Flushing point: Butterfly valve to be

kept open during flushing from existing


running header
Dotted highlighted
piping components to
be dropped
20 X 8" elbow to be prepared with 8" ball valve
connected with flexible hose towards nearby FW Tie-In gate valve to be opened for water
hydrant (30/11); flushing from existing running header
During FW water make up 8" valve will be lined up
towards FW hydrant;
Flushing point: During flushing hydrant connection to
be removed & water to be flushed towards open
trench located south side of cooling tower near Vendor
Vasu control room.
Flushing point: Butterfly valve to be
kept open during flushing from existing
running header
Tie-In gate valve to be opened for water
flushing from existing running header
20 X 8" elbow to be prepared with 8" ball valve connected
with flexible hose towards nearby FW hydrant (21C/01);
During FW water make up 8" valve will be lined up towards
FW hydrant;
During flushing hydrant connection to be removed & water to
be flushed towards open trench located west side of cooling
tower opposite CT pumps 2117-PM-02 A/B
Note:
1) All HPV / Hydro test vent to be lined-up during filling of FW
and one by one valve to be closed after water flushing
2) Approach to be made where ever require for operation of
piping components in accordance with P&ID & for installation of
temporary arrangements
3) All instrument valves to be closed during FW makeup &
opened one by one during flushing
999-U-05: Cooling Water Supply & Return (CT to NBA)
800-P17-SS01: CWS/CWR
NBA ISBL

Note:
1) All HPV / Hydro test vent to be lined-up during filling of FW
and one by one valve to be closed after water flushing
2) Approach to be made where ever require for operation of
piping components in accordance with P&ID & for installation of
temporary arrangements
3) All instrument valves to be closed during FW makeup &
opened one by one during flushing

Highlighted portion to
be dropped
18 X 12 " Temporary
Jumpover to be
installed at OSBL
side flange
A B C D E F G H J

7 7

6 6

TPP TPP
800-023 800-019
TPP
800-022

18" Temporary blind to be


removed & Tie-In flange to be TPP
5 800-021 5
re-instate
TPP
800-016

TPP
800-012
TPP TPP TPP TPP TPP TPP TPP TPP TPP TPP
800-018 800-010 800-020 800-005 800-006 800-013 800-014 800-025 800-015 800-017

TPP
800-011

4 4

3 3

Note:
1) All HPV / Hydro test vent to be lined-up during filling of FW
and one by one valve to be closed after water flushing
2) Approach to be made where ever require for operation of
piping components in accordance with P&ID & for installation of
temporary arrangements

2 2
999-U-05: Cooling Water Supply & Return (CT to NBA)