You are on page 1of 3

Jl.

Pangeran Antasari 12, Cipete Selatan, Jakarta 12410


p: 6221 7692344 f: 6221 7691322
e: info@hadiprana.co.id www.hadiprana.co.id

Finishes and Material Specification Sheet


PROJECT : APARTMENT ADIWANGSA PROJECT NO. : 17558B00
MAKASSAR ISSUED DATE : 8/6/2018

CODE ITEM : GL-01 ITEM DISCRIPTION : Grey mirror

Order Ref Decomirror - grey mirror Manufacturer ASAHIMAS


Source PT Asahimas Flat Glass
Specification Address Jl Ancol IX/5 Ancol Barat
Remark Jakarta 14430
Indonesia
Dimensions See Drawing Documents

Drawing Ref

Room/ Area General

Contact Tel/Fax Bp. Rifan Pramanda


Hp : 0817621455
Tel : 021-6927829/6904041 ext 3120
Fax : 021-6918709/6911928
E-mail : rifan.pramanda@agc.com
Web site : www.amfg.co.id
CODE ITEM : GL-02 ITEM DISCRIPTION : GREY GLASS

Order Ref Grey glass Manufacturer ASAHIMAS


Source PT Asahimas Flat Glass
Specification Dark grey Address Jl Ancol IX/5 Ancol Barat
Remark Jakarta 14430
Indonesia
Dimensions See Drawing Documents

Drawing Ref

Room/ Area General

Contact Tel/Fax Bp. Rifan Pramanda


Hp : 0817621455
Tel : 021-6927829/6904041 ext 3120
Fax : 021-6918709/6911928
E-mail : rifan.pramanda@agc.com
Web site : www.amfg.co.id

NOTES : 1. The related materials must accord with the quality in contract and suitable for commercial use.
2. The related materials must accord with the autochthonous government's rule, flammability standard and other requirements.
3. Before cutting and delivering material by manufacturers, should deliver the color card/ sample to the design company to approve.
4. The related materials should make antipollution and dirt repellent treatment
5. The manufacturers must make a double check with the interior contractor about the quantity, size and requirements.
6. The related materials must be cut from the original roll/ full first grade (the proximate grade not acceptable) and must be cut accurately.
7. The related wallpaper/ gleu mat/ fireproofing rubber sheet/ plywood must be delivered directly and in rolls by ship and don’t be cockled.

PHASE
DESIGN DEVELOPMENT CONSTRUCTION DOCUMENT
This print is propperty of Grahacipta Hadiprana and shall not be traced, photograph, or reproduced in any manner, nor use for any purpose whatsoever except by written permission of Grahacipta
Hadiprana

FR/PR-03/10/00
Jl. Pangeran Antasari 12, Cipete Selatan, Jakarta 12410
p: 6221 7692344 f: 6221 7691322
e: info@hadiprana.co.id www.hadiprana.co.id

Finishes and Material Specification Sheet


PROJECT : APARTMENT ADIWANGSA PROJECT NO. : 17558B00
MAKASSAR ISSUED DATE : 8/6/2018

CODE ITEM : GL-03 ITEM DISCRIPTION : CLEAR GLASS

Order Ref Clear glass Manufacturer ASAHIMAS


Source PT Asahimas Flat Glass
Specification Tempered glass Address Jl Ancol IX/5 Ancol Barat
Remark Jakarta 14430
Indonesia
Dimensions See Drawing Documents

Drawing Ref

Room/ Area General

Contact Tel/Fax Bp. Rifan Pramanda


Hp :
Tel : (021) 633 2468; 631 6526
Fax : 632 9522
E-mail : localsales@roxyglass.com
Web site : www.roxyglass.com
CODE ITEM : GL-04 ITEM DISCRIPTION : EXTRA CLEAR GLASS

Order Ref Extra Clear glass Manufacturer ASAHIMAS


Source PT Asahimas Flat Glass
Specification Tempered glass Address Jl Ancol IX/5 Ancol Barat
Remark Extra Clear glass Jakarta 14430
Indonesia
Dimensions See Drawing Documents

Drawing Ref

Room/ Area Kitchen

Contact Tel/Fax Bp. Rifan Pramanda


Hp : 0817621455
Tel : 021-6927829/6904041 ext 3120
Fax : 021-6918709/6911928
E-mail : rifan.pramanda@agc.com
Web site : www.amfg.co.id

NOTES : 1. The related materials must accord with the quality in contract and suitable for commercial use.
2. The related materials must accord with the autochthonous government's rule, flammability standard and other requirements.
3. Before cutting and delivering material by manufacturers, should deliver the color card/ sample to the design company to approve.
4. The related materials should make antipollution and dirt repellent treatment
5. The manufacturers must make a double check with the interior contractor about the quantity, size and requirements.
6. The related materials must be cut from the original roll/ full first grade (the proximate grade not acceptable) and must be cut accurately.
7. The related wallpaper/ gleu mat/ fireproofing rubber sheet/ plywood must be delivered directly and in rolls by ship and don’t be cockled.

PHASE
DESIGN DEVELOPMENT CONSTRUCTION DOCUMENT
This print is propperty of Grahacipta Hadiprana and shall not be traced, photograph, or reproduced in any manner, nor use for any purpose whatsoever except by written permission of Grahacipta
Hadiprana

FR/PR-03/10/00
Jl. Pangeran Antasari 12, Cipete Selatan, Jakarta 12410
p: 6221 7692344 f: 6221 7691322
e: info@hadiprana.co.id www.hadiprana.co.id

Finishes and Material Specification Sheet


PROJECT : APARTMENT ADIWANGSA PROJECT NO. : 17558B00
MAKASSAR ISSUED DATE : 8/6/2018

CODE ITEM : GL-05 ITEM DISCRIPTION : CRYSTAL

Order Ref Tear drop glass Manufacturer By interior contractor


Source
Specification Address
Remark

Dimensions See Drawing Documents

Drawing Ref

Room/ Area Dining room

Contact Tel/Fax By interior contractor


Hp :
Tel :
Fax :
E-mail :
Web site :
CODE ITEM : GL-06 ITEM DISCRIPTION : MIRROR

Order Ref Mirror Manufacturer ASAHIMAS


Source PT Asahimas Flat Glass
Specification Address Jl Ancol IX/5 Ancol Barat
Remark Jakarta 14430
Indonesia
Dimensions See Drawing Documents

Drawing Ref

Room/ Area General

Contact Tel/Fax Bp. Rifan Pramanda


Hp : 0817621455
Tel : 021-6927829/6904041 ext 3120
Fax : 021-6918709/6911928
E-mail : rifan.pramanda@agc.com
Web site : www.amfg.co.id

NOTES : 1. The related materials must accord with the quality in contract and suitable for commercial use.
2. The related materials must accord with the autochthonous government's rule, flammability standard and other requirements.
3. Before cutting and delivering material by manufacturers, should deliver the color card/ sample to the design company to approve.
4. The related materials should make antipollution and dirt repellent treatment
5. The manufacturers must make a double check with the interior contractor about the quantity, size and requirements.
6. The related materials must be cut from the original roll/ full first grade (the proximate grade not acceptable) and must be cut accurately.
7. The related wallpaper/ gleu mat/ fireproofing rubber sheet/ plywood must be delivered directly and in rolls by ship and don’t be cockled.

PHASE
DESIGN DEVELOPMENT CONSTRUCTION DOCUMENT
This print is propperty of Grahacipta Hadiprana and shall not be traced, photograph, or reproduced in any manner, nor use for any purpose whatsoever except by written permission of Grahacipta
Hadiprana

FR/PR-03/10/00

You might also like