1 2 3 4 5 6 7 8 9 10

LEGEND
A SYMBOL DESCRIPTION A

132kV BOC T/L 132kV DHABEJI T/L

GT GT GT
SA SA SA SA SA SA

240 sq. mm
Cu.STRANDED
CONDUCTOR
TO CONTROL HOUSE
BUILDING ECP

CC/LT CC/LT

B CC/LT PI CC/LT PI M.H B

Y Y

E04
E04 E02 E02
R R B
B

NOTES
MAIN GATE
4000x3000

GIS UNLOADING 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE NOTED.


C PLATFORM GIS HALL C
2. THE DRAWING SHALL BE REFLECTED ONLY FOR THE PURPOSE OF
EARTHING MESH.

CONCRETE BOUNDARY WALL


3. LOCATION OF COPPER CONDUCTOR/Y-G CABLE MAYBE ADJUSTED AT SITE

Line Y
TO AVOID ANY INTERFERENCE.

GATE 2
4. REFER DRAWING # P60199-E-SUB-LA-004 FOR GIS, AIS, CONTROL HOUSE
(=E06) =E05 =E04 =E03 =E02 =E01
E.EXIT BUILDING EQUIPMENT EARTHING DETAILS.
GATE 3

R
E05 B
R B

Y Y
Y
BA

VT(Main Metering) VT(Main


R

Metering)
D D
ME

CT(Main Metering) CT(Main


OR

4 M WIDE WALKWAY

Metering)
SF

VT(Backup Metering) VT(Backup


Metering)
AN

240 sq. mm
Cu.STRANDED
TR

CONDUCTOR
TO CONTROL HOUSE
BUILDING ECP
CT(Backup Metering) CT(Backup
Metering)
RE
TU

CSE CSE

E E
FU

AIS HALL
ENTRANCE

6 M WIDE ROAD
F F

6 M WIDE ROAD

CONDUCTOR
Cu.STRANDED

CONDUCTOR
Cu.STRANDED
TO MAIN MESH

240 sq. mm

TO MAIN MESH

240 sq. mm
FAUJI FERTILIZER BIN-QASIM LIMITED(FFBL)

G OMS (PVT) LTD G

60MW FFBL COAL POWER PLANT


D465x815
BIN QASIM KARACHI
1885
C.L

U-Clamp

U-CLAMP
ECP

SUBSTATION EARTHING LAYOUT


300 mm.sq.
EARTHING CONDUCTOR & EQUIPMENT EARTHING DETAILS

H H

1 2 3 4 5 6 7 8 9 10