You are on page 1of 13

NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI
BATT BATT
+ _ + _

SINGLE LINE DIAGRAM

KONTRAKTOR

PT. PARTIBANDAR UTAMA


JUDUL GAMBAR

ASD SYSTEM
SINGLE LINE DIAGRAM

SKALA No. PROYEK

NTS -

PARAF TANGGAL

- -

TTC SOLO BARU SUKOHARJO


ASD SYSTEM
SINGLE LINE DIAGRAM NO. GAMBAR HALAMAN

01/PBU/EWS-TTC SOLO/2022 01 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI

SHAFT
PO
2694

GUDANG
FFL + 0.000 LOBY LIFT
FFL + 0.000 BUILD MANAGER

MUKA TANAH
FFL + 0.000

FFL -0.000
MUSHOLA
FFL + 4.800

FFL + 0.000
R.TUNGGU
4700

LUMBING
SHAFT

TOILET SELASAR PANTRY R.CCTV


FFL + 0.000
FFL + 4.800 FFL + 0.000 FFL + 0.000
1606

FFL + 0.000
R.TANGGA
BRANKAS
R.RAPAT DOCUMENT
FFL + 0.000 KONTRAKTOR

PT. PARTIBANDAR UTAMA

FFL + 0.000
JUDUL GAMBAR

TERAS
ASD SYSTEM
R.MANAGER 2

R.MANAGER 1

FFL + 0.000
LOBBY RUANG RUANG SHAFT WIRING INSTALLATION PLAN
FFL + 0.000 UTILITY A UTILITY B POWER
SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

- -

TTC SOLO BARU SUKOHARJO


WIRING INSTALLATION PLAN
DENAH LANTAI 01 NO. GAMBAR HALAMAN

02/PBU/EWS-TTC SOLO/2022 02 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI

