You are on page 1of 1

LEGEND ABBREVIATIONS:

PI-1

POINT OF INTERSECTION

PC - POINT OF CURVATURE

NORTH MERIDIAN PT - POINT OF TANGENCY


N
BM - BENCH MARK
101
100 CONTOUR
PI - POINT OF INTERSECTION

LIE - LEFT INVERT ELEVATION


CARRIAGEWAY
RIE - RIGHT INVERT ELEVATION

RROW - ROAD RIGHT OF WAY


STATIONING PER ONE HUNDRED METERS
STA. - STATION

PVI - POINT OF VERTICAL INTERSECTION


REFERENCES

LVC - LENGTH OF VERTICAL CURVE

CALIFORNIA BEARING RATIO Mo - MI`DDLE ORDINATE

g - GRADIENT IN %

BENCH MARK Azi - AZIMUTH

D - DISTANCE
EXISTING PCCP
EL - ELEVATION

CL - CENTERLINE OF ROADWAY
REINFORCED CONCRETE PIPE CULVERT (RCPC)

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: SUBMITTED: GROUP: MEMBERS: SET NO. SHEET NO.
DEPARTMENT OF CIVIL ENGINEERING IMPLEMENTING CONCRETE ROAD AT PARONDO, Jerle Mae
REGION XII BARANGAY CAGAWASAN, KIBAWE LEGENDS AND ASIM, Bai Juwairiah G 3
CEIT
ABBREVIATIONS
ENGR. BERNADETH V. DAPUN
INSTRUCTOR
GROUP 6 LARIDA, Peter John B.

KABACAN, NORTH COTABATO KIBAWE, BUKIDNON


ABDULLAH, Ben
BARAGUIR, Datu Sayyid Hadi
2 5 13

You might also like