.00 3,750.00
JUMLAH TENAGA KERJA 86,250.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 86,250.00
E Overhead & Profit 10% 8,625.00
F Harga Satuan Pekerjaan (D+E) - 94,875.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.9000 110,000.00 99,000.00
Mandor OH 0.0450 150,000.00 6,750.00
JUMLAH TENAGA KERJA 105,750.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 105,750.00
E Overhead & Profit 10% 10,575.00
F Harga Satuan Pekerjaan (D+E) - 116,325.00
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.5000 110,000.00 55,000.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 62,500.00
E Overhead & Profit 10% 6,250.00
F Harga Satuan Pekerjaan (D+E) - 68,750.00

A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.5000 110,000.00 55,000.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 62,500.00
E Overhead & Profit 10% 6,250.00
F Harga Satuan Pekerjaan (D+E) - 68,750.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0100 150,000.00 1,500.00
JUMLAH TENAGA KERJA 34,500.00
B BAHAN - -
Pasir urug M3 1.2000 200,000.00 240,000.00
JUMLAH HARGA BAHAN 240,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 274,500.00
E Overhead & Profit 10% 27,450.00
F Harga Satuan Pekerjaan (D+E) - 301,950.00

A.2.3.1.15. Pengurugan 1 m3 Tanah Pilihan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.2500 110,000.00 27,500.00
Mandor OH 0.0250 150,000.00 3,750.00
JUMLAH TENAGA KERJA -
B BAHAN - -
Tanah pilihan m3 1.2000 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 135,625.00
E Overhead & Profit 10% 10% 13,562.50
F Harga Satuan Pekerjaan (D+E) - 149,187.00
A.4.2.1. PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0430 110,000.00 4,730.00
Tukang Alumunium OH 0.0430 140,000.00 6,020.00
Kepala tukang OH 0.0043 140,000.00 602.00
Mandor OH 0.0021 150,000.00 315.00
JUMLAH TENAGA KERJA 11,667.00
B BAHAN
Kusen Alumunium Uk.5/11 cm Btg 1.1000 #NAME? #NAME?
Skrup fixer buah 2.0000 1,500.00 3,000.00
Sealant Tube 0.0600 30,000.00 1,800.00
JUMLAH HARGA BAHAN #NAME?
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #NAME?
E Overhead & Profit 10% #NAME?
F Harga Satuan Pekerjaan (D+E) - #NAME?

A.4.2.1.3. Pengerjaan 10 kg pekerjaan perakitan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang Besi Konstruksi OH 0.1000 140,000.00 14,000.00
Kepala tukang OH 0.0010 140,000.00 140.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
Solar Liter 1.0000 11,000.00 11,000.00
Minyak pelumas Liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) - 37,890.00
E Overhead & Profit 10% 3,789.00
F Harga Satuan Pekerjaan (D+E) - 41,679.00
G Harga Satuan Pekerjaan Per 1Kg - 4,167.90

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0400 110,000.00 4,400.00
Tukang Besi Konstruksi OH 0.0200 140,000.00 2,800.00
Kepala tukang OH 0.0020 140,000.00 280.00
Mandor OH 0.0020 150,000.00 300.00
JUMLAH TENAGA KERJA 7,780.00
B BAHAN
Kawat las listrik Kg 0.4000 50,000.00 20,000.00
Solar Liter 0.3000 11,000.00 3,300.00
Minyak pelumas Liter 0.0400 10,000.00 400.00
JUMLAH HARGA BAHAN 23,700.00
C PERALATAN
Sewa alat Las Listrik Jam 0.1700 20,000.00 3,400.00
JUMLAH HARGA ALAT 3,400.00
D Jumlah (A+B+C) - 34,880.00
E Overhead & Profit 10% 3,488.00
F Harga Satuan Pekerjaan (D+E) - 38,368.00
G Harga Satuan Pekerjaan Per 1Kg - 3,836.80
A.4.2.1.21.a Pemasangan 1 M2 Ranga Metal Furing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.3500 110,000.00 38,500.00
Tukang Besi OH 0.3500 140,000.00 49,000.00
Kepala Tukang OH 0.0350 140,000.00 4,900.00
Mandor OH 0.0180 150,000.00 2,700.00
JUMLAH TENAGA KERJA 47,550.00
B BAHAN
Rangka metal Furing M1 4.0000 11,250.00 45,000.00
Assesoris (perkuatan, las dll) Ls 0.2000 31,500.00 6,300.00
JUMLAH HARGA BAHAN 51,300.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 122,625.00
E Overhead & Profit 10% 12,262.50
F Harga Satuan Pekerjaan (D+E) - 134,887.00

A.4.2.1.21.b Pemasangan 1 M2 Ranga Besi Hollow 40/40/1 mm, Modul 60 x 120 cm, untuk Partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.2500 110,000.00 27,500.00
Tukang Besi OH 0.2500 140,000.00 35,000.00
Kepala Tukang OH 0.2500 140,000.00 35,000.00
Mandor OH 0.1300 150,000.00 19,500.00
JUMLAH TENAGA KERJA 117,000.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 #NAME? #NAME?
Assesoris (perkuatan, las dll) Ls 0.2000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #NAME?
E Overhead & Profit 10% #NAME?
F Harga Satuan Pekerjaan (D+E) - #NAME?
A.4.1.1. PEKERJAAN BETON

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.2000 110,000.00 132,000.00
Tukang Batu OH 0.2000 140,000.00 28,000.00
Kepala Tukang OH 0.0200 140,000.00 2,800.00
Mandor OH 0.0600 150,000.00 9,000.00
JUMLAH TENAGA KERJA 171,800.00
B BAHAN
Semen portland kg 227.0000 1,800.00 408,600.00
Pasir Beton kg 869.0000 148.15 128,740.74
Kerikil (Maks 30 mm) kg 1000.0000 357.14 357,142.86
Air Liter 200.0000 -
JUMLAH HARGA BAHAN 894,483.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,066,283.60
E Overhead & Profit 10% 106,628.36
F Harga Satuan Pekerjaan (D+E) 1,172,911.00

