HYDROTEST SCHEMATIC DRAWING

PROJECT : Pembangunan Flowline Sumur Lindai-31 Siak Field


DESIGN PRESSURE : 300 PSIG
TEST PRESSURE : 450 PSIG
e
Pressur

Holding Time
100
75 %
50 %
25 %

15_ Min 04_ 15_ Min 15_ Min


15_ Min 15_ Min 15_ Min Time
(Hours)

Remarks : 25 % TP = 112.5 Psig ( 15 Minutes)

50 % TP = 225 Psig ( 15 Minutes)

75 % TP = 338 Psig ( 15 Minutes)

100% = 450 Psig (24 Hour)

75 % TP = 338 Psig ( 15 Minutes)

50 % TP = 225 Psig ( 15 Minutes)

25 % TP = 112.5 Psig ( 15 Minutes)

0 % TP = 0 Psig (Finish Test)

Prepared by, WitnessedBy Witnessed/Reviewed By


PT IRA JAYA SATRIA PT PERTAMINA EP PT PERTAMINA EP

Date : Date : Date :


PRESSURE TEST RECORD
Project : INJECTION MANIFOLD WTIP PACKAGES STRUKTUR KETALING TIMUR
SPK No. : 003/SPK/WTIP/18-110/JBI/2022 Date : 11-Oct-22
Owner : PT PERTAMINA EP Report No. : 001/HT/WTIP-KTT/IJS/2022
Main Contractor : PT IRA JAYA SATRIA Page : 1 of 1

TEST PACKAGE NO :
1. TP-KTT-WTIP-0001

DESIGN PRESSURE : 1650 Psig


TEST PRESSURE : 2475 Psig
MEDIUM TEST : WATER
HOLDING TIME : 4 Jam
TEMPERATURE
RECORDER (Barton) PRESSURE GAUGE
NO. TIME (Wib.) (°F) REMARKS
(Psig)
PRESSURE (Psig) TEMPERATURE (°F) AMBIENT
1 09:55 0 54 0 57 Start Pump

2 10:00 650 55 700 58 Start 25%

3 10:15 1250 55 1300 58 Start 50%

4 10:30 1900 62 1950 65 Start 75%

5 10:45 2500 77 2550 80 Start 100% (Holding Time)

6 11:15 2600 79 2650 82

7 11:45 2650 80 2700 83

8 12:15 2750 85 2800 88 Holding Time 100%

9 12:45 2850 90 2900 93

10 13:15 2950 93 3000 96

11 13:45 3050 93 3100 96 Holding Time 100%

12 14:00 3050 92 3100 95

13 14:15 3030 88 3080 91

14 14:50 3000 80 3050 83 Stop Holding Time

15 15:00 1900 70 1950 73 Release 75%

16 15:30 1250 65 1300 68 Release 50%

17 15:45 675 62 725 65 Release 25%

18 16:05 0 60 0 63 Stop Pump

Note:

Prepared by, Witnessed By Witnessed/Reviewed By


PT IRA JAYA SATRIA PT PERTAMINA EP PT PERTAMINA EP

Date : Date : Date :


PHOTOGRAPH HYDROSTATIC TEST