Production Dashboard
Request For Quotation
& Key Performance Indicators
Country Vietnam
URS Revision B
Revision History
This document is confidential and proprietary. No information shall be disclosed, copied, or used
for any purpose other than for which it is specifically furnished without the prior written consent
of PepsiCo.
Operation Dashboard – RFQ & KPI's
Contents
Revision History ............................................................................................................................................................ 1
1. Project Information ................................................................................................................................................4
1.1. Correspondence & Invoice Address .............................................................................................................4
1.2. Delivery........................................................................................................................................................4
1.3. Confidentiality .............................................................................................................................................5
1.4. Language ......................................................................................................................................................5
1.5. Standards & Specifications ..........................................................................................................................5
2. Scope of Supply .....................................................................................................................................................5
2.1. Introduction ..................................................................................................................................................5
2.2. Project Overview..........................................................................................................................................5
2.3. Program Management ..................................................................................................................................6
2.4. Works in vendor scope .................................................................................................................................7
2.4.1. Hardware .................................................................................................................................................7
2.4.2. Dashboard ...............................................................................................................................................7
3. System Inputs and Dashboard Requirements ........................................................................................................7
3.1. Production output .........................................................................................................................................7
3.2. Line Efficiency .............................................................................................................................................8
3.3. Material Efficiency.......................................................................................................................................9
3.4. Utility consumption.................................................................................................................................... 10
4. Commercial Details ............................................................................................................................................. 11
4.1. Site Access and Conditions ........................................................................................................................ 11
4.2. Timelines.................................................................................................................................................... 11
4.3. Post Project Support ................................................................................................................................... 11
4.4. Training ...................................................................................................................................................... 12
4.5. Manuals and Documentation ...................................................................................................................... 12
Penalty clause ...................................................................................................................................................... 15
Payment condition ............................................................................................................................................... 15
Insurance.............................................................................................................................................................. 15
4.6. Project Stage Gate Definitions ................................................................................................................... 16
5. Design .................................................................................................................................................................. 17
5.1. Construction Standards .............................................................................................................................. 17
5.2. MES (SCADA) Software ........................................................................................................................... 18
5.3. PLC Software (Version issue) ................................................................................................................. 18
5.4. Maintenance ............................................................................................................................................... 18
5.5. Installation .................................................................................................................................................. 19
5.6. Tagging and Identification ......................................................................................................................... 19
5.7. Systems Interfaces (I/O and Ethernet TCP/IP) ........................................................................................ 19
6. Requirements for Communication to the External Information System – MES .................................................. 19
Operation Dashboard – RFQ & KPI's
1. Project Information
This document covers the complete minimum requirement for Improve Auto-Multipack machines Project.
This document however does not limit the contractor to make changes in the design concept to meet
acceptance criteria of project.
Tel Tel
1.2. Delivery
Delivery should be through a pre agreed delivery schedule to the following address:
1.3. Confidentiality
This project should be considered as confidential and not discussed with a third party unless written
permission is given by the Project Manager of PepsiCo.
A mutual confidentiality & non-disclosure agreement must be signed by PepsiCo and the Supplier and
returned with tender.
Intellectual property & reference site restrictions. The content of this user requirement and existence of the
project are confidential. It is a requirement that all documents and drawings are only made available to
persons and organizations that have a clear requirement to have access for the purpose of tendering or
implementing this project alone and that any participation in the project is not made known to unconnected
third parties.
1.4. Language
All quotations to be in English, documentation and software should be in English.
All site installation works, operation manuals, training documentation and operator interface, HMI Graphics
should be provided in English.
In addition, all equipment and installation procedures must comply with Good Manufacturing Practices
(GMPs) and be compliant with inspection protocols performed by American Institute of Baking (AIB) &
complying with MESS V3.02 Equipment Safety Audit requirements to be conducted by a competent 3rd
party vendor assigned by PepsiCo Thailand.
Any deviations from the above standards must be agreed in writing by both parties in advance prior to order
placement. Deviations from PepsiCo standards following order placement will be at the expense of the
supplier unless otherwise agreed by PepsiCo.
2. Scope of Supply
2.1. Introduction
The purpose of this document is to define the end user requirements for the design, manufacturing,
installation, commissioning, and project management of building an operation dashboard for Binh Duong
plant.
