1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B
FUTURE BOC S/S BUS COUPLER METERING DHABEJI S/S TRAFO 1 B

M M M M
1)2) 1)2) 1)2) 1)2)
C Q8 Q91/Q54 Q8 Q91/Q54 Q8 Q91/Q54 Q8 Q91/Q54 C

G91 G5 G91 G5 G91 G5 G91 G5


6) 6) 6) 6)
T5 T5 T5 T5
M M M M

D G9 G9 G9 G9 D
2) 2) 2) 2)
Q9/Q53 Q9/Q53 Q9/Q53 Q9/Q53
M M M M

P2 P2 P2 P2 P2
T1 T1 T1 T1
E E
T2
P1 P1 P1 P1 P1
3) 3) 3) 3) 3)
Q0 G0 Q0 G0 Q0 G0 Q0 G0 Q0 G0

P1
T1
F
P2 6)
T15 T25
6) F

G15 G25
2) 2) 2) 2) 2) 2) 2) 2)
2) Q2/Q52 2) Q2/Q52 Q10/Q51 Q20/Q52 Q1/Q51 Q2/Q52 2) Q2/Q52 2) Q2/Q52
Q1/Q51 Q1/Q51 Q1/Q51 Q1/Q51
M M M M M M M M
M M M M
G1 G2 G1 G2.1 G2 G10 G20 G1 G2 G1 G2 G1 G2
G
BB2 G

1)2)
M Q25
G1.1
BB1
M 1)2)
Q15
H H

(=E06) =E05 =E04 =E03 =E02 =E01


I I

SYMBOL DENOMINATION

3) Circuit breaker
J J

3-pole operated
sind vertraulich und somit geistiges Eigentum des Urhebers. Sie dürfen
ohne vorherige schrifliche Erlaubnis weder verbreitet, zur Verfügung
Dieses Dokument sowie alle Informationen und Daten, die es enthält,

gestellt, kopiert noch für irgendwelche Zwecke verwendet werden.

SYMBOL DENOMINATION
3-Position disconnector/
M earthing switch
Motor drive Gastight barrier
K
2) 3-Position disconnector/ K

M Insulated earthing switch


Motor drive Gastight barrier
with bypass valve
Insulated
1)2) earthing switch with
out in it are confidential and copyright property and must not
This document and any information or descriptive matter set

making capacity Voltage transformer


be disclosed, loaned, copied or used for any purpose

M Motor drive
whatsoever without prior written permission.

L L
Scale: 67:200 Unit: mm Format: A0 SEH 50 MW FFBL Coal Power Plant
D. Authority:
EC Nbr: ---- Q.Level: -- Local Unit: SEH
Fauji Fertilizer Bin Qasim Limited
Created: Canan ALTUNER 25/01/2016
Current transformer SF6 air bushing Reviewed: ---
Approved: Berkay CAKAN
Sheet:
--- Single Line Diagram
26/01/2016 132kV SF6-GIS
1/1 Rev.
GRID Product type:
Type F35-145kV
H53939_1000_110 05
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Only drawings bearing the number of the acknowledgment of order are binding fot the execution.
Nur mit der Nummer der Bestellungsbestätigung versehene Zeichnungen sind für die Ausführung verbindlich.
Creo/ProE