A.4.1.1.7. Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.0000 110,000.00 110,000.00
Tukang Batu OH 0.2500 140,000.00 35,000.00
Kepala Tukang OH 0.0250 140,000.00 3,500.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 156,000.00
B BAHAN
Semen portland kg 326.0000 1,800.00 586,800.00
Pasir Beton kg 760.0000 148.15 112,592.59
Kerikil (Maks 30 mm) kg 1029.0000 357.14 367,500.00
Air Liter 215.0000 -
JUMLAH HARGA BAHAN 1,066,892.59
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,222,892.59
E Overhead & Profit 10% 122,289.26
F Harga Satuan Pekerjaan (D+E) 1,345,181.00

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0700 110,000.00 7,700.00
Tukang Besi OH 0.0700 140,000.00 9,800.00
Kepala Tukang OH 0.0070 140,000.00 980.00
Mandor OH 0.0040 150,000.00 600.00
JUMLAH TENAGA KERJA 19,080.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 13,900.00 145,950.00
Kawat beton kg 0.1500 40,000.00 6,000.00
JUMLAH HARGA BAHAN 151,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 171,030.00
E Overhead & Profit 10% 17,103.00
F Harga Satuan Pekerjaan (D+E) 188,133.00
G Harga Satuan Pekerjaan Per 1 Kg 18,813.30
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0250 110,000.00 2,750.00
Tukang Besi OH 0.0250 140,000.00 3,500.00
Kepala Tukang OH 0.0250 140,000.00 3,500.00
Mandor OH 0.0010 150,000.00 150.00
JUMLAH TENAGA KERJA 9,900.00
B BAHAN
Besi Wiremesh kg 10.2000 15,000.00 153,000.00
Kawat beton kg 0.0500 40,000.00 2,000.00
JUMLAH HARGA BAHAN 155,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 164,900.00
E Overhead & Profit 10% 16,490.00
F Harga Satuan Pekerjaan (D+E) 181,390.00
G Harga Satuan Pekerjaan Per 1 Kg 18,139.00

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 2x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.5200 110,000.00 57,200.00
Tukang Kayu OH 0.2600 140,000.00 36,400.00
Kepala Tukang OH 0.0260 140,000.00 3,640.00
Mandor OH 0.0260 150,000.00 3,900.00
JUMLAH TENAGA KERJA 101,140.00
B BAHAN
Papan Mal Kelas III m3 0.0400 1,500,000.00 60,000.00
Paku 5 - 10 cm kg 0.3000 25,000.00 7,500.00
Minyak bekisting Liter 0.1000 -
JUMLAH HARGA BAHAN 67,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 168,640.00
E Overhead & Profit 10% 16,864.00
F Harga Satuan Pekerjaan (D+E) 185,504.00

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 3x Pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.5200 110,000.00 57,200.00
Tukang Kayu OH 0.2600 140,000.00 36,400.00
Kepala Tukang OH 0.0260 140,000.00 3,640.00
Mandor OH 0.0260 150,000.00 3,900.00
JUMLAH TENAGA KERJA 101,140.00
B BAHAN
Papan Mal Kelas III m3 0.0450 1,500,000.00 67,500.00
Paku 5 - 10 cm kg 0.3000 25,000.00 7,500.00
Minyak bekisting Liter 0.1000 -
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 176,140.00
E Overhead & Profit 10% 17,614.00
F Harga Satuan Pekerjaan (D+E) 193,754.00
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 3x Pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.6600 110,000.00 72,600.00
Tukang Kayu OH 0.3300 140,000.00 46,200.00
Kepala Tukang OH 0.0330 140,000.00 4,620.00
Mandor OH 0.0330 150,000.00 4,950.00
JUMLAH TENAGA KERJA 128,370.00
B BAHAN
Papan Mal Kelas III m3 0.0400 1,500,000.00 60,000.00
Paku 5 - 12 cm kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 -
Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
Plywood 9 mm Lbr 0.3500 55,000.00 19,250.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 164,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 292,620.00
E Overhead & Profit 10% 29,262.00
F Harga Satuan Pekerjaan (D+E) 321,882.00

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 3x Pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.6600 110,000.00 72,600.00
Tukang Kayu OH 0.3300 140,000.00 46,200.00
Kepala Tukang OH 0.0330 140,000.00 4,620.00
Mandor OH 0.0330 150,000.00 4,950.00
JUMLAH TENAGA KERJA 128,370.00
B BAHAN
Papan Mal Kelas III m3 0.0400 1,500,000.00 60,000.00
Paku 5 - 12 cm kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II m3 0.0180 3,000,000.00 54,000.00
Plywood 9 mm Lbr 0.3500 55,000.00 19,250.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 173,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 301,620.00
E Overhead & Profit 10% 30,162.00
F Harga Satuan Pekerjaan (D+E) 331,782.00

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 2x Pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.6600 110,000.00 72,600.00
Tukang Kayu OH 0.3300 140,000.00 46,200.00
Kepala Tukang OH 0.0330 140,000.00 4,620.00
Mandor OH 0.0330 150,000.00 4,950.00
JUMLAH TENAGA KERJA 128,370.00
B BAHAN
Papan Mal Kelas III m3 0.0400 1,500,000.00 60,000.00
Paku 5 - 12 cm kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
Plywood 9 mm Lbr 0.3500 55,000.00 19,250.00
Dolken kayu Ø 8-10/400 cm Batang 6.0000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 224,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 352,620.00
E Overhead & Profit 10% 35,262.00
F Harga Satuan Pekerjaan (D+E) 387,882.00
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 3x Pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.6600 110,000.00 72,600.00
Tukang Kayu OH 0.3300 140,000.00 46,200.00
Kepala Tukang OH 0.0330 140,000.00 4,620.00
Mandor OH 0.0330 150,000.00 4,950.00
JUMLAH TENAGA KERJA 128,370.00
B BAHAN
Papan Mal Kelas III m3 0.0300 1,500,000.00 45,000.00
Paku 5 - 12 cm kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.2000 - -
Balok kayu kelas II m3 0.0200 3,000,000.00 60,000.00
Dolken kayu Ø 8-10/400 cm Batang 3.0000 15,000.00 45,000.00
Penjaga jarak bekisting / spacer Buah 4.0000 5,000.00 20,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 308,370.00
E Overhead & Profit 10% 30,837.00
F Harga Satuan Pekerjaan (D+E) 339,207.00