2.4.1. Hardware
Utility measurement equipment:
- Water: install at least 8 flowmeters for key areas which consume most water
2.4.2. Dashboard
The dashboard is designed by vendor to fulfil the requirement of PFVC. It must be available on both
computer and mobile phone. The program should be friendly for PepsiCo employee, both maintenance
and operation team, so that we can modify if having error or need to be updated.
10M
45Gr 10 100 450 4.5
MAX
20M
75Gr 10 40 750 3.0
MAX
The program must be open for user to modify or add new recipe when having new products, SKUs.
Time loss:
Line stoppage should be captured automatically by an appropriate solution proposed by vendor. Definition
of every stoppage will be classified manually by operator on HMI.
The dashboard will have a waterfall chart for all line stoppage, measured by % or hours.
In PC line, we have over 10 products with different flavours. It means that there are over 10 different SSN
codes and over 10 various film codes, while other materials are same.
Theoretical usage of materials is calculated directly by actual production output and bill of material (BOM),
while actual usage is manually input by operator when finish every production batch.
4. Commercial Details
4.2. Timelines
Timelines should reflect all aspects of the project before, during and after installation. Timelines of project
should be as follows.
o Obtain proposal by early 15th Oct 2023
o Finalize and purchased order by 22nd Oct 2023
o Detailed design signing off by 30th Oct 2023
o Equipment Receipt at Site before 30th Nov 2023
o Successful Installation and Commissioning by 15th Dec 2023
Weekend working time and any disruption to production should be confirmed with site. The site may insist
on weekend and night-time working during the installation and commissioning period, and this should be
clearly identified within the costing i.e., cost and timeline for 7 day / 12 hours dayshift working versus 7 days
/ 24 hour working. Any constraints with being able to execute 24-hour working must be highlighted at the
tender stage. Working hours and consecutive working days need to be managed to ensure no employees
are placed at risk – the successful company will be expected to review working hours with PepsiCo at the
bi-weekly review meetings.
4.4. Training
Full operating and maintenance training for the equipment and program should be provided for site
personnel as part of the quotation. Vendor needs to provide formal training calendar specifying need &
timelines of the training so that resources can be released in order to attend the trainings.
o The supplier shall prepare diagrams, layouts and working drawings showing arrangement of plant,
equipment, and steel supports. These together with specifications of major bought out items shall
be submitted to PepsiCo for 'Approval in Principle' prior to commencing manufacture.
o The vendor shall provide detailed connection point for all utilities including electrical and
compressed air intakes and advise quantities & consumptions.
o The contractor must provide all documentation associated with the role of Principal Contractor i.e.
Develop and manage the Health and Safety
o Construction Phase Plan. Following approval to commence works, non-generic / task specific
method statements and risk assessment to be submitted for all phases of site work. Site work shall
not commence until the method statement has been approved by the Principal Contractor.
o Approval by the purchaser of any such document will not relieve the contractor of his responsibilities
for any errors, omissions, or discrepancies therein.
o The contractor shall submit a bar chart program showing key events and dates to the purchaser for
approval within two weeks of order placement. The contractor shall indicate the time required for
submission and checking of drawings, making allowance for the key program dates.
o The contractor shall provide fortnightly progress reports to the purchaser detailing current activities
and items completed, compared with the program.
o Project management to maintain the project time plan and coordinate installation and
commissioning with site personnel and other suppliers / co-vendors, while taking Full responsibility
of the Design, Manufacturing, Installation & Commissioning being done by Other Supplier / System
Integrators / Control Engineers / Co-vendors when engaged by the Principal Contractor or Project
Awardee.
o Overall system layout, design, and architecture
o Specification of all hardware, software, cabling (electrical and network), and mechanical installation
requirements.
o Procurement, delivery and install of all necessary software, hardware, cabling, and equipment
(except where specified).
o Specification, coding, and configuration, testing of all software (except where specified) and
equipment.
o Design, documentation and facilitation of FAT, SAT, and the commissioning “go-live” method and
program. It may not be necessary for multiples of the same equipment to be tested. This should be
agreed in advance with the project team.
