1 Cases Study
2 Design Principle
Dongcaiyuan Guannan Ziyang Road Luojia Road Changchun Street Miaodun Railway Station Changqing
Aggregation:
✓ Each Ring have 6
10GE 10GE 10GE
nodes in avg
40GE 40GE 40GE 10GE 40GE
✓ N*10GE or 40GE
Access:
GE/10GE GE/10GE GE/10GE GE/10GE
GE/10GE GE/10GE GE/10GE GE/10GE ✓ 3G NodeB: 6014
✓ 4G eNodeB: 7399
FE/GE ✓ 2G BTS: 6922
GE FE
TDM NodeB
eNodeB ILL/VPN
BTS
8361 Sets PAN Equipment in Wuhan City
3
Common Rules
100GE for Core All NEs are connected to one network for Each City
4
Agenda
1 Cases Study
2 Design Principle
3 CPAN Network Evolution
Access Network Design
Core Core
Core Core Core Core
Acce.
Aggr. Aggr.
Acce.
Aggr. Aggr. Aggr. Aggr.
Acce.
Acce.
Aggr. Aggr.
Aggr. Aggr.
Aggr. Aggr.
Aggr. Aggr.
Acce.
Acce.
Acce. Acce.
Aggr. Aggr.
Aggr. Aggr.
Acce. Acce.
Acce. Acce.
7
Aggregation Ring Bandwidth Calculation
Average 100 DSLAMs/ LMGs/ OLTs per Ring/Network Each BTS 2*E1=4M
Average 300 Broadband users per DSLAM/ LMG/ OLT Each 3G/Wi-Max 52M
8
Aggregation Network Design
PE Router PE Router
C650 C650
10GE
10GE
10GE
GE GE
C610A C610A
10
Core Network Design (Not planning now)
11
Typical Core Network
100GE
Traffic scheduling in Metro area
*4 nodes Ring
100GE 100GE
Key nodes of Aggregation Ring
12
Design Case
Before modification After modification
BNG
Aggregation level :
two nodes uplink
13
Design Case
MPLS/IP MPLS/IP
Aggregation level :
two nodes uplink
BNG
BNG Access level: BNG
MTS
Nagar MTS
Nagar
MTS
Nagar
Rama Phagwa MTS Rama
Mandi ra Nagar Mandi
Kapurtha Model
Model JP Nagar Nawa la Town
Town Nakoda Kapurthala
nshah Philau
r Phagwara JP Nagar
ar r
Philaur Nakodar
Nawanshahar
14
Agenda
1 Case Study
2 Design Principle
CR650
10G Ring
Two-node uplink
• Prevent from single-node failure
1G Ring
CR610A
Dual uplink
16
Topology for BSNL(Future-1)
RNC/BSC
1. Add 100GE PAN Node as Key node
of Aggregation Ring
2. Dual uplink to RNC/BSC
IP/MPLS
PE
3. Aggregation Ring Capacity upgrade
100GE to N*10GE
4. More Aggregation Ring to load the
bandwidth
N*10GE
1GE
CiTRANS 650 | B1,B2
17
Topology for BSNL(Future-2)
RNC/BSC
1. Add 2*100GE PAN Node as Traffic
scheduling layer
IP/MPLS
PE 2. Making diff-ring into single
network
100GE
3. MPLS VPN service shift from
MPLS Router to PAN
N*10GE
1GE
CiTRANS 650 | B1, B2
18
Topology for BSNL(Future-3)
4G MME
E/W/S/N RNC/BSC
ZONE 2G 3G 4G WiFi
100GE
ILL P2P VPN DSLAM
IP/MPLS
PE
100GE
1GE
CiTRANS 650 | B1, B2
19