You are on page 1of 1
r CaIbATeT cAPTST ester ram Ci cabrAtngt, carenerte | al P35 TRA FE: 02-BUED2L9 HM) TATH-: 02-LUALYIT oe cae: mayor_kotali,poura@yahoo.com ees FT s07A0d oe Saas AU TATC /ACA:/ IMA) 2093-29) BLD fo ‘| Procun Entity Details: [a Dinision as = Dia = | | [ey Cirele/Directorate Dhaka = | | His-zenatepon a na | (a) Others (specif) a i. . OF | Name of Works Construction of Municipal Market with Ist, 2nd, 3rd Floor above Existing | Gin teach a 82 Nw 32 Non LED & 200 No, Solr Ste | gan c'vasea tnd with | No Conamicion of Public Tle ener | || ReeaPursne, Gopal unr Kear ourshva | | CaaS er (04 | Contractor's Legal Title DMCLEMLT ( ‘05 | Contractor's Contact Detail - *462/, Fre Service Road, Bedgram, Gopalgan} (06 | Contractor's Trade License! Enlistment] |r at 7 ate z KOTPOUR/ENGGTUGHPMU2030/92 (OF | Onginal Contract Price as in NOA + | BDT-1k22,8443,831.135 (Taka Twenty Two Crore Eighty Four Lakh Forty | Three Thousand Eight Hundred and Thirty One point One Three Five Paisa) a Salvaged amount (Fixed) BDT 00,00 (Taka Zero Point Zero Zero) = 05 | Final Contract Price as Executed 7) BDT-TK22, 78, 1842880 (Taka Twenty Two Corer Seventy Eight La Eightcen thousand Four hundred Twenty Eight point Eight Zero). TO" | Original Contract Period (a) Date of Commencement z OURO () Date of Completion 5 17077021 TT” [ Actual implementation Period | [(@) Date of Actual Commencement SOUR (6) Date of Actual Completion z 2ariar02i TE_| Days/Months Contract Period Extended NA | 15_| Amount of LD for Delayed Completion : NA 14” Physical Progress in Percent (i terms of value) —| + 100% 1S] Financial Progress in Amount (in terms of |: a payment) T5] Special Not (any) F s ils of Works Executed No “Major Components of Works ‘oial Value (in Lac Taka) ‘1 | Civil Works 135,537 948.73 (02 Sub-Station (1 Nos) 2,939,383 69 03 | Water Supply and Sanitation works 1,936,379.17 ‘04 | leexrical works W801, 887.48 (05. LED Stret light (382 Nos) 20,097,837 55 (06 | LED Street light (Solar) (200 Nos) 15,394,420.79 (07 | Public Toilet (I Nos) 2,080,374.39 | Certified that the Works under the Contract has been exeeuted and completed in all respects in strict compliance with the provisions of the Contract including all plans, designs, drawings, specifications and all modifications thereof as per direction and satisfaction of the Project ‘Manager/Engineer-in Charge/Other (speci) All defects in workmanship and materials reported during construction have been duly corrected. Ee jib Bhakta Ra rentbagineet see paiea

You might also like