Operation Dashboard – RFQ & KPI's
o The SAT testing will consist of thorough performance testing, I/O testing and full in depth testing of
the Emergency Stop/ Safety system which will be fully documented and placed within the technical
file.
o Training and documentation on system build, recovery, and application software structures such
as: OITs, PLCs & Controllers Program Back Ups, their Passwords, Software CDs and Licenses,
etc.
o Electronic copies of documentation to be supplied in a site modifiable format (Word).
o Drawings and documentation should be presented as detailed in PepsiCo Engineering
specifications.
o The supplier should provide Standard operating Procedures (SOPs) covering.
o Equipment start up (steps and sub steps)
o Equipment shut down (steps and sub steps)
o The vendor will supply a recommended spare parts list for all the supplied equipment including
associated costs.
o Documentation and Drawing that shall be provided will be in accordance to The Management of
Works 2012, including but not exclusively:
o Functional Design Specification – must be approved by Region Engineering Team before
development commences.
o FAT document – must be approved by Sector Engineering. Includes methods and schedule.
o SAT document – includes testing all connected devices and communications with the ‘real’
computer systems. Functional testing is a subset of the FAT. References the FDS. Includes
methods and schedule.
o Technical folder which will contain Risk assessments for the machines and integrated line, safety
calculations via SISTEMA or PASCAL, All CE marking details, safety device data sheets and
overall safety category of the machine/line.
o A Tag Import Sheet – detailing the New Tags to be uploaded to the Server and Client apps.
o Hard copies of Bill of Materials
o Operational Instruction Manuals along with detailed “screen shots” for ease of understanding which
will be supplied in hard and soft copies.
o Isometric & Exploded Views of Mechanical Assemblies with their Part Numbers & Part Descriptions.
o Maintenance Instruction Manuals / Spare Parts Listing in PepsiCo standard Criticality format –
inclusive of OEM / Supplier Original part number.
o Planned / Preventative / Predictive Maintenance Schedules - In PepsiCo standard criticality format
and based on FMEA study of installed asset base / Commissioning Data / Set-up Data
o Tag Export sheet – highlighting redundant tags which have been removed.
o A List of additional SQL scripts, triggers, procedures etc...
o Mechanical layout drawings
o Soft copy of the PLC ladder logic fully documented.
o Soft copy of the PLC Topology fully documented.
o 2 Hard copies of Electrical schematics and 2 Soft copies of Electrical Schematics on DWG and
PDF
o A soft copy of variable speed drives settings. (Where applicable)
o P.M. Schedules / Commissioning Data / Set-up Data
o Documentation should have test certificates issued to BS7671 after installation but prior to
commissioning.
o PC Rebuild/ Re-install procedures if applicable.
o Equipment start-up and shutdown (steps and sub-steps).
o Equipment operation (steps and sub-steps) with expected centerline activities ranges and limits.
Operation Dashboard – RFQ & KPI's
o Must include description of equipment controls cause and effect as well as alerts, errors and fault
messages.
o Equipment changeover (steps and sub-steps)
o Equipment troubleshooting (80/20 rule) (steps and sub-steps).
o Set-up and navigation for HMI or PC’s.
o Operator safety, lock-out/tag-out and warnings and hazards (steps and sub-steps).
o Identification of parts for the purpose of ordering spares.
o Equipment diagrams/illustrations/photos/etc. with critical parts, knobs, buttons, switches, E-stops,
etc. called-out/labelled.