IU 2.1 IU 2.2 IU 2.3 PP-PU/1 (LT .2) PP-VAC/P2.3

- -
+ + PU-I PAC-I

B CB UPS 1B

B CB UPS 1A
DCPDB DCPDB COS COS
OCS UPS
ACPDB
COS
IU 2.10 IU 2.11 IU 2.12 IU 2.13

RECT 2.1
B CB UPS 2A
B CB UPS 2B

UPS 1A

ISOTRA 4
COLECTOR L2

PANEL I/O
PDF

BATTERY UPS 1A BATTERY UPS 1A BATTERY UPS 1A

DCPDB -

1A

BATTERY HOPPECKE

BATTERY HOPPECKE
PANEL I/O

16 OPz 2000

16 OPz 2000
IO UPS

DCPDB +

24 Block

24 Block
2B

ISOTRA 3
BATTERY UPS 1B BATTERY UPS 1B BATTERY UPS 1B
VM 2 NGRS 4 NGRS 3 NGRS 2 NGRS 1

UPS 1B
OSCP

FM 200
BATTERY UPS 2A BATTERY UPS 2A BATTERY UPS 2A

ISOTRA 2
EMPETY RACK
R. OCS

UPS 2A
FM 200
OSCP

BATTERY VISION
PANEL I/O

ISOTRA 1
BATTERY UPS 2B BATTERY UPS 2B BATTERY UPS 2B

MDP AC

2A
FORTINET

BATTERY SHOTO
16 OPz 2000
PANEL I/O

24 Block
2B
NG SCP T-LINE

EMERGENCY MDP UTAMA

RECT 2.2
IO UPS UPS IO UPS UPS
RDU 1 B
RDU 1A

RDU 3A
RDU 2A

RDU 2B

RDU 3B
VM 1

BATTERY VISION
UPS 2B
NG SCP

INVERTER R. BATTERY
PANEL EMS

FM 200
FM 200

IU 2.4 IU 2.5 IU 2.6


ACPDB ACPDB T B MODUL
ACPDB 400 A RECT 1 RECT 2 F M200

DCPDB + DCPDB - DCPDB + DCPDB -


MKIOS MKIOS MKIOS ACTIVE MKIOS ACTIVE
OCS
COS PAC 2

COS DP-2
ACPDB

RACK CORE

RAN AGG

NBP 6

R. VAS/IN
SGSN
ACPDB

T-LINE

SUKOHARJO

NBP 5
PDF

SR

FM 200 IPDU A
PALLO ALTO
IDCWA

KONTRAKTOR
SUKOHARJO
SGSL 05

DCPDU

INROW
AC 1
SR
DCPDB -

MBP
NVS

PT. PARTIBANDAR UTAMA


INROW
RAN AGG

PDFSG

STORAGE 2
SL-05

AC 2

MFS EXP
SKH 1

MFS
2
OTB

MICS
P.DCP UPS

STORAGE 1
MFS

MFS EXP
NBP 4

1
ATAE
EBR-SLO.2

3
ROUTER
OFFICE

LBA

CONTROLER

JUDUL GAMBAR
STORAGE
NBP 1
USAU

NBP 3
SR SKH

SERVER
IT-2
PABX

EXPAND

MKIOS
UPS ESB
DCPDB

MFS
ATAE

2
+
-

ASD SYSTEM
RACK CPS

SERVER
IT-1
UPS ESB

MKIOS
URP
ATAE
DVR

1
1

WIRING INSTALLATION PLAN


SDP UPS
PP.VAC DVR CCTV OCS

DCPDB - DCPDB + ESB UPS ESB SOA

SKALA No. PROYEK


IU 2.7 IU 2.8 IU 2.9

1 : 100 -

PARAF TANGGAL

- -

TTC SOLO BARU SUKOHARJO


WIRING INSTALLATION PLAN
DENAH LANTAI 02 NO. GAMBAR HALAMAN

03/PBU/EWS-TTC SOLO/2022 03 / 13
HALAMAN
WIRING INSTALLATION PLAN
PEKERJAAN EALY WARNING SYSTEM TIER 3 DC

04 / 13
PT. PARTIBANDAR UTAMA
COMPLIANCE PAKET 2 TTC SOLO BARU

No. PROYEK

TANGGAL
SHOP DRAWING

-
ASD SYSTEM
KETERANGAN

04/PBU/EWS-TTC SOLO/2022
JUDUL GAMBAR
URAIAN REVISI

NO. GAMBAR
1 : 100
SKALA

PARAF

-
NAMA PROJECT

KONTRAKTOR
FM200

BATTERY HOPPECKE BATTERY HOPPECKE


16 OPz 2000 16 OPz 2000
24 Block 24 Block
IU 3.5

R. BATTERY

ACPDB

BATTERY SHOTO BATTERY HOPPECKE


16 OPz 2000 16 OPz 2000
24 Block 24 Block
IU 3.4

BATTERY SHOTO BATTERY HOPPECKE


TB Module

16 OPz 2000 16 OPz 2000


24 Block 24 Block
2 1 DSP 2 1 3
RECTIFIER MCBS POWER ONE POWER ONE INVERTER INVERTER INVERTER POWER ONE
P3.3
PP-PU/2 PP-VAC
PAC B PAC A
PANEL PANEL
6 5 4 3 2 1 STOREONCE
RACK RACK RACK RACK RACK RACK PET
PAC CLIMAVENETA
PAC CLIMAVENETA

