Professional Documents
Culture Documents
Table 1: Information for Maximum Value of Works completed satisfactorily in any one year during Last Five Years (A)
NOTE: Information must be provided separately for Lead and Other Partners, in case of JV; Add more rows as per requirement.
Financial Year: 2020-2021
Procuring Payment received (
Contract Status Share in Contract Actual Payment
Sl Entity Name of works Contract Number As per payment
(On-going /Completed) (%) received (column 6X7)
Details certificate by PE)
1 2 3 4 5 6 7 8
1 Kotalipara PoPayment Certificate KO/PU/XEN/2021-22/813 Completed 48% 176,547,540.00 84,742,819.20
2 Gopalganj PoPayment Certificate GO/PU/2021-2022/1282 Completed 48% 96,721,050.00 46,426,104.00
3 Kotalipara PoPayment Certificate KO/PU/XEN/2022-23/816 Completed 49% 47,495,681.00 23,272,883.69
5 LGED GopalgPayment Certificate 21.2509 Completed 100% 5,485,496.00 5,485,496.00
6 LGED GopalgPayment Certificate 21.2509 Completed 100% 32,688,897.00 32,688,897.00
7 Gopalganj PoPayment Certificate GO/PU/2021-2022/86 Completed 49% 149,956,686.00 73,478,776.14
8 Gopalganj PoPayment Certificate GO/PU/2021-2022/1281 Completed 49% 70,420,342.00 34,505,967.58
9 Gopalganj PoPayment Certificate GO/PU/2021-2022/211 Completed 48% 70,224,560.00 33,707,788.80
10 Gopalganj PoPayment Certificate GO/PU/2021-2022/980 Completed 100% 4,096,090.00 4,096,090.00
11 LGED GopalgPayment Certificate 21.2979 Completed 100% 37,718,131.00 37,718,131.00
Total 394,301,953.41
Table 2: Information for Existing (Running) Works/Commitments (B)
Contract
Value of Completed Value of Value of the Completion (or Value of Existing Works or
Remaining
Contract Work as per uncompleted work Business Share (%) in uncompleted or extended, in commitments up to
Sl. Name of Work Procuring Entity Details Contract Value (BDT) Period in
No. certified progress or as of Tender the contract Committed work of case of completion date of this
years
cretified payment Submission the Firm amendment) intended work
Deadline Date
12=Col. (9), if (11)≤N;
1 2 3 4 5 6 7=Col. (5)-Col. (6) 8 9=Col. (7) X Col. (8) 10 11
Col. (9)*N/Col. (11), if (11)>N
Work in Single
1 847983 Part-A: Construction of RCC DrOffice of the Executive Engineer 7312793.40 30% 5,118,955.38 100% 5118955 5,118,955.38
1 864580 Construction of Two 2 Storied Executive Engineer, LGED, Gopal 29452589.31 10% 26,507,330.38 100% 26507330 26,507,330.38
Work in Joint Venture - 0 -
1 ee/gopal/devConstruction of 5- storied Offi Executive Engineer, Gopalganj 219744831.21 12% 193,375,451.46 10% 19337545 19,337,545.15
0 -
Total Value of Existing Works/Commitments, (B)= 50,963,830.91
Where
A=Maximum value of works performed in any one year during last 05 (five) years = 394,301,953.41
N= Completion time of the proposed work in years [N≥1] = 1
B= Value of existing commitments and works to be completed during the next N Years = 50,963,830.91
weMZ 5 (cuvP) eQ‡i m¤úvw`Z †gvU weMZ 5 (cuvP) eQ‡i m¤úvw`Z †gvU Kv‡Ri g‡a¨ mgq ewa©Z Kv‡Ri kZKiv nvi (%)
Kv‡Ri msL¨v mgq ewa©Z Kv‡Ri †gvU msL¨v
1 2 3(Kjvg2/Kjvg1)*100
159 wU cÖ‡hvR¨bq 0.00%
6t weMZ 5 (cuvP) eQ‡i µqKvix KZ©„K (Liquidity Damages) (LD) Av‡iv‡ci Z_¨|
weMZ 5 (cuvP) eQ‡i m¤úvw`Z †gvU weMZ 5 (cuvP) eQ‡i m¤úvw`Z †gvU Kv‡Ri g‡a¨ (Liquidity Damages) (LD) Av‡iv‡ci
Kv‡Ri msL¨v µqKvix KZ©„K (Liquidity Damages) (LD) Av‡iv‡ci kZKiv nvi (%)
Kv‡Ri †gvU msL¨v
1 2 3(Kjvg2/Kjvg1)*100
cÖ‡hvR¨bq
7t weMZ 5 (cuvP) eQ‡i µqKvix KZ©„K (Defect Liability Period) ewa©Zki‡Yi Z_¨vw`|
weMZ 5 (cuvP) eQ‡i m¤úvw`Z †gvU weMZ 5 (cuvP) eQ‡i †gvU Kv‡Ri g‡a¨ µqKvix (Defect Liability Period) ewa©Zki‡Yi
Kv‡Ri msL¨v KZ©„K (Defect Liability Period) ewa©Z Kv‡Ri kZKiv nvi (%)
†gvU msL¨v
1 2 3(Kjvg2/Kjvg1)*100
cÖ‡hvR¨bq