A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 3x Pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.6600 110,000.00 72,600.00
Tukang Kayu OH 0.3300 140,000.00 46,200.00
Kepala Tukang OH 0.0330 140,000.00 4,620.00
Mandor OH 0.0330 150,000.00 4,950.00
JUMLAH TENAGA KERJA 128,370.00
B BAHAN
Kayu kelas III m3 0.0300 2,000,000.00 60,000.00
Paku 5 - 12 cm kg 0.4000 25,000.00 10,000.00
Minyak bekisting Liter 0.1500 -
Balok kayu kelas II m3 0.0150 3,000,000.00 45,000.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 145,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 273,370.00
E Overhead & Profit 10% 27,337.00
F Harga Satuan Pekerjaan (D+E) 300,707.00

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1800 110,000.00 19,800.00
Tukang batu OH 0.0200 140,000.00 2,800.00
Tukang kayu OH 0.0200 140,000.00 2,800.00
Tukang besi OH 0.0200 140,000.00 2,800.00
Kepala tukang OH 0.0060 140,000.00 840.00
Mandor OH 0.0090 150,000.00 1,350.00
JUMLAH TENAGA KERJA 30,390.00
B BAHAN
Kayu kelas III m3 0.0020 2,000,000.00 4,000.00
Paku Biasa kg 0.0100 25,000.00 250.00
Minyak bekisting Liter 1.2000 -
Besi beton (polos/ulir) kg 3.0000 13,900.00 41,700.00
Kawat beton kg 0.4500 40,000.00 18,000.00
Semen portland kg 4.0000 1,800.00 7,200.00
Pasir Beton m3 0.0060 200,000.00 1,200.00
Kerikil m3 0.0090 500,000.00 4,500.00
JUMLAH HARGA BAHAN 76,850.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,240.00
E Overhead & Profit 10% 10,724.00
F Harga Satuan Pekerjaan (D+E) 117,964.00
A.4.4.1. PEKERJAAN PASANGAN DINDING

A.4.4.1.17.a Pemasangan 1 m2 dinding batako


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.3500 110,000.00 38,500.00
Tukang Batu OH 0.1000 140,000.00 14,000.00
Kepala Tukang OH 0.0100 140,000.00 1,400.00
Mandor OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 56,150.00
B BAHAN
Batako Uk. 7 x 20 x 40 Cm bh 12.5000 3,000.00 37,500.00
Semen portland Kg 15.0000 1,800.00 27,000.00
Pasir Pasang m3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 71,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 127,650.00
E Overhead & Profit 10% 12,765.00
F Harga Satuan Pekerjaan (D+E) 140,415.00

A.4.4.1.23.a Pemasangan 1 m2 dinding terawang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.3000 110,000.00 33,000.00
Tukang Batu OH 0.1000 140,000.00 14,000.00
Kepala Tukang OH 0.0100 140,000.00 1,400.00
Mandor OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 50,650.00
B BAHAN
Rooster bh 30.0000 30,000.00 900,000.00
Semen portland Kg 11.0000 1,800.00 19,800.00
Pasir Pasang m3 0.0350 200,000.00 7,000.00
JUMLAH HARGA BAHAN 926,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 977,450.00
E Overhead & Profit 10% 97,745.00
F Harga Satuan Pekerjaan (D+E) 1,075,195.00

A.4.4.2. PEKERJAAN PLESTERAN

A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.3000 110,000.00 33,000.00
Tukang Batu OH 0.1500 140,000.00 21,000.00
Kepala Tukang OH 0.0150 140,000.00 2,100.00
Mandor OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,350.00
B BAHAN
Semen portland Kg 6.2400 1,800.00 11,232.00
Pasir Pasang m3 0.0240 200,000.00 4,800.00
JUMLAH HARGA BAHAN 16,032.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 74,382.00
E Overhead & Profit 10% 7,438.20
F Harga Satuan Pekerjaan (D+E) 81,820.00

A.4.4.2.27. Pemasangan 1 m2 acian.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.2000 110,000.00 22,000.00
Tukang Batu OH 0.1000 140,000.00 14,000.00
Kepala Tukang OH 0.0100 140,000.00 1,400.00
Mandor OH 0.0100 150,000.00 1,500.00
JUMLAH TENAGA KERJA 38,900.00
B BAHAN
Semen portland Kg 3.2500 1,800.00 5,850.00
JUMLAH HARGA BAHAN 5,850.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,750.00
E Overhead & Profit 10% 4,475.00
F Harga Satuan Pekerjaan (D+E) 49,225.00
A.4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.36.a Pemasangan 1m2 lantai Keramik ukuran 40cm x40cm (Polished)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.7000 110,000.00 77,000.00
Tukang Batu OH 0.3500 140,000.00 49,000.00
Kepala tukang OH 0.0350 140,000.00 4,900.00
Mandor OH 0.0350 150,000.00 5,250.00
JUMLAH TENAGA KERJA 136,150.00
B BAHAN
Keramik 60 x 60 cm Polyshed Bh 1.0500 275,000.00 288,750.00
Semen portland kg 10.0000 1,800.00 18,000.00
Semen Warna Kg 0.0500 20,000.00 1,000.00
Pasir Pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 316,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 452,900.00
E Overhead & Profit 10% 45,290.00
F Harga Satuan Pekerjaan (D+E) 498,190.00

A.4.4.3.36.c Pemasangan 1m2 lantai Keramik ukuran 40cm x40cm (Unpolished)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.7000 110,000.00 77,000.00
Tukang Batu OH 0.3500 140,000.00 49,000.00
Kepala tukang OH 0.0350 140,000.00 4,900.00
Mandor OH 0.0350 150,000.00 5,250.00
JUMLAH TENAGA KERJA 136,150.00
B BAHAN
Keramik 40 x 40 cm Unpolyshed Bh 1.0500 90,000.00 94,500.00
Semen portland kg 10.0000 1,800.00 18,000.00
Semen Warna Kg 0.0500 20,000.00 1,000.00
Pasir Pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 122,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,650.00
E Overhead & Profit 10% 25,865.00
F Harga Satuan Pekerjaan (D+E) 284,515.00
A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.7000 110,000.00 77,000.00
Tukang Batu OH 0.3500 140,000.00 49,000.00
Kepala tukang OH 0.0350 140,000.00 4,900.00
Mandor OH 0.0350 150,000.00 5,250.00
JUMLAH TENAGA KERJA 136,150.00
B BAHAN
Keramik ukuran 30cm x 30cm Bh 1.0500 90,000.00 94,500.00
Semen portland Kg 10.0000 1,800.00 18,000.00
Pasir Pasang M3 0.0450 200,000.00 9,000.00
Semen Warna Kg 0.5000 20,000.00 10,000.00
JUMLAH HARGA BAHAN 131,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 267,650.00
E Overhead & Profit 10% 26,765.00
F Harga Satuan Pekerjaan (D+E) 294,415.00