2 1 12 11 10 9 8 7
SANSW SANSW RACK RACK RACK RACK RACK RACK
PAC CLIMAVENETA

DC A1
PDU

R. OPERATOR
DC B1
PDU

FM200

2 1
PRD-3PAR PRD-3PAR
PAC CLIMAVENETA

DCPDB + DCPDB -
DC A2
PDU

FM 200
RACK 14 13 STOREONCE 2 1
PANEL ATS

PAC CLIMAVENETA

ID LE RACK RACK RACK RACK


CONTAIMENT
CONTAIMENT
IU 3.3

IU 3.8
SECURITY 1 SECURITY 2
CYBER CYBER
GOLEN UNIT RACK RACK
ID LE ID LE
PANEL
WDS
SL-01 ALTO
PP-VAC-P

EBR FORTI NET PAL LO NGRS 5 CPS

DC B2
PDU
IU 3.2

KABEL POWER NYY 4X10mm²


GROUN DI NG N YA 6mm²
DCPDU MSS TMGW SOLO 5 SOLO 6
MGW MGW

HP SERVER HP SERVER
ITNES NSN ITNES NSN
PANEL ATS

IU 3.7

WIRING INSTALLATION PLAN


TTC SOLO BARU SUKOHARJO
SSU
RAN AGG
BCP VRR

R. SWITCHING
IT-AGG T-LINE

DENAH LANTAI 03
PP-VAC
OTB MGW OTB MGW
IU 3.1
FNA 2 FNA 1 SL01-01-F5 SL01-02-F5 SL01-03-F5

IU 3.6
PDF WH CGS LO 01 SGSL 04 XSL 03 RACK SR RACK OAM

COLLECTOR
DCPDB + DCPDB -
HUAWEI HUAWEI
ROUTER ROUTER HLR PDF
CS CS

FM 200
FM 200 FM 200
DCPDB - DCPDB + COS DP-3 ACPDB DCPDB + DCPDB - DCPDB
COS PU-2
HALAMAN
WIRING INSTALLATION PLAN
PEKERJAAN EALY WARNING SYSTEM TIER 3 DC

05 / 13
PT. PARTIBANDAR UTAMA
COMPLIANCE PAKET 2 TTC SOLO BARU

No. PROYEK

TANGGAL
SHOP DRAWING

-
ASD SYSTEM
KETERANGAN

05/PBU/EWS-TTC SOLO/2022
JUDUL GAMBAR
URAIAN REVISI

NO. GAMBAR
1 : 100
SKALA

PARAF

-
NAMA PROJECT

KONTRAKTOR

PLUMBING
SHAFT
BATTERY HOPPECKE BATTERY HOPPECKE
TB MODULE

16 OPz 2000 16 OPz 2000


FM-200

24 Block 24 Block FFL. + 14.400


IU 4.5

GUDANG
BATTERY HOPPECKE BATTERY HOPPECKE
TOILET
FM 200

16 OPz 2000 16 OPz 2000


24 Block 24 Block
FFL. + 14.400
IU 4.4

LOBBY LIFT
BATTERY HOPPECKE BATTERY HOPPECKE
16 OPz 2000 16 OPz 2000
24 Block 24 Block
R. BATTERY

FFL. + 14.350
BALKON
BSS 3 BSS 2 RECT 3 RECT 4
RECT RECT
FFL. + 14.350
BALKON
NK
PP-VAC/P4.1
PP-PU/3 DCPDB
PP-PAC/P42.3
FFL. + 14.400
FM 200

PP-VAV/P4.2

KORIDOR FFL. + 14.400


R. TANGGA
TB MODULE

TR
FM200
IU 4.3

SERVER CNO
PP.VAC
FFL. + 14.400
R. PANEL
IU 4.2

DP
JB-SS
& TESTING DATA
R. BSS

R. STAGGING SHAFT
SL BARU SL BARU
RNC RNC
FFL. + 14.400
IU 4.7

R. PATCH PANEL
FFL. + 14.400
DATA R. OPERATOR
SHAFT SUKOHARJO WURYANTORO
TC
TC
CEPER
TC

SOBA
BSC
SOBA
TC
SOBA
BSC
SOBA
TC
SOBA
RNC
SOBA
RNC
IU 4.6

T-LINE

IU 4.11
IU 4.1

RECT 3G INVERTER 3G
MGW-5 MGW-4 MGW-3 MGW-2
RACK RACK RACK RACK
HIT MGW
SURPAS
DWDM TELKOM
DCPDB - SL BARU SL BARU HUAWEI 03
DCPDB BSC DCPDB TC DCPDB
FM200

