Professional Documents
Culture Documents
TERMS OF CONTRACT
1
Definition
2
Features
3 Terms in Contract
Deal
Money
When ( Art.59):
• On the date fixed by or
determinable from the
contract without the need for
any request or compliance
with any formality on the part
of the seller
706021- Chapter 4: Terms of contract 13
Features
The trading parties in different
countries the fundamental
principle of international contract law
Country of
Seller
Vietnam commercial
Domestic law law 2005
Country of
buyer
706021- Chapter 4: Terms of contract 16
Applicable law
International Law
Four categories:
Import
Terms and
conditions
Final
24
PERTINENT CLAUSES
MANDATORY OPTIONAL
Article 1: Commodity Article 7: Packing and
Article 2: Specification/ marking
Quality Article 8: Penalty
Article 3: Quantity Article 9: Insurance
Article 4: Price Article 10: Force majeure
Article 5: Payment Article 11: Claim
Article 6: Shipment Article 12: Arbitration
Article 13: Other terms and
conditions
Sale by sample
Lounge armchair
(1.040 x 600 x 450)mm x 2 pcs
Love armchair
(590 x 610 x 840)mm x 2 pcs
F.A.Q.,
Moisture (max.) 13%
Admixture (max.) 5%
Oil content (min.) 44%
In the sales of
machines, precision
instruments, complete
sets of equipment and
the like.
Where as: n
WT : theorical weight
WT Vi mi S i
Vi : volume of 1 unit
i 1
mi: natural weight
Si: the total number of goods
Fixed price:
• The price has been set in the contract
when the agreement concluded, and is
held constant for a specified period of
time
• Normally, the price is not subject to any
adjustment unless certain provisions
(such as contract change, economic
pricing, or defective pricing) are included
in the agreement
706021- Chapter 4: Terms of contract 57
ARTICLE 4: PRICE
Flexible price:
• The price has been set in the contract
when the agreement concluded, but
• The price is open to negotiations
between buyers and sellers, and
allow for bargaining within a certain
range (ex: the market price is
escalate over 10%).
ARTICLE 4: PRICE
Sliding price: b c
P1 P0 A B C
1 1
b0 c0
Where as:
C: rate of wage cost
A+B+C=100% c0: cost of wage on the signing
P1 : the payment price date
P0 : the contract price c1: cost of wage on the contract
A : rate of fixed cost date
B : rate of material cost
b0: cost of material on the signing date
b1: cost of material on the contract date
706021- Chapter 4: Terms of contract 60
ARTICLE 5: PAYMENT
Advance Payment
Prompt Payment
Time Payment
Mixed payment
Required documents:
Bill of Exchange
Commercial Invoice
Packing List
Bill of Lading
Certificate of Origin
Insurance Policy
Certificate of Quality/ Quantity/ Weight
Required documents:
• Commercial invoice in triplicate
• 3/3 clean on board B/L original
• Certificate of weight, quality issued by S.G.S: 1
original, 1 copy
• Certificate of origin issued by the Chamber of
Commerce and industry of Vietnam: 1 Original
• Certificate of fumigation issued by the Fumigation
Company: 1 original, 1 copy
706021- Chapter 4: Terms of contract 64
EXAMPLE
Required documents:
• Full set of clean on board Ocean Bill of Lading
made out of to order of issuing bank, marked
“freight prepaid” and notify the applicant.
• Signed Commercial invoice: 03 originals
• Packing list: 03 originals
• Certificate of Origin form A issued by Vietnam
Chamber of Commerce and Industry (VCCI): 01
original
• Insurance Policy: 02 originals
706021- Chapter 4: Terms of contract 65
ARTICLE 6: SHIPMENT
Latest date: Not later than 12 Jan 2013/ latest shipment date: 12
Jan 2013
• Prompt delivery
• Immediately delivery
• As soon as possible
• First available vessel
• When L/C is opened
706021- Chapter 4: Terms of contract 67
Code 706021
ARTICLE 6: SHIPMENT
Legal requirement
To identify cargo
Simpler marking:
• Lengthy and detailed that the sides of
packages can no longer hold them.
• It has been said that packages
become documents.
• The result is unnecessary costs,
mistakes, confusion and shipment
delays
706021- Chapter 4: Terms of contract 72
ARTICLE 7: Packing and Marking
Simpler marking: 4 main parts
Abbreviations of consignee or buyer to reduce the
risk of pilferage as potential criminals or receivers
cannot easily relate the contents.
Port of destination
Seafreight
Airfreight
78
In contract
Assured ?
Document: Insurance Policy/
Certificate?
Insured Value ?
ICC(A), ICC(B), ICC(C)
War risk? SRCC ?
Government restrictions
In contract
In contract
Claim resolution
Claim for the shortage of quantity
• Offset delivery in a separate shipment
• Consolidate in next shipment
Claim for quality
• Equipment: repair or replace
• Agro product: replace or reduce