SCHEDULE OF COLUMN SCHEDULE OF FOOTING SCHEDULE OF BEAMS

REINF:
8-16mm Ø Def.
SB. Bothways
FOUNDATION PLAN C1F1 DETAIL WALL FOOTING DETAIL
SCALE: 1:100M SCALE: 1:100M
CIVIL ENGINEER SEAL: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:
S
PRC ID: 0126242 PROPOSED TWO STOREY FOUNDATION PLAN
VALIDITY:02/16/2025 MRS. LUCENA MORANO MALQUISTO
06
C1F1 DETAIL
PTR NO.: 0465935 RESIDENTIAL BUILDING OWNER: WALL FOOTING DETAIL
DATE: 01/09/2023 LOCATION: BRGY. SORO-SORO, ADDRESS: BRGY.MANTAHAN, SCHEDULE OF FTNG. & COL. 1
HENRY GLENN P. LAYAM
TIN NO.:271-670-072 MAASIN CITY, SO. LEYTE MAASIN CITY, SOUTHERN LEYTE SCHEDULE OF BEAMS 3