TB MODULE
FM 200

AC DAIKIN TB MODULE

FM200
PP-VAC/P4.3
DDF OTB
DATA
SHAFT

DCPDB DCPDB
AC DAIKIN

R. TRANSMISI
AC DAIKIN

IU 4.10
R. INTERKONEKSI

WIRING INSTALLATION PLAN


TTC SOLO BARU SUKOHARJO
DDF
DDF DDF DDF DDF DDF
DCPDU
T-LINE T-LINE
AC DAIKIN

DENAH LANTAI 04
IU 4.9
DDF 1 DDF 2 DDF 3
R. OSN HU/04/01 HU/03/01 R. OSN R. OSN R. OSN R. OSN

AC DAIKIN

IU 4.8
IDU SAGEM & PASOL NK
DCPDB HU/02 OTB OSP DWDM
NERA
DATA DDF 1 DDF 2 DDF 3
SHAFT
POWER
SHAFT COS DP-4 COS PU-3 DCPDB DCPDB DCPDB FO
SHAFT
FFL. + 14.350
R. TANGGA
FFL. + 14.350
BALKON
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI

SHAFT
PO
2694

GUDANG
FFL + 0.000 LOBY LIFT
FFL + 0.000 BUILD MANAGER

MUKA TANAH
FFL + 0.000

FFL -0.000
MUSHOLA
FFL + 4.800

FFL + 0.000
R.TUNGGU
4700

LUMBING
SHAFT

TOILET SELASAR PANTRY R.CCTV


FFL + 0.000
FFL + 4.800 FFL + 0.000 FFL + 0.000
1606

FFL + 0.000
R.TANGGA
BRANKAS
R.RAPAT DOCUMENT
FFL + 0.000

FFL + 0.000
TERAS
R.MANAGER 2

R.MANAGER 1

KONTRAKTOR

FFL + 0.000
LOBBY RUANG RUANG SHAFT PT. PARTIBANDAR UTAMA
FFL + 0.000 UTILITY A UTILITY B POWER
JUDUL GAMBAR

ASD SYSTEM
PIPING INSTALLATION PLAN

SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

TTC SOLO BARU SUKOHARJO - -


PIPING INSTALLATION PLAN
DENAH LANTAI 01
NO. GAMBAR HALAMAN

06/PBU/EWS-TTC SOLO/2022 06 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI

IU 2.1 IU 2.2 IU 2.3 PP-PU/1 (LT .2) PP-VAC/P2.3

- -
+ + PU-I PAC-I

B CB UPS 1A
B CB UPS 1B
DCPDB DCPDB COS COS
OCS UPS
ACPDB
COS
IU 2.10 IU 2.11 IU 2.12 IU 2.13

RECT 2.1
B CB UPS 2A
B CB UPS 2B

UPS 1A

ISOTRA 4
COLECTOR L2

PANEL I/O
PDF

BATTERY UPS 1A BATTERY UPS 1A BATTERY UPS 1A

DCPDB -

1A

BATTERY HOPPECKE

BATTERY HOPPECKE
PANEL I/O

16 OPz 2000

16 OPz 2000
IO UPS

DCPDB +

24 Block

24 Block
2B

ISOTRA 3
BATTERY UPS 1B BATTERY UPS 1B BATTERY UPS 1B
VM 2 NGRS 4 NGRS 3 NGRS 2 NGRS 1

UPS 1B
OSCP

FM 200
BATTERY UPS 2A BATTERY UPS 2A BATTERY UPS 2A

ISOTRA 2
EMPETY RACK
R. OCS

UPS 2A
FM 200
OSCP

BATTERY VISION
PANEL I/O

ISOTRA 1
BATTERY UPS 2B BATTERY UPS 2B BATTERY UPS 2B

MDP AC

2A
FORTINET

BATTERY SHOTO
16 OPz 2000
PANEL I/O

24 Block
2B
NG SCP T-LINE

EMERGENCY MDP UTAMA

RECT 2.2
IO UPS UPS IO UPS UPS
RDU 1 B
RDU 1A

RDU 2A

RDU 2B

RDU 3A

RDU 3B
VM 1

BATTERY VISION
UPS 2B
NG SCP

INVERTER R. BATTERY
PANEL EMS

FM 200
FM 200

IU 2.4 IU 2.5 IU 2.6


ACPDB ACPDB T B MODUL
ACPDB 400 A RECT 1 RECT 2 F M200

DCPDB + DCPDB - DCPDB + DCPDB -


MKIOS MKIOS MKIOS ACTIVE MKIOS ACTIVE
OCS
COS PAC 2

COS DP-2
ACPDB

RACK CORE

RAN AGG

NBP 6

R. VAS/IN
SGSN
ACPDB

T-LINE

SUKOHARJO

NBP 5
PDF

SR

IPDU A
FM 200
PALLO ALTO
IDCWA

SUKOHARJO
SGSL 05

DCPDU

INROW
AC 1
SR
DCPDB -

MBP
NVS
PDFSG

INROW
RAN AGG

STORAGE 2
SL-05

AC 2

MFS EXP
SKH 1

MFS
2
OTB

MICS

KONTRAKTOR
P.DCP UPS

STORAGE 1
MFS

MFS EXP
NBP 4
ATAE

1
EBR-SLO.2

3
ROUTER
OFFICE

LBA

PT. PARTIBANDAR UTAMA


CONTROLER
STORAGE
NBP 1
USAU

NBP 3
SR SKH

SERVER
IT-2
PABX

EXPAND

MKIOS
UPS ESB
DCPDB

MFS
ATAE

2
+
-

2
RACK CPS

SERVER

JUDUL GAMBAR
IT-1
UPS ESB

MKIOS
URP
ATAE
DVR

1
1

PP.VAC DVR CCTV OCS


ASD SYSTEM
PIPING INSTALLATION PLAN
DCPDB - DCPDB + ESB UPS ESB SOA

IU 2.7 IU 2.8 IU 2.9

SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

TTC SOLO BARU SUKOHARJO - -

PIPING INSTALLATION PLAN


DENAH LANTAI 02
NO. GAMBAR HALAMAN

07/PBU/EWS-TTC SOLO/2022 07 / 13
HALAMAN
PIPING INSTALLATION PLAN
PEKERJAAN EALY WARNING SYSTEM TIER 3 DC

08 / 13
PT. PARTIBANDAR UTAMA
COMPLIANCE PAKET 2 TTC SOLO BARU

No. PROYEK

TANGGAL
SHOP DRAWING

-
ASD SYSTEM
KETERANGAN

08/PBU/EWS-TTC SOLO/2022
JUDUL GAMBAR
URAIAN REVISI

NO. GAMBAR
1 : 100
SKALA

PARAF

-
NAMA PROJECT

KONTRAKTOR
FM200

BATTERY HOPPECKE BATTERY HOPPECKE


16 OPz 2000 16 OPz 2000
24 Block 24 Block
IU 3.5

R. BATTERY

ACPDB

BATTERY SHOTO BATTERY HOPPECKE


16 OPz 2000 16 OPz 2000
24 Block 24 Block
IU 3.4

BATTERY SHOTO BATTERY HOPPECKE


TB Module

16 OPz 2000 16 OPz 2000


24 Block 24 Block
2 1 DSP 2 1 3
RECTIFIER MCBS POWER ONE POWER ONE INVERTER INVERTER INVERTER POWER ONE
P3.3
PP-PU/2 PP-VAC
PAC B PAC A
PANEL PANEL
6 5 4 3 2 1 STOREONCE
RACK RACK RACK RACK RACK RACK PET
PAC CLIMAVENETA
PAC CLIMAVENETA