A.4.4.3.54.a Pemasangan 1 m2 dinding keramik 30cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.9000 110,000.00 99,000.00
Tukang Batu OH 0.4500 140,000.00 63,000.00
Kepala tukang OH 0.0450 140,000.00 6,300.00
Mandor OH 0.0450 150,000.00 6,750.00
JUMLAH TENAGA KERJA 175,050.00
B BAHAN
keramik Dinding 30cm x 60cm Doos 1.0500 90,000.00 94,500.00
Semen portland Kg 9.3000 1,800.00 16,740.00
Pasir Pasang M3 0.0180 200,000.00 3,600.00
Semen Warna Kg 1.9400 20,000.00 38,800.00
JUMLAH HARGA BAHAN 153,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 328,690.00
E Overhead & Profit 10% 32,869.00
F Harga Satuan Pekerjaan (D+E) 361,559.00
A.4.5.1. PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.7. Pemasangan 1 m2 triplek


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang kayu OH 0.0500 140,000.00 7,000.00
Kepala tukang OH 0.0050 140,000.00 700.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 19,450.00
B BAHAN
Triplek 3mm Lembar 0.3640 55,000.00 20,020.00
Paku skrup kg 0.1100 40,000.00 4,400.00
JUMLAH HARGA BAHAN 24,420.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,870.00
E Overhead & Profit 10% 4,387.00
F Harga Satuan Pekerjaan (D+E) 48,257.00

A.4.5.1.7.a Memasang 1 M2 Langit Langit GRC Board Uk. 120 x 240 cm, Tebal 4 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang Kayu OH 0.0500 140,000.00 7,000.00
Kepala tukang OH 0.0050 140,000.00 700.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 19,450.00
B BAHAN
GRC Board Tebal 4 mm M' 0.3640 85,000.00 30,940.00
Paku Triplek bh 0.1100 40,000.00 4,400.00
JUMLAH HARGA BAHAN 35,340.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,790.00
E Overhead & Profit 10% 5,479.00
F Harga Satuan Pekerjaan (D+E) - 60,269.00

A.4.5.1.14. Memasang 1 M1 List Langit Langit Profil Gypsum / Cornice


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0500 110,000.00 5,500.00
Tukang Kayu OH 0.0500 140,000.00 7,000.00
Kepala tukang OH 0.0050 140,000.00 700.00
Mandor OH 0.0030 150,000.00 450.00
JUMLAH TENAGA KERJA 13,650.00
B BAHAN
List Gypsum Profil / Cornice Lebar 15 cm M' 1.0500 15,000.00 15,750.00
Paku sekrup Kg 0.0100 40,000.00 400.00
JUMLAH HARGA BAHAN 16,150.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 29,800.00
E Overhead & Profit 10% 2,980.00
F Harga Satuan Pekerjaan (D+E) - 32,780.00
A.4.5.2. PEKERJAAN PENUTUP ATAP

A.4.5.2.32. Memasang 1 M2 Atap Zincalume


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.2000 110,000.00 22,000.00
Tukang Kayu OH 0.1000 140,000.00 14,000.00
Kepala tukang OH 0.0100 140,000.00 1,400.00
Mandor OH 0.0010 150,000.00 150.00
JUMLAH TENAGA KERJA 37,550.00
B BAHAN
Genteng Metal m2 1.3000 88,000.00 114,400.00
Sekrup Kg 0.2000 40,000.00 8,000.00
JUMLAH HARGA BAHAN 122,400.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 159,950.00
E Overhead & Profit 10% 15,995.00
F Harga Satuan Pekerjaan (D+E) 175,945.00

A.4.5.2.37 Pemasangan 1 m nok genteng metal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.2500 110,000.00 27,500.00
Tukang Kayu OH 0.1500 140,000.00 21,000.00
Kepala tukang OH 0.0150 140,000.00 2,100.00
Mandor OH 0.0130 150,000.00 1,950.00
JUMLAH TENAGA KERJA 52,550.00
B BAHAN
Nok Genteng Metal buah 1.1000 25,000.00 27,500.00
Sekrup Kg 0.0500 40,000.00 2,000.00
JUMLAH HARGA BAHAN 29,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 82,050.00
E Overhead & Profit 10% 8,205.00
F Harga Satuan Pekerjaan (D+E) 90,255.00
A.5.1.1. PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 3.300 110,000.00 363,000.00
Tukang batu OH 1.100 140,000.00 154,000.00
Kepala tukang OH 0.010 140,000.00 1,400.00
Mandor OH 0.160 150,000.00 24,000.00
JUMLAH TENAGA KERJA 542,400.00
B BAHAN
Closet duduk Unit 1.000 3,500,000.00 3,500,000.00
Perlengkapan % 0.060 3,500,000.00 210,000.00
JUMLAH HARGA BAHAN 3,710,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,252,400.00
E Overhead & Profit 10% 425,240.00
F Harga Satuan Pekerjaan (D+E) 4,677,640.00

A.5.1.1.2. (K3) Pemasangan 1 buah closet Jongkok


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.000 110,000.00 110,000.00
Tukang batu OH 1.500 140,000.00 210,000.00
Kepala tukang OH 0.150 140,000.00 21,000.00
Mandor OH 0.160 150,000.00 24,000.00
JUMLAH TENAGA KERJA 365,000.00
B BAHAN
Closet jongkok Unit 1.000 800,000.00 800,000.00
Semen Portland Kg 6.000 1,800.00 10,800.00
Pasir Pasang M3 0.010 200,000.00 2,000.00
JUMLAH HARGA BAHAN 812,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,177,800.00
E Overhead & Profit 10% 117,780.00
F Harga Satuan Pekerjaan (D+E) 1,295,580.00

A.5.1.1.4. (K3) Pemasangan 1 buah Urinoir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.000 110,000.00 110,000.00
Tukang batu OH 1.000 140,000.00 140,000.00
Kepala tukang OH 0.100 140,000.00 14,000.00
Mandor OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 271,500.00
B BAHAN
Urinoir Unit 1.000 1,500,000.00 1,500,000.00
Semen Portland Kg 6.000 1,800.00 10,800.00
Pasir Pasang M3 0.010 200,000.00 2,000.00
Perlengkapan % 30.000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 1,962,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,234,300.00
E Overhead & Profit 10% 223,430.00
F Harga Satuan Pekerjaan (D+E) 2,457,730.00

