Inspection Checklist for Air-Conditioning Services

JKR/MEK.AC/Insp:

SOUTHERN REGIONAL OFFICE (SRO)


JABATAN KERJA RAYA SARAWAK

INSPECTION CHECKLIST FOR AIR HANDLING UNIT (AHU) INSTALLATION

Project Title:
Location/Floor:
Drawing Ref:

Item Description Yes No N/A Remarks


1. Approved brand / model / make.
2. Clean, free from dirt, grease, rusty and etc.
3. Equipment in good condition.
4. Location / position as per approved drawing.
5. Vibration isolator installed and adjust correctly.
6. Header drain pipe check.
7. AHU to be double skinned type as per specifications.
8. Check pressure in/out, verify against design.
Check chilled water temperature in/out, verify against
9.
design.
10. Check water flow rate, verify against design.
11. Check blower fan running Amp., verify against design.
12. Check size of balancing valve used.
13. Check size of motorised modulating 2-way valve used.

Remarks:

Checked by Contractor: Inspected by JKR Representative (COW)

Sign: …................................................................ Sign: ….................................................................


Name: …............................................................. Name: …..............................................................
Date: …............................................................... Date: …................................................................