o Access control matrix for HMI
o List of Software licenses E.g., RSView, RSlogix 5000, ABB Robot applications (Runtime
/Development)
o Life Cycle management document for all major hardware’s and software’s
o Network Architecture
o Detailed IO Loop testing reports
o Detailed parameter list of Electrical Motors configured with VFD’s
o Installation Qualification & Performance qualification document
o Critical Component Analysis (CCA) report
o Access control matrix for HMI
o List of Software licenses E.g., RSView, RSlogix 5000, ABB Robot applications (Runtime
/Development)
o Life Cycle management document for all major hardware’s and software’s
The vendor shall issue a design package to PepsiCo at tender, design acceptance, delivery and final
acceptance stages as detailed below:
Acceptance
Acceptance
Delivery
Tender
Design
Final
Equipment layout, plan & elevation 2D AutoCad ✓
Equipment model, 3D Single part native format ✓
Full Simulation of the system (logic and flow) ✓
Process Flow Diagram (PFD). Excel ✓
Control Panel Layout. AutoCad ✓
Field Wiring Schematic. AutoCad ✓
Functional Design Specification (FDS). Word ✓
PLC code fully annotated. ✓
Utilities Requirement (peak and running). Excel ✓ ✓
Floor Loadings. AutoCad ✓ ✓
Operator Manual. Adobe .pdf ✓
Maintenance Manual. Adobe .pdf ✓
Recommended Spares List. Excel ✓
Operation Dashboard – RFQ & KPI's
Penalty clause
In case project is delayed by more than one day then suppliers, shall pay to Pepsi-Cola a Penalty at the
rate 0.5% of the Contract Sum per day and up to the maximum of 10% of the Contract Sum. The above
penalty clause has been imposed in order to keep the basic timing, which is absolutely vital for the
completion of this important project. (Details to be discussed)
Payment condition
1) 20% upon purchased order with 60 days credit term.
2) 20% upon details design approval with 60 days credit tern
3) 30% upon FAT with 60 days credit term
4) 20% upon installation complete with 60 days credit term.
5) 10% upon project completion and sign off with 60 days credit term.
Insurance
Without limiting any other obligation or liability of Contractor under the Agreement, Contractor agrees that
upon execution of the and throughout its entire effective period hereof, Contractor will procure and maintain
at all relevant times insurance coverage, at its sole cost and expense, with limits and conditions not less
than those specified below.
(a) Commercial General Liability Insurance: Written on an occurrence form, including but not limited to
premises-operations, property damage to third parties, public liability, legal liability for Contractors, with
limits of at least $1,000,000 per occurrence and $2,000,000 in the aggregate.
(b) Commercial General Liability Insurance: Written on an occurrence form, including but not limited to
products liability for Contractors, with limits of at least $1,000,000 per occurrence and $2,000,000 in the
aggregate.
(c) Worker’s Compensation Insurance: Contractor must comply with the benefits afforded under the laws
of Thailand and shall ensure that at all times during the term of this Agreement has adequate Worker’s
Compensation Insurance as prescribed under the laws of the Kingdom of Thailand.
(d) Property /All Risks Insurance: with full limit covering 100% of Contract value of the property.
Operation Dashboard – RFQ & KPI's
(e) Professional Liability Insurance: with limits no less than $2,000,000 covering Errors & Omissions of
Provider arising from the acts when providing or failing to provide professional services. Coverage may be
written on a claims-made coverage form and shall be maintained for a period of no less than three (3) years
following the completion of work or must contain an extended reporting period provision.
General Requirements:
1. Contractor’s purchase of insurance will not in any way limit Contractor’s liability under this Agreement.
All coverage must be written on an occurrence basis and must be maintained without interruption from the
date of this agreement until the date of termination of this agreement as far as available and subject to
commercially reasonable terms.
2. Should any of the above described policies be cancelled before the expiration date thereof, the issuing
insurer will promptly mail 60 days written notice to the certificate holder, but failure to do so will impose no
obligation or liability of any kind upon the insurer, its agents or representatives.
3. Waiver of subrogation by insurer in favor of PepsiCo only insofar as Contractor shall indemnify and hold
PepsiCo harmless against product liability claims by virtue of legal liability in respect of bodily injury in
connection with Contractor`s business and to the extent to which the injury or damage was caused by
Contractor.
4. The coverage amounts set forth above may be met by a combination of underlying and umbrella policies
so long as in combination the limits equal or exceed those required.
5. The Contractor and any subcontractor will provide Buyer with certificates of insurance evidencing the
insurance required prior to commencing any work.
Prior to the commencement of powered start-up and commissioning of the system, all areas identified in
the ‘Approval to Commission’ document needs to be completed in full and signed by the relevant PepsiCo
representatives. It is the responsibility of both PepsiCo and the Supplier to complete their areas of
responsibility in preparation for sign-off.
Operation Dashboard – RFQ & KPI's
Likewise, all areas of the ‘Approval to Operate’ document need to be completed in full and signed by the
relevant PepsiCo representatives. It is the responsibility of both PepsiCo and the Supplier to complete their
areas of responsibility in preparation for sign-off.