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.200 110,000.00 132,000.00
Tukang batu OH 1.450 140,000.00 203,000.00
Kepala tukang OH 0.150 140,000.00 21,000.00
Mandor OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 365,000.00
B BAHAN
Wastafel Unit 1.200 1,500,000.00 1,800,000.00
Semen portland Kg 6.000 1,800.00 10,800.00
Pasir pasang M3 0.010 200,000.00 2,000.00
Perlengkapan % 12.000 18,128.00 217,536.00
JUMLAH HARGA BAHAN 2,030,336.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,395,336.00
E Overhead & Profit 10% 239,533.60
F Harga Satuan Pekerjaan (D+E) 2,634,869.00

A.5.1.1 7. (K3) Pemasangan 1 buah bak fibreglass vol 1 m3


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 3.000 110,000.00 330,000.00
Tukang batu OH 4.500 140,000.00 630,000.00
Kepala tukang OH 0.050 140,000.00 7,000.00
Mandor OH 0.900 150,000.00 135,000.00
JUMLAH TENAGA KERJA 551,000.00
B BAHAN
Bak fibreglass Unit 1.000 350,000.00 350,000.00
Perlengkapan % 12.000 3,500.00 42,000.00
JUMLAH HARGA BAHAN 392,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,218,500.00
E Overhead & Profit 10% 121,850.00
F Harga Satuan Pekerjaan (D+E) 1,340,350.00
A.5.1.1 14. Memasang 1 Buah Floor Drain (bahan Stainless)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.010 110,000.00 1,100.00
Tukang batu OH 0.100 140,000.00 14,000.00
Kepala tukang OH 0.010 140,000.00 1,400.00
Mandor OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 17,250.00
B BAHAN
Floor drain Unit 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102,250.00
E Overhead & Profit 10% 10,225.00
F Harga Satuan Pekerjaan (D+E) - 112,475.00

A.5.1.1 19. Memasang 1 Buah Kran Air (Kualitas Baik)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.010 110,000.00 1,100.00
Tukang batu OH 0.400 140,000.00 56,000.00
Kepala tukang OH 0.040 140,000.00 5,600.00
Mandor OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 63,450.00
B BAHAN
Kran air M 1.000 75,000.00 75,000.00
Sealtape Buah 0.025 25,000.00 625.00
JUMLAH HARGA BAHAN 75,625.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 139,075.00
E Overhead & Profit 10% 13,907.50
F Harga Satuan Pekerjaan (D+E) - 152,982.00

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0360 110,000.00 3,960.00
Tukang batu OH 0.0600 140,000.00 8,400.00
Kepala tukang OH 0.0060 140,000.00 840.00
Mandor OH 0.0020 150,000.00 300.00
JUMLAH TENAGA KERJA 13,500.00
B BAHAN
Pipa PVC 1/2” M 1.2000 8,000.00 9,600.00
Perlengkapan % 35.000 96.00 3,360.00
JUMLAH HARGA BAHAN 12,960.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 26,460.00
E Overhead & Profit 10% 2,646.00
F Harga Satuan Pekerjaan (D+E) - 29,106.00
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.054 110,000.00 5,940.00
Tukang batu OH 0.090 140,000.00 12,600.00
Kepala tukang OH 0.009 140,000.00 1,260.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Pipa PVC 2” M 1.200 25,000.00 30,000.00
Perlengkapan % 35.000 300.00 10,500.00
JUMLAH HARGA BAHAN 40,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 60,750.00
E Overhead & Profit 10% 6,075.00
F Harga Satuan Pekerjaan (D+E) - 66,825.00

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2,5”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.081 110,000.00 8,910.00
Tukang batu OH 0.135 140,000.00 18,900.00
Kepala tukang OH 0.014 140,000.00 1,890.00
Mandor OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 30,300.00
B BAHAN
Pipa PVC 2.5” M 1.200 60,000.00 72,000.00
Perlengkapan % 35.000 720.00 25,200.00
JUMLAH HARGA BAHAN 97,200.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 127,500.00
E Overhead & Profit 10% 12,750.00
F Harga Satuan Pekerjaan (D+E) - 140,250.00

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.081 110,000.00 8,910.00
Tukang batu OH 0.135 140,000.00 18,900.00
Kepala tukang OH 0.014 140,000.00 1,890.00
Mandor OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 30,300.00
B BAHAN
Pipa PVC 4” M 1.200 110,000.00 132,000.00
Perlengkapan % 35.000 1,320.00 46,200.00
JUMLAH HARGA BAHAN 178,200.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 208,500.00
E Overhead & Profit 10% 20,850.00
F Harga Satuan Pekerjaan (D+E) - 229,350.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 3.200 110,000.00 352,000.00
Tukang batu OH 1.150 140,000.00 161,000.00
Kepala tukang OH 0.011 140,000.00 1,540.00
Mandor OH 0.016 150,000.00 2,400.00
JUMLAH TENAGA KERJA 516,940.00
B BAHAN
Bata merah bh 70.000 1,200.00 84,000.00
Semen portland Kg 77.000 1,800.00 138,600.00
Pasir pasang M3 0.090 200,000.00 18,000.00
Kerikil M3 0.020 500,000.00 10,000.00
Baja tulangan Kg 2.600 13,900.00 36,140.00
JUMLAH HARGA BAHAN 286,740.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 803,680.00
E Overhead & Profit 10% 80,368.00
F Harga Satuan Pekerjaan (D+E) - 884,048.00

A.4.6.1. PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 7.0000 110,000.00 770,000.00
Tukang kayu OH 21.0000 140,000.00 2,940,000.00
Kepala tukang OH 2.1000 140,000.00 294,000.00
Mandor OH 0.3500 150,000.00 52,500.00
JUMLAH TENAGA KERJA 4,056,500.00
B BAHAN
Balok Kayu m3 1.1000 5,500,000.00 6,050,000.00
Paku Biasa kg 1.2500 25,000.00 31,250.00
Lem Kayu kg 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 6,111,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,167,750.00
E Overhead & Profit 10% 10% 1,016,775.00
F Harga Satuan Pekerjaan (D+E) - 11,184,525.00

