JORI KALAN

PHASE 1 Recommended
ALI GNMENT
Start point
136
MURI SEMAR 12+000 +00 00
16 +0

16
12+000 32+ 0 4
16++00 20+ 000 14

4
0000 000

+0
0
36+00 40+
000

0
0
0+000 48+000
60+000 68+000 0
20 80+000 00
+0 0+
0+
00 12
0
00

17
0
PHASE 2

2+
00
4+ ALIGNMENT 2
00

00
6+
28+ 0 CHATRA
000

0
11
88
8+ +0
00 00
0
B MORE 36+000 0+000

00
100+000

188+0
40+0 16
00 0+
20+000 PANDAWA 00
ALIGNMET 3 0

0
+00
44

148
+0
00

0
56

00
GARHWA
+0

0+
00

18
60 16
+0 8+
00 00
0

0
00
0+
68

14
+0
00
0 12
+00 0+
108 00
0
0
00 00
000 100+0 I 12
8+
84+ PANK
MEDNINAGAR
000
80+

Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
H-1:2000 C:\Users\gourab.b\Desktop\logo.png

Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, Murisemar - Chatra DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
Ranchi-834002 (KM 0+00 TO KM 182+000) CE TESTING COMPANY PVT. LTD. REVISION MKD. - R0 SHEET NO. - 5
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
EAST-WEST CORRIDORS:- MURISEMAR- CHATRA-BARHI-BENGABAD-
REVISIONS MADHUPUR-SARATH-PALAJORI-DUMKA HIGHWAY CORRIDOR PACKAGE -I G.B M.B S.C S.B
Nirsha

4+
Mugma

00
0
0

0+ 000
00
0+
8+0
00

Aligment 3 16+000
0
12+00 00
5+
0

10+000

32+000 Baliyapur 20
00
28+0

0+000
+0 15+0
00 0 0
36 20+0 24+000
+0 00
0 0

40+000

25+
4+00
0

000
Sindri
44+0

00
8+0
00

00
16+0

0
Recommended Alignment
35+000 2+00
48+00

0+ 3
00
0

0
40+0

Alignment 2
00
52
+ 00

45+00
0
0

Chandan Kiyari
50+000
56
+0
00

End point
55
+0
0 0

Bodma
Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
H-1:2000 NIRSA-CHANDANKIYARI
..\..\..\OneDrive\Desktop\images.png
C:\Users\gourab.b\Desktop\logo.png

Ranchi-834002 CE TESTING COMPANY PVT. LTD.


(KM 00+000 TO KM 58+000) REVISION MKD. - R0 SHEET NO. - 5
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
JHARKHAND EASTEN CORRIDORS:- ii) Jharkhand Eastern Corridor :- Sahebganj-Jamtara-Nirsa
REVISIONS Sindri-Chandankiyari-Chandil Highway Corridor (Excluding Sahebganj to Jamtara Section). PACKAGE -I G.B M.B S.C S.B
0 00 Alignment 3
16+

00
24+

12+0
000
ITKORI
28
+0
Bhadrakali Tem 00 BARHI
p le

32
PHA

+0
Alignment 2

00
0
00
BA

4+
PHASE 3 0+000
0+00
0 00 4+000
0
0
0+ +00 12+000
0
32+ 20+0
000 00
0
24+00 28+000
17

PHASE 2 40
0 +0
2+

00 00
6+
00

CHATRA 1
0

0 Recommended PADMAA
8+00 ALIGNMENT
0+000
48+000
00
188+0

56+0
00
JUHUU
0
00
0+
18

Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
H-1:2000 Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, CHATRA - BARHI (Phase-2)
C:\Users\gourab.b\Desktop\logo.png

Ranchi-834002 (KM 0+000 TO KM 58+000) CE TESTING COMPANY PVT. LTD. REVISION MKD. - R0 SHEET NO. - 5
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
EAST-WEST CORRIDORS:- MURISEMAR- CHATRA-BARHI-BENGABAD-
REVISIONS MADHUPUR-SARATH-PALAJORI-DUMKA HIGHWAY CORRIDOR PACKAGE -I G.B M.B S.C S.B
000

32
+0
00 52+00
28+

0 ALIGNMENT 2
60+000
36+00 64+00 BENGABAD
0 0 PHASE 4
PHASE 3 40+ 72+000
000
DOMCHANCH 44+000 80+000 88+00
0
20+000

96+000
BARHI 104+000
44+000 Recommended 108+0
ALIGNMENT 00
0+000
000

8+000
12+000 52+000
36+

0+00
0
80+ 0
000 00

11
60+ 0
000 +00 0+

2+
16+000 100 0

00
88+0 +00
0+000 08+00 0

0
00 1
28+000
BIRNI
16+000 24+0
00

000
4+
12

10
+0
00

00
72+0 96+000

+0
00

88
00
00 80+0
20 64+0
+0
UHUU 00

ALIGNMENT 3
00

28+
+0

000
56

48+000
40+000

Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
H-1:2000 Barhi-Bengabad(Phase-3)
C:\Users\gourab.b\Desktop\logo.png

Ranchi-834002 CE TESTING COMPANY PVT. LTD. SHEET NO. - 5


(KM 00+000 TO KM 110+000) REVISION MKD. - R0
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
EAST-WEST CORRIDORS:- MURISEMAR- CHATRA-BARHI-BENGABAD-
REVISIONS MADHUPUR-SARATH-PALAJORI-DUMKA HIGHWAY CORRIDOR PACKAGE -I G.B M.B S.C S.B
BENGABAD
Curve No.
R (m) 1000
Lc (m) 710.230
Ls (m) 30
Δ 42°24'43"
e

Design Sp.

ALIGNMENT 2

28
8+00 16+ +0
108+0 0 000 00
00

32+
PHASE 5

000
00
11

+ 0
40+000
2+

0 0
000 8+00
00

+
0 2
108+ 00 8+000
0

0
20+00 32 000
PHASE 4 +0 +
MADHUPUR 00 60
56+000
0
00
40+
000 48+0 SARATH
0 0

Recommended
ALIGNMENT

Office of the Executive Engineer Planning & Investigation Division, TITLE : ALIGNMENT OPTION STUDY
H-1:2000 C:\Users\gourab.b\Desktop\logo.png

Road Construction Department,Nirupan Bhawan, Third Floor, Doranda, DWG. NO. CET/4668/RCD/PKG-I/EWC/AOS
Bengabad to Sarath(Phase-4)
Ranchi-834002 (KM 00+000 TO KM 54+000)
CE TESTING COMPANY PVT. LTD. SHEET NO. - 5
REVISION MKD. - R0
PACKAGE-1/CORRIDORS CONSULTANCY SERVICES FOR FEASIBILITY STUDY SUBMISSION TYPE: 124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. ISSUED BY.
AND DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION TO 2-LANE WITH KOLKATA - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. SEP, 2023 PAVED SHOULDER/4-LANE CONFIGURATION OF PROPOSED CORRIDOR FEASIBILITY REPORT
EAST-WEST CORRIDORS:- MURISEMAR- CHATRA-BARHI-BENGABAD-
REVISIONS MADHUPUR-SARATH-PALAJORI-DUMKA HIGHWAY CORRIDOR PACKAGE -I G.B M.B S.C S.B
(KM 0+000 TO KM 41+280)