2 1 12 11 10 9 8 7
SANSW SANSW RACK RACK RACK RACK RACK RACK
PAC CLIMAVENETA

DC A1
PDU

R. OPERATOR
DC B1
PDU

FM200

2 1
PRD-3PAR PRD-3PAR
PAC CLIMAVENETA

DCPDB + DCPDB -
DC A2
PDU

FM 200
RACK 14 13 STOREONCE 2 1
PANEL ATS

PAC CLIMAVENETA

ID LE RACK RACK RACK RACK


CONTAIMENT
CONTAIMENT
IU 3.3

IU 3.8
SECURITY 1 SECURITY 2
CYBER CYBER
GOLEN UNIT RACK RACK
ID LE ID LE
PANEL
WDS

SL-01 ALTO
PP-VAC-P

EBR FORTI NET PAL LO NGRS 5 CPS


DC B2
PDU
IU 3.2

KABEL POWER NYY 4X10mm²


GROUN DI NG N YA 6mm²
DCPDU MSS TMGW SOLO 5 SOLO 6
MGW MGW
HP SERVER HP SERVER
ITNES NSN ITNES NSN
PANEL ATS

IU 3.7
SSU
RAN AGG
BCP VRR

R. SWITCHING
IT-AGG T-LINE

PP-VAC
OTB MGW OTB MGW

TTC SOLO BARU SUKOHARJO


PIPING INSTALLATION PLAN
IU 3.1

FNA 2 FNA 1 SL01-01-F5 SL01-02-F5 SL01-03-F5

IU 3.6
PDF WH CGS LO 01 SGSL 04 XSL 03 RACK SR RACK OAM

COLLECTOR

DENAH LANTAI 03
DCPDB + DCPDB -
HUAWEI HUAWEI
ROUTER ROUTER HLR PDF
CS CS

FM 200
FM 200 FM 200
DCPDB - DCPDB + COS DP-3 ACPDB DCPDB + DCPDB - DCPDB
COS PU-2
HALAMAN
PIPING INSTALLATION PLAN
PEKERJAAN EALY WARNING SYSTEM TIER 3 DC

09 / 13
PT. PARTIBANDAR UTAMA
COMPLIANCE PAKET 2 TTC SOLO BARU

No. PROYEK

TANGGAL
SHOP DRAWING

-
ASD SYSTEM
KETERANGAN

09/PBU/EWS-TTC SOLO/2022
JUDUL GAMBAR
URAIAN REVISI

NO. GAMBAR
1 : 100
SKALA

PARAF

-
NAMA PROJECT

KONTRAKTOR

PLUMBING
SHAFT
BATTERY HOPPECKE BATTERY HOPPECKE
TB MODULE

16 OPz 2000 16 OPz 2000


FM-200

24 Block 24 Block FFL. + 14.400


IU 4.5

GUDANG
BATTERY HOPPECKE BATTERY HOPPECKE
TOILET
FM 200

16 OPz 2000 16 OPz 2000


24 Block 24 Block
FFL. + 14.400
IU 4.4

LOBBY LIFT
BATTERY HOPPECKE BATTERY HOPPECKE
16 OPz 2000 16 OPz 2000
24 Block 24 Block
R. BATTERY

FFL. + 14.350
BALKON
BSS 3 BSS 2 RECT 3 RECT 4
RECT RECT
FFL. + 14.350
BALKON
NK
PP-VAC/P4.1
PP-PU/3 DCPDB
PP-PAC/P42.3
FFL. + 14.400
FM 200

PP-VAV/P4.2

KORIDOR FFL. + 14.400


R. TANGGA
TB MODULE

TR
FM200
IU 4.3

SERVER CNO
PP.VAC
FFL. + 14.400
R. PANEL
IU 4.2

DP
JB-SS
& TESTING DATA
R. BSS

R. STAGGING SHAFT
SL BARU SL BARU
RNC RNC
FFL. + 14.400
IU 4.7

R. PATCH PANEL
FFL. + 14.400
DATA R. OPERATOR
SHAFT SUKOHARJO WURYANTORO
TC TC
CEPER
TC
SOBA
BSC
SOBA
TC
SOBA
BSC
SOBA
TC
SOBA
RNC
SOBA
RNC
IU 4.6

