Professional Documents
Culture Documents
TS Gedung Padepokan
TS Gedung Padepokan
BOBOT
0 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0 #DIV/0!
JADWAL PELAKSANAAN
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
I. PEKERJAAN PENDAHULUAN Rp 16,611,150.00
II PEKERJAAN RING BALOK Rp 5,913,191.88
III PEKERJAAN PINTU, KACA DAN VENTILASI Rp 36,052,800.00
IV PEKERJAAN PLAFON Rp 110,572,791.30
V PEKERJAAN ATAP Rp 209,895,927.47
VI PEKERJAAN LANTAI Rp 12,075,384.75
VII PEKERJAAN PENGECATAN Rp 65,932,422.85
VIII PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 21,922,500.00
JUMLAH TOTAL Rp 478,976,168.24
PEMBULATAN Rp 478,970,000.00
TERBILANG : EMPAT RATUS TUJUH PULUH DELAPAN JUTA SEMBILAN RATUS TUJUH PULUH RIBU RUPIAH
SARAGAH AGUSTINUS
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMELIHARAAN GEDUNG PADEPOKAN
LOKASI : KABUPATEN SINTANG, KALIMANTAN BARAT
SUMBER DANA : ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN ANGGARAN 2023
I. PEKERJAAN PENDAHULUAN
a. Pekerjaan Persiapan
1 Pembongkaran Dan Pembersihan lokasi Pkt 1.00 - Rp 5,000,000.00 Rp 5,550,000.00
2 Dokumentasi Dan Papan Nama Proyek Pkt 1.00 - Rp 500,000.00 Rp 555,000.00
3 Prancah Kerja Pkt 1.00 - Rp 1,000,000.00 Rp 1,110,000.00
Di Buat Oleh,
Putussibau, 22 April 2022
CV. SAKTI UTAMA
SUDIRMAN
DIREKTUR
STANDARISASI HARGA BAHAN BANGUNAN & JASA PERALATAN
1 Pekerja OH Rp 110,000.00
2 Tukang OH Rp 140,000.00
3 Kepala Tukang OH Rp 140,000.00
4 Mandor OH Rp 150,000.00
A. BAHAN PENGISI
Pasir Halus M³ Rp 200,000.00
Batu pecah 1-2 cm M³ Rp 500,000.00
Batu pecah 2-3 cm M³ Rp 475,000.00
Tanah Timbunan M³ Rp 100,000.00
Bataco 20 x 40 x 7 cm ( press ) Bh Rp 3,000.00
Semen PC Zak Rp 90,000.00
Semen Warna (Oker) Kg Rp 20,000.00
Rooster bh Rp 30,000.00
B. BAHAN BESI & BAJA
Kawat Bindrat/Ikat Kg Rp 40,000.00
Kawat Las Listrik Kg Rp 50,000.00
Besi Beton Ø 10 Kg Rp 13,900.00
Besi Beton D 13 Kg Rp 13,900.00
Besi Beton D 16 Kg Rp 13,900.00
Wiremesh M6 Kg Rp 15,000.00
Besi Plat Kg Rp 20,000.00
Baut Bh Rp 8,000.00
Metal Furing M' Rp 11,250.00
Paku Campur Kg Rp 25,000.00
Paku 2-5" Kg Rp 25,000.00
Paku Triplek Kg Rp 30,000.00
Paku Gypsum Kg Rp 40,000.00
Skrup Fixer Bh Rp 1,500.00
Lem Kayu Kg Rp 30,000.00
C. BAHAN KAYU
Kayu Cerucuk Ø 8-10 panjang 4 m Btg Rp 15,000.00
Kayu Papan Mal M3 Rp 1,500,000.00
Papan Kayu Kelas I (Ketam) M3 Rp 10,000,000.00
Papan Kayu Kelas II (Ketam) M3 Rp 3,000,000.00
Papan Kayu Kelas III (Ketam) M3 Rp 2,000,000.00
Kayu Balok 5/10 Klas I M3 Rp 5,500,000.00
Kayu Balok 5/7 Klas III M3 Rp 3,000,000.00
Gypsum Profil List Plafond / Cornice M' Rp 15,000.00
Gypsum Board Tebal 4 mm Lbr Rp 85,000.00
GRC Board Tebal 4 mm Lbr Rp 85,000.00
Triplek 3mm Lbr Rp 55,000.00
HPL Lbr Rp 300,000.00
Multiplek 9 mm Lbr Rp 120,000.00
Multiplek 12 mm Lbr Rp 250,000.00
NO MATERIAL SATUAN HARGA SATUAN
D. BAHAN CAT
Cat Dasar Kg Rp 40,000.00
Cat Penutup Interior Kg Rp 100,000.00
Cat Penutup Exterior Kg Rp 150,000.00
Meni Besi Kg Rp 60,000.00
Dempul Kg Rp 20,000.00
Plamur Kg Rp 20,000.00
Kuas Bh Rp 30,000.00
Pengencer Kg Rp 15,000.00
Amplas Lbr Rp 10,000.00
E. BAHAN ATAP
Atap Zincalume 0.3 M2 Rp 88,000.00
Seng Gelombang BJLS 0,20 M2 Rp 50,000.00
Seng Gelombang BJLS 0,30 M2 Rp 80,000.00
Seng Plat BJLS 0,20 M2 Rp 80,000.00