5. Design
The supplier should agree with the site in advance the methods and timelines associated with testing and
ensure enough time is allowed. Control panels shall be machine-mounted unless agreed in advance with
the project team.
Machine Footprint
The equipment shall not exceed layout following guideline in Appendix A.
Electrical cabinets
All electrical cabinets should be accessed via a key specified by PepsiCo (standard keyed entry); PepsiCo
proposes Air-conditioned electrical cabinets with slope on the Top in order to minimize dust accumulation,
vendor need to share GA drawings with PepsiCo before placing final order.
Cable calculations with colour coding should also be submitted at the design stage. All cable entry into the
Electrical cabinets would be sealed tight with proper glanding, all Electrical cabinets must be provided with
dual earthing/grounding mechanism. All Cables carriers/trays has to be sealed end to end.
Cleaning
The conveyor equipment is to be installed in a dry wipe area, outside of the product zone. Cleaning methods
will include vacuuming, wiping with fast drying alcohol wipes.
Equipment should be designed to provide easy access to all areas for cleaning with no specialist equipment
required and minimal labour considering Hygienic Engineering concepts in mind while designing the
complete system.
The design shall consider and wherever possible, minimize or exclude all crevices, cracks, pockets, joints,
ledges and similar which can accumulate dirt and dust, are difficult to clean, and may potentially promote
the growth of bacteria, fungus, or infestation.
5.4. Maintenance
Consideration must be given to adequate space to install, maintain, clean and unblock the system whilst
maintaining system functionality. The supplier should advise at the design stage on any new spares the
site should hold (spares value to be less than 1% of capital purchase value and based on a criticality profile
in line with PepsiCo standard). The site should be advised at the design stage whether any special tools or
lifting gear is required for maintenance.
Standard parts must be identified via clear data cleansed descriptions detailing all relevant technical and
original supplier information.
The supplier is to present an optimized maintenance strategy utilizing techniques which may include
maintenance by cycles, by operational hours, by predictive techniques as opposed to traditional time-based
approaches. Vendor to provide.
- list of complete spares list inclusive of critical spares with their sources, cost etc. along with
maintenance schedule.
- drawings of vendor designed/mfd wear components and PepsiCo can choose either to go to TEAL
or go outside.
- Specs and sources of all proprietary components
- guarantee that components are of latest generation.
Operation Dashboard – RFQ & KPI's
- confirmation from the vendors of critical components for spare/service support throughout the
lifetime of the equipment.
- to provide SLA for spares/service support to PepsiCo. (delivery/response time)
5.5. Installation
The vendor shall provide an installation guide two weeks after the agreed design for installation contractors
and site to follow.
Installation guide must include build methodology, equipment weight, equipment foot locations, lifting
locations, floor loading, electrical service requirements, mechanical services requirements, compressed air
service requirements, and any other essential information to install the equipment.
The supplier must agree in advance and detail the materials access routes & the operational / people route
throughout installation.
Vendor will facilitate unloading of equipment and machinery at factory. Unpacking will be done in presence
of vendor only. Entire risk of unloading and unpacking to be of vendor responsibility.
8. Performance
8.2. Guarantees
Refer to the PepsiCo Management of Works 2012. The Supplier shall guarantee all of the items comprising
the equipment against defective workmanship and/or materials for a period of at least 12 months from the
date of successful completion of the Acceptance Test.
System Waste (Total good bags entering the ‘System’ – Total good bags leaving the 'System') * 100
METHODOLOGY = Total good bags entering the ‘System’
PP multipack waste: This is the percentage of PP multipack that are damaged by the system (torn, wrong
sealing…) or contain wrong number of products inside, which we have to tear the PP and repack product.
This waste figure should be provided by the PLC and be available on the system control panel as Case
Waste as a percentage figure based on the above calculation method.
9.4. Downtime
Downtime MEASURE
The equipment is required to function with no more than 1% downtime due to failures measured over each
3-month period following Site Acceptance Test up to the end of the 12-month warranty period. The supplier
to be responsible for resolving issues associated with this KPI throughout the warranty period.
Downtime METHODOLOGY
Operation Dