Professional Documents
Culture Documents
999-U-05 - Cooling Water Supply & Return (CT To NBA Battery Limit) - Water Flushing Plan
999-U-05 - Cooling Water Supply & Return (CT To NBA Battery Limit) - Water Flushing Plan
Note:
1) All HPV / Hydro test vent to be lined-up during filling of FW
and one by one valve to be closed after water flushing
2) Approach to be made where ever require for operation of
piping components in accordance with P&ID & for installation of
temporary arrangements
3) All instrument valves to be closed during FW makeup &
opened one by one during flushing
Highlighted portion to
be dropped
18 X 12 " Temporary
Jumpover to be
installed at OSBL
side flange
A B C D E F G H J
7 7
6 6
TPP TPP
800-023 800-019
TPP
800-022
TPP
800-012
TPP TPP TPP TPP TPP TPP TPP TPP TPP TPP
800-018 800-010 800-020 800-005 800-006 800-013 800-014 800-025 800-015 800-017
TPP
800-011
4 4
3 3
Note:
1) All HPV / Hydro test vent to be lined-up during filling of FW
and one by one valve to be closed after water flushing
2) Approach to be made where ever require for operation of
piping components in accordance with P&ID & for installation of
temporary arrangements
2 2
999-U-05: Cooling Water Supply & Return (CT to NBA)
1 1
A1 A B C D E F G H J