Nok Genteng Metal M Rp 25,000.00
F. BAHAN KERAMIK
Keramik 60 x 60 cm Polished Bh Rp 275,000.00
Keramik 40 x 40 cm Unpolished Bh Rp 90,000.00
Keramik 30 x 30 cm Unpolished Bh Rp 90,000.00
Keramik 30 x 60 cm Bh Rp 90,000.00
ANALISA HARGA SATUAN PEKERJAAN
A.4.2.1.21.b Pemasangan 1 M2 Ranga Besi Hollow 40/40/1 mm, Modul 60 x 120 cm, untuk Partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.2500 110,000.00 27,500.00
Tukang Besi OH 0.2500 140,000.00 35,000.00
Kepala Tukang OH 0.2500 140,000.00 35,000.00
Mandor OH 0.1300 150,000.00 19,500.00
JUMLAH TENAGA KERJA 117,000.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 #NAME? #NAME?
Assesoris (perkuatan, las dll) Ls 0.2000 #NAME? #NAME?
JUMLAH HARGA BAHAN #NAME?
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #NAME?
E Overhead & Profit 10% #NAME?
F Harga Satuan Pekerjaan (D+E) - #NAME?
A.4.1.1. PEKERJAAN BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.2000 110,000.00 132,000.00
Tukang Batu OH 0.2000 140,000.00 28,000.00
Kepala Tukang OH 0.0200 140,000.00 2,800.00
Mandor OH 0.0600 150,000.00 9,000.00
JUMLAH TENAGA KERJA 171,800.00
B BAHAN
Semen portland kg 227.0000 1,800.00 408,600.00
Pasir Beton kg 869.0000 148.15 128,740.74
Kerikil (Maks 30 mm) kg 1000.0000 357.14 357,142.86
Air Liter 200.0000 -
JUMLAH HARGA BAHAN 894,483.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,066,283.60
E Overhead & Profit 10% 106,628.36
F Harga Satuan Pekerjaan (D+E) 1,172,911.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.0000 110,000.00 110,000.00
Tukang Batu OH 0.2500 140,000.00 35,000.00
Kepala Tukang OH 0.0250 140,000.00 3,500.00
Mandor OH 0.0500 150,000.00 7,500.00
JUMLAH TENAGA KERJA 156,000.00
B BAHAN
Semen portland kg 326.0000 1,800.00 586,800.00
Pasir Beton kg 760.0000 148.15 112,592.59
Kerikil (Maks 30 mm) kg 1029.0000 357.14 367,500.00
Air Liter 215.0000 -
JUMLAH HARGA BAHAN 1,066,892.59
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,222,892.59
E Overhead & Profit 10% 122,289.26
F Harga Satuan Pekerjaan (D+E) 1,345,181.00
A.4.5.1.7.a Memasang 1 M2 Langit Langit GRC Board Uk. 120 x 240 cm, Tebal 4 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.1000 110,000.00 11,000.00
Tukang Kayu OH 0.0500 140,000.00 7,000.00
Kepala tukang OH 0.0050 140,000.00 700.00
Mandor OH 0.0050 150,000.00 750.00
JUMLAH TENAGA KERJA 19,450.00
B BAHAN
GRC Board Tebal 4 mm M' 0.3640 85,000.00 30,940.00
Paku Triplek bh 0.1100 40,000.00 4,400.00
JUMLAH HARGA BAHAN 35,340.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,790.00
E Overhead & Profit 10% 5,479.00
F Harga Satuan Pekerjaan (D+E) - 60,269.00
A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 7.0000 110,000.00 770,000.00
Tukang kayu OH 21.0000 140,000.00 2,940,000.00
Kepala tukang OH 2.1000 140,000.00 294,000.00
Mandor OH 0.3500 150,000.00 52,500.00
JUMLAH TENAGA KERJA 4,056,500.00
B BAHAN
Balok Kayu m3 1.1000 5,500,000.00 6,050,000.00
Paku Biasa kg 1.2500 25,000.00 31,250.00
Lem Kayu kg 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 6,111,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,167,750.00
E Overhead & Profit 10% 10% 1,016,775.00
F Harga Satuan Pekerjaan (D+E) - 11,184,525.00
A.4.7.1.4 1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.070 110,000.00 7,700.00
Tukang cat OH 0.009 140,000.00 1,260.00
Kepala tukang OH 0.006 140,000.00 840.00
Mandor OH 0.003 150,000.00 375.00
JUMLAH TENAGA KERJA 10,175.00
B BAHAN
Cat Menie Kg 0.2000 60,000.00 12,000.00
Plamur Kg 0.1500 20,000.00 3,000.00
Cat Dasar Kg 0.1700 40,000.00 6,800.00
Cat Penutup Kg 0.2600 60,000.00 15,600.00
Kuas Buah 0.0100 30,000.00 300.00
Pengencer Kg 0.0300 15,000.00 450.00
Amplas Lbr 0.200 10,000.00 2,000.00
-
JUMLAH HARGA BAHAN 40,150.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 50,325.00
E Overhead & Profit 10% 5,032.50
F Harga Satuan Pekerjaan (D+E) - 55,357.00
A.4.7.1.24. Pengecatan 1 M2 Cat Water Shield Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Water Shield)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.0200 110,000.00 2,200.00
Tukang cat OH 0.0630 140,000.00 8,820.00
Kepala tukang OH 0.0063 140,000.00 882.00
Mandor OH 0.0025 150,000.00 375.00
JUMLAH TENAGA KERJA 12,277.00
B BAHAN
Plamuur Kg 0.100 20,000.00 2,000.00
Cat dasar Kg 0.100 40,000.00 4,000.00
Cat Water Proofing 2 x (Wheater Shield) Kg 0.260 150,000.00 39,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,277.00
E Overhead & Profit 10% 5,727.70
F Harga Satuan Pekerjaan (D+E) - 63,004.00
A.4.7.1.10.a Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.020 110,000.00 2,200.00
Tukang cat OH 0.063 140,000.00 8,820.00
Kepala tukang OH 0.006 140,000.00 882.00
Mandor OH 0.003 150,000.00 450.00
JUMLAH TENAGA KERJA 12,352.00
B BAHAN
Plamuur Kg 0.100 20,000.00 2,000.00
Cat dasar Tembok Kg 0.100 40,000.00 4,000.00
Cat Penutup Tembok Exterior Kg 0.260 150,000.00 39,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,352.00
E Overhead & Profit 10% 5,735.20
F Harga Satuan Pekerjaan (D+E) - 63,087.00
Jenis Pekerjaan : Pemancangan Tiang Pancang uk.20 x 20 x 6 m, 4 D 13mm, K400 13mm, K400
Satuan Pekerjaan : M'
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Oh 0.0430 110,000.00 4,733.30
Tukang cat Oh 0.0801 140,000.00 11,214.00
Mandor Oh 0.0430 150,000.00 6,450.00
JUMLAH TENAGA KERJA 22,397.30
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Pile Hammer Jam 0.0570 150,000.00 8,550.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 30,947.30
E Overhead & Profit 10% 3,094.73
F Harga Satuan Pekerjaan (D+E) - 34,042.00
PEKERJAAN : PEMELIHARAAN GEDUNG PADEPOKAN
LOKASI : KABUPATEN SINTANG, KALIMANTAN BARAT
SUMBER DANA : ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) KABUPATEN SINTANG TAHUN
I. PEKERJAAN PENDAHULUAN
a. Pekerjaan Persiapan
1 Pembongkaran Dan Pembersihan lokasi Pkt
2 Dokumentasi Dan Papan Nama Proyek Pkt
3 Prancah Kerja Pkt
IV PEKERJAAN PLAFON
1 Rangka plafon baja ringan M
2 Rangka Plafond Bahan Kayu Kelas II M
3 Plafon Triplek t = 3 mm M
4 Plafon GRC Board M
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan M
2 Pekerjaan Atap Zincalume Kotak 0.3 (Spandek Mini Colour) M
3 Pekerjaan Penutup prabung Seng BJLS polos 0.25 (colour) M
VI PEKERJAAN LANTAI
1 Pekerjaan Acian Lantai Area Sasana M
JUMLAH TOTAL
JUMLAH KOMULATIF
RENCANA KOMULATIF
TIME SCHEDULE
JADWAL PELAKSANAAN
0.232
0.454
0.549
0.190
0.042
3.764
5.810 5.810
10.378 10.378 10.378
1.068
0.542
0.553
4.039
1.390
1.877
0.232
3.764
2.535
2.521
0.553
4.039 4.039
0.521
0.292
0.097
0.028
0.093
0.278