T-LINE

IU 4.11
IU 4.1

RECT 3G INVERTER 3G
MGW-5 MGW-4 MGW-3 MGW-2
RACK RACK RACK RACK
HIT MGW
SURPAS
DWDM TELKOM
DCPDB - SL BARU SL BARU HUAWEI 03
DCPDB BSC DCPDB TC DCPDB
FM200

TB MODULE
FM 200

AC DAIKIN TB MODULE

FM200
PP-VAC/P4.3
DDF OTB
DATA
SHAFT

DCPDB DCPDB
AC DAIKIN

R. TRANSMISI
AC DAIKIN

IU 4.10
R. INTERKONEKSI
DDF
DDF DDF DDF DDF DDF
DCPDU
T-LINE T-LINE

TTC SOLO BARU SUKOHARJO


PIPING INSTALLATION PLAN
AC DAIKIN

IU 4.9
DDF 1 DDF 2 DDF 3
R. OSN HU/04/01 HU/03/01 R. OSN R. OSN R. OSN R. OSN

AC DAIKIN

IU 4.8

DENAH LANTAI 04
IDU SAGEM & PASOL NK
DCPDB HU/02 OTB OSP DWDM
NERA
DATA DDF 1 DDF 2 DDF 3
SHAFT
POWER
SHAFT COS DP-4 COS PU-3 DCPDB DCPDB DCPDB FO
SHAFT
FFL. + 14.350
R. TANGGA
FFL. + 14.350
BALKON
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI
Revisi 1

KONTRAKTOR

PT. PARTIBANDAR UTAMA


JUDUL GAMBAR

ASD SYSTEM
ISOMETRIC DRAWING

SKALA No. PROYEK

1 : 100 -

TTC SOLO BARU SUKOHARJO PARAF TANGGAL

ISOMETRIC DRAWING - -

DENAH LANTAI 01
NO. GAMBAR HALAMAN

10/PBU/EWS-TTC SOLO/2022 10 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

URAIAN REVISI
Revisi 1

KONTRAKTOR

PT. PARTIBANDAR UTAMA


JUDUL GAMBAR

ASD SYSTEM
ISOMETRIC DRAWING

Scale : N T S SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

TTC SOLO BARU SUKOHARJO - -

ISOMETRIC DRAWING
DENAH LANTAI 02
NO. GAMBAR HALAMAN

11/PBU/EWS-TTC SOLO/2022 11 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

ASD 7 (SWITCHING ROOM) SHOP DRAWING


ISOMETRIC DRAWING
KETERANGAN

URAIAN REVISI
Revisi 1

Scale : N T S

KONTRAKTOR

PT. PARTIBANDAR UTAMA


JUDUL GAMBAR

ASD SYSTEM
ISOMETRIC DRAWING

SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

TTC SOLO BARU SUKOHARJO - -

ISOMETRIC DRAWING
DENAH LANTAI 03 ASD 8 (SWITCHING ROOM)
ISOMETRIC DRAWING NO. GAMBAR HALAMAN

12/PBU/EWS-TTC SOLO/2022 12 / 13
NAMA PROJECT

PEKERJAAN EALY WARNING SYSTEM TIER 3 DC


COMPLIANCE PAKET 2 TTC SOLO BARU

SHOP DRAWING
KETERANGAN

Scale : N T S
URAIAN REVISI
Revisi 1

Scale : N T S

Scale : N T S

KONTRAKTOR

PT. PARTIBANDAR UTAMA


JUDUL GAMBAR

ASD SYSTEM
ISOMETRIC DRAWING

SKALA No. PROYEK

1 : 100 -

PARAF TANGGAL

TTC SOLO BARU SUKOHARJO - -

ISOMETRIC DRAWING
DENAH LANTAI 04
NO. GAMBAR HALAMAN

13/PBU/EWS-TTC SOLO/2022 13 / 13