A.4.6.1.22. Memasang 1 M1 Lisplank Papan Kayu Klas I, Ukuran (3 x 30) CM


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang kayu OH 0.2000 140,000.00 28,000.00
Kepala tukang OH 0.0200 140,000.00 2,800.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 42,550.00
B BAHAN
Kayu Papan m3 0.0110 3,000,000.00 33,000.00
Paku Biasa kg 0.0500 25,000.00 1,250.00
JUMLAH HARGA BAHAN 34,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 76,800.00
E Overhead & Profit 10% 10% 7,680.00
F Harga Satuan Pekerjaan (D+E) - 84,480.00
A.4.6.2. PEKERJAAN KUNCI DAN KACA

A.4.6.2.2. a Pemasangan 1 buah kunci


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.005 110,000.00 550.00
Tukang kayu OH 0.500 140,000.00 70,000.00
Kepala tukang OH 0.050 140,000.00 7,000.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 78,000.00
B BAHAN
Kunci tanam Bh 1.000 175,000.00 175,000.00
JUMLAH HARGA BAHAN 175,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 253,000.00
E Overhead & Profit 10% 25,300.00
F Harga Satuan Pekerjaan (D+E) - 278,300.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.015 110,000.00 1,650.00
Tukang kayu OH 0.150 140,000.00 21,000.00
Kepala tukang OH 0.015 140,000.00 2,100.00
Mandor OH 0.001 150,000.00 120.00
JUMLAH TENAGA KERJA 24,870.00
B BAHAN
Engsel pintu Bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,870.00
E Overhead & Profit 10% 5,487.00
F Harga Satuan Pekerjaan (D+E) - 60,357.00

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.010 110,000.00 1,100.00
Tukang kayu OH 0.100 140,000.00 14,000.00
Kepala tukang OH 0.010 140,000.00 1,400.00
Mandor OH 0.001 150,000.00 75.00
JUMLAH TENAGA KERJA 16,575.00
B BAHAN
Engsel kupu-kupu Bh 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 31,575.00
E Overhead & Profit 10% 3,157.50
F Harga Satuan Pekerjaan (D+E) - 34,732.00
A.4.6.2.9. Pemasangan 1 buah kait angin
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.015 110,000.00 1,650.00
Tukang kayu OH 0.150 140,000.00 21,000.00
Kepala tukang OH 0.015 140,000.00 2,100.00
Mandor OH 0.008 150,000.00 1,200.00
JUMLAH TENAGA KERJA 25,950.00
B BAHAN
Kait angin Bh 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 40,950.00
E Overhead & Profit 10% 4,095.00
F Harga Satuan Pekerjaan (D+E) - 45,045.00

A.4.6.2.10. Pemasangan 1 buah door closer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.050 110,000.00 5,500.00
Tukang kayu OH 0.500 140,000.00 70,000.00
Kepala tukang OH 0.050 140,000.00 7,000.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 82,950.00
B BAHAN
Door closer set 1.000 170,000.00 170,000.00
JUMLAH HARGA BAHAN 170,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 252,950.00
E Overhead & Profit 10% 25,295.00
F Harga Satuan Pekerjaan (D+E) - 278,245.00

A.4.6.2.11.a Pemasangan 1 buah kunci slot Jendela


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.020 110,000.00 2,200.00
Tukang kayu OH 0.200 140,000.00 28,000.00
Kepala tukang OH 0.020 140,000.00 2,800.00
Mandor OH 0.001 150,000.00 150.00
JUMLAH TENAGA KERJA 33,150.00
B BAHAN
Kunci slot Jendela Bh 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53,150.00
E Overhead & Profit 10% 5,315.00
F Harga Satuan Pekerjaan (D+E) - 58,465.00
A.4.6.2.23. Memasang 1 Buah Handle Pintu
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0500 110,000.00 5,500.00
Tukang kayu OH 0.5000 140,000.00 70,000.00
Kepala tukang OH 0.0500 140,000.00 7,000.00
Mandor OH 0.0025 150,000.00 375.00
JUMLAH TENAGA KERJA 82,875.00
B BAHAN
Handle Pintu Bh 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 127,875.00
E Overhead & Profit 10% 12,787.50
F Harga Satuan Pekerjaan (D+E) - 140,662.00

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0150 110,000.00 1,650.00
Tukang kayu OH 0.1500 140,000.00 21,000.00
Kepala tukang OH 0.0150 140,000.00 2,100.00
Mandor OH 0.0008 150,000.00 120.00
JUMLAH TENAGA KERJA 24,870.00
B BAHAN
Kaca tebal 5mm M2 1.1000 250,000.00 275,000.00
Sealant Kg 0.0500 45,000.00 2,250.00
JUMLAH HARGA BAHAN 275,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 300,995.00
E Overhead & Profit 10% 30,099.50
F Harga Satuan Pekerjaan (D+E) - 331,094.00

A.4.6.2.24. Memasang 1 Buah Handle Jendela


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0500 110,000.00 5,500.00
Tukang kayu OH 0.5000 140,000.00 70,000.00
Kepala tukang OH 0.0500 140,000.00 7,000.00
Mandor OH 0.0025 150,000.00 375.00
JUMLAH TENAGA KERJA 82,875.00
B BAHAN
Handle Jendela Bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102,875.00
E Overhead & Profit 10% 10,287.50
F Harga Satuan Pekerjaan (D+E) - 113,162.00
A.4.7.1. PEKERJAAN PENGECATAN

A.4.7.1.4 1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.070 110,000.00 7,700.00
Tukang cat OH 0.009 140,000.00 1,260.00
Kepala tukang OH 0.006 140,000.00 840.00
Mandor OH 0.003 150,000.00 375.00
JUMLAH TENAGA KERJA 10,175.00
B BAHAN
Cat Menie Kg 0.2000 60,000.00 12,000.00
Plamur Kg 0.1500 20,000.00 3,000.00
Cat Dasar Kg 0.1700 40,000.00 6,800.00
Cat Penutup Kg 0.2600 60,000.00 15,600.00
Kuas Buah 0.0100 30,000.00 300.00
Pengencer Kg 0.0300 15,000.00 450.00
Amplas Lbr 0.200 10,000.00 2,000.00
-
JUMLAH HARGA BAHAN 40,150.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 50,325.00
E Overhead & Profit 10% 5,032.50
F Harga Satuan Pekerjaan (D+E) - 55,357.00

A.4.7.1.24. Pengecatan 1 M2 Cat Water Shield Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Water Shield)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0200 110,000.00 2,200.00
Tukang cat OH 0.0630 140,000.00 8,820.00
Kepala tukang OH 0.0063 140,000.00 882.00
Mandor OH 0.0025 150,000.00 375.00
JUMLAH TENAGA KERJA 12,277.00
B BAHAN
Plamuur Kg 0.100 20,000.00 2,000.00
Cat dasar Kg 0.100 40,000.00 4,000.00
Cat Water Proofing 2 x (Wheater Shield) Kg 0.260 150,000.00 39,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,277.00
E Overhead & Profit 10% 5,727.70
F Harga Satuan Pekerjaan (D+E) - 63,004.00

A.4.7.1.25. Pengecatan 1 M2 Permukaan Baja Dengan Cat Kilat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0200 110,000.00 2,200.00
Tukang cat OH 0.2000 140,000.00 28,000.00
Kepala tukang OH 0.2000 140,000.00 28,000.00
Mandor OH 0.0100 150,000.00 1,500.00
JUMLAH TENAGA KERJA 59,700.00
B BAHAN
Cat Minyak / Kilat Kg 0.100 85,000.00 8,500.00
Kuas Kg 0.010 - -
JUMLAH HARGA BAHAN 8,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 68,200.00
E Overhead & Profit 10% 6,820.00
F Harga Satuan Pekerjaan (D+E) - 75,020.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.020 110,000.00 2,200.00
Tukang cat OH 0.063 140,000.00 8,820.00
Kepala tukang OH 0.006 140,000.00 882.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 12,352.00
B BAHAN
Plamuur Kg 0.100 20,000.00 2,000.00
Cat dasar Tembok Kg 0.100 40,000.00 4,000.00
Cat Penutup Tembok Interior Kg 0.260 100,000.00 26,000.00
JUMLAH HARGA BAHAN 32,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 44,352.00
E Overhead & Profit 10% 4,435.20
F Harga Satuan Pekerjaan (D+E) - 48,787.00

A.4.7.1.10.a Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.020 110,000.00 2,200.00
Tukang cat OH 0.063 140,000.00 8,820.00
Kepala tukang OH 0.006 140,000.00 882.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 12,352.00
B BAHAN
Plamuur Kg 0.100 20,000.00 2,000.00
Cat dasar Tembok Kg 0.100 40,000.00 4,000.00
Cat Penutup Tembok Exterior Kg 0.260 150,000.00 39,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,352.00
E Overhead & Profit 10% 5,735.20
F Harga Satuan Pekerjaan (D+E) - 63,087.00

Jenis Pekerjaan : Pengadaan Tiang Pancang uk.20 x 20 x 6 m, 4 D 13mm, K400


Satuan Pekerjaan : M'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Jumah Tenaga Kerja -
JUMLAH TENAGA KERJA -
B BAHAN
Pengadaan Tiang Pancang uk.20 x 20 x 6 m, 4 D 13mm, K400 M' 0.167 1,080,000.00 180,360.00
JUMLAH HARGA BAHAN 180,360.00
C PERALATAN - -
Mobilisasi M' 0.1667 210,000.00 35,000.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 197,860.00
E Overhead & Profit 10% 19,786.00
F Harga Satuan Pekerjaan (D+E) - 217,646.00

Jenis Pekerjaan : Pemancangan Tiang Pancang uk.20 x 20 x 6 m, 4 D 13mm, K400 13mm, K400
Satuan Pekerjaan : M'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Oh 0.0430 110,000.00 4,733.30
Tukang cat Oh 0.0801 140,000.00 11,214.00
Mandor Oh 0.0430 150,000.00 6,450.00
JUMLAH TENAGA KERJA 22,397.30
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pile Hammer Jam 0.0570 150,000.00 8,550.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 30,947.30
E Overhead & Profit 10% 3,094.73
F Harga Satuan Pekerjaan (D+E) - 34,042.00
PEKERJAAN : PEMELIHARAAN GEDUNG PADEPOKAN
LOKASI : KABUPATEN SINTANG, KALIMANTAN BARAT
SUMBER DANA : ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN

NO ITEM PEKERJAAN SATUAN

I. PEKERJAAN PENDAHULUAN
a. Pekerjaan Persiapan
1 Pembongkaran Dan Pembersihan lokasi Pkt
2 Dokumentasi Dan Papan Nama Proyek Pkt
3 Prancah Kerja Pkt

b. Penyelenggaraan SMKK Bangunan Gedung


A. PERLENGKAPAN K3
1 Penyiapan RKK
Pembuatan Prosedur dan Instruksi Kerja Ls
2 Sosialisasi & Promosi K3
Spanduk (Banner) Lmbr
Papan Informasi K3 Bh
3 Alat Pelindung Diri
Topi Pelindung (Safety Helmet) Bh
Pelindung Pernapasan dan Mulut (Masker) Kotak
Sarung Tangan (Safety Gloves) Psng
Rompi Keselamatan (Safety Vest) Bh
Sepatu Karet Keselamatan Psng
Handsatizer 500 ML Botol
4 Asuransi
Asuransi Kecelakaan Kerja Risiko Sangat Rendah
Mandor OB
Kepala Tukang OB
Tukang OB
Pekerja OB
5 Personel K3 Konstruksi
Ahli K3 OB
6 Fasilitas Sarana & Prasarana Kesehatan
Peralatan P3K (Kotak K3, Obat Luka, Obat Umum, Perban) Ls
7 Rambu-Rambu
Rambu Petunjuk Bh
Rambu Larangan Bh
Rambu Peringatan Bh
8 Pengendalian Risiko Keselamatan Konstruksi
Bendera K3 Ls
9 BPJS Tenaga Kerja Ls

II PEKERJAAN RING BALOK


1 Pekerjaan Pembesian tulangan Kg
2 Pekerjaan Bakesting M
3 Pekerjaan Cor Beton, mutu K.175 M
4 Plesteran Ring Balok M

III PEKERJAAN PINTU, KACA DAN VENTILASI


1 Ventilasi Kaca Bingkai Alumunium M

IV PEKERJAAN PLAFON
1 Rangka plafon baja ringan M
2 Rangka Plafond Bahan Kayu Kelas II M
3 Plafon Triplek t = 3 mm M
4 Plafon GRC Board M

V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan M
2 Pekerjaan Atap Zincalume Kotak 0.3 (Spandek Mini Colour) M
3 Pekerjaan Penutup prabung Seng BJLS polos 0.25 (colour) M

VI PEKERJAAN LANTAI
1 Pekerjaan Acian Lantai Area Sasana M

VII PEKERJAAN PENGECATAN


1 Pengecatang Lisplank M
2 Pengecatan Dinding Tembok Lama M
3 Pengecatan Plafon M

VIII PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Jaringan Instalasi Listrik (Kabel NYY Uk. 3 x 2,5 mm) M
2 Lampu Led Inbow 18 watt Bh
3 Lampu Led 30x120 48 watt Bh
4 Sakelar tunggal Bh
5 Sakelar ganda Bh
6 Saklar Triple Bh
7 Stop Kontak 2 Pole Bh
8 Kotak MCB Box Panel Bh

JUMLAH TOTAL
JUMLAH KOMULATIF
RENCANA KOMULATIF
TIME SCHEDULE

ABUPATEN SINTANG TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA BOBOT


KODE
VOLUME
ANALISA (Rp.) (Rp.) (%) MINGGU 1

1.00 - Rp 5,000,000.00 Rp 5,550,000.00 1.16 1.159


1.00 - Rp 500,000.00 Rp 555,000.00 0.12 0.116
1.00 - Rp 1,000,000.00 Rp 1,110,000.00 0.23 0.021

1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023

1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023


1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023

10.00 - Rp 50,000.00 Rp 555,000.00 0.12 0.116


5.00 - Rp 35,000.00 Rp 194,250.00 0.04 0.041
10.00 - Rp 25,000.00 Rp 277,500.00 0.06 0.058
10.00 - Rp 30,000.00 Rp 333,000.00 0.07 0.070
10.00 - Rp 150,000.00 Rp 1,665,000.00 0.35 0.348
8.00 - Rp 30,000.00 Rp 266,400.00 0.06 0.056
1.00 - Rp 50,000.00 Rp 55,500.00 0.01 0.001
1.00 - Rp 50,000.00 Rp 55,500.00 0.01 0.001
6.00 - Rp 50,000.00 Rp 333,000.00 0.07 0.006
3.00 - Rp 50,000.00 Rp 166,500.00 0.03 0.003

3.00 - Rp 1,000,000.00 Rp 3,330,000.00 0.70 0.232

1.00 - Rp 250,000.00 Rp 277,500.00 0.06 0.005

1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023


1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023
1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023

1.00 - Rp 100,000.00 Rp 111,000.00 0.02 0.023


1.00 - Rp 1,000,000.00 Rp 1,110,000.00 0.23 0.232
JUMLAH - I Rp 16,611,150.00

104.06 A.4.1.1.17 Rp 18,813.30 Rp 2,173,060.32 0.45


7.14 A.4.1.1.23 Rp 331,782.00 Rp 2,629,505.06 0.55
0.61 A.4.1.1.7. Rp 1,345,181.00 Rp 910,822.06 0.19
2.20 A.4.4.2.4 Rp 81,820.00 Rp 199,804.44 0.04
JUMLAH - II Rp 5,913,191.88

32.48 - Rp 1,000,000.00 Rp 36,052,800.00 7.53


JUMLAH - III Rp 36,052,800.00

221.00 - Rp 130,000.00 Rp 31,890,300.00 6.66


144.63 - Rp 100,000.00 Rp 16,053,930.00 3.35
680.00 A.4.5.1.7. Rp 48,257.00 Rp 36,424,383.60 7.60
391.70 A.4.5.1.7.a Rp 60,269.00 Rp 26,204,177.70 5.47
JUMLAH - IV Rp 110,572,791.30

271.04 - Rp 185,000.00 Rp 55,658,064.00 11.62


763.55 A.4.5.2.32. Rp 175,945.00 Rp 149,120,513.27 31.13
51.08 A.4.5.2.37 Rp 90,255.00 Rp 5,117,350.19 1.07
JUMLAH - V Rp 209,895,927.47

221.00 A.4.4.2.27. Rp 49,225.00 Rp 12,075,384.75 2.52


JUMLAH - VI Rp 12,075,384.75
42.24 A.4.7.1.4 Rp 55,357.00 Rp 2,595,490.44 0.54
97.88 A.4.7.1.10. Rp 48,787.00 Rp 5,300,551.43 1.11
1071.70 A.4.7.1.10. Rp 48,787.00 Rp 58,036,380.97 12.12
JUMLAH - VII Rp 65,932,422.85

200.00 - Rp 30,000.00 Rp 6,660,000.00 1.39


54.00 - Rp 150,000.00 Rp 8,991,000.00 1.88
9.00 - Rp 250,000.00 Rp 2,497,500.00 0.52
42.00 - Rp 30,000.00 Rp 1,398,600.00 0.29
12.00 - Rp 35,000.00 Rp 466,200.00 0.10
3.00 - Rp 40,000.00 Rp 133,200.00 0.03
8.00 - Rp 50,000.00 Rp 444,000.00 0.09
4.00 - Rp 300,000.00 Rp 1,332,000.00 0.28
JUMLAH - VIII Rp 21,922,500.00
Rp 478,976,168.24 100.00
2.625
2.625
LE

JADWAL PELAKSANAAN

MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8

0.021 0.021 0.021 0.021 0.021 0.021 0.021


0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.006 0.006 0.006 0.006 0.006 0.006 0.006
0.003 0.003 0.003 0.003 0.003 0.003 0.003

0.232

0.005 0.005 0.005 0.005 0.005 0.005 0.005

0.454
0.549
0.190
0.042

3.764

2.219 2.219 2.219


1.676 1.676
2.535 2.535
2.735 2.735

5.810 5.810
10.378 10.378 10.378
1.068
0.542
0.553
4.039

1.390
1.877

1.041 6.038 16.226 12.867 17.046 10.855 14.196


3.666 9.704 25.930 38.797 55.843 66.698 80.894
KET.
MINGGU 9 MINGGU 10 MINGGU 11

0.021 0.021 0.021


0.001 0.001 0.001
0.001 0.001 0.001
0.006 0.006 0.006
0.003 0.003 0.003

0.232

0.005 0.005 0.005

3.764

2.535

2.521
0.553
4.039 4.039

0.521
0.292
0.097
0.028
0.093
0.278

12.470 4.077 2.559


93.364 97.441 100.000