Professional Documents
Culture Documents
A A
S.TG ROOM
C/L
W.B.T. F.O.S.T
F.O.T
(P&S) (P&S)
8 8 8 8 (P.C.S) CREW'S SPACE F.P.T
8 8
NO. 2 (W.B.T)
M M.B.
ENGINE ROOM H F.O.T MH MH
(P,C,S)
B MH
NO.3
B
F.W.T
C.D P&S
SKEG L.O.T(P)
D.O.T(S) S.C. SEWAGE NO.4
(P&S) P&S TANK
C.L
SECTION FR.02
(LOOKING FWD) BASELINE BL BL
SCALE 1 : 4
F.O.T (P)
V.L.
S.C .
W.B.T. NO. 2 M F.O.T(P)
(P) H NO.3
M
H
D D
600
200 M
H L.O.T(P) CREW'S 1900
MH
SPACE V.L.
FORE PEAK
F.O.T (C) F.O.T (C) F.O.S.T ENGINE M M (W.B.T)
M F.O.T(C) C.L.
NO. 1 NO. 2 (P) ROOM H H
H NO.3
C M C
L M H L
SEWAGE M
H TANK
H C.L.
F.O.S.T D.O.T(S)
500 (S) M M
1900
H H
T
MH
DET 2
M
E S.C . E
HPU
1000
BOTTOM VIEW
1 DET 1
Block Concrete 12 Pcs
SCALE 1 : 4
Shipyard : Kav 20, Dapur 12, Sei Lekop - SagulungBatam 29434 - Indonesia
Note : This drawing for one ship T: +62 778 7367 111 F: +62 778 7367 112
www.patriashipyard.com Scale Size Drawing No. Sheet Revision
1 2 3 4 5 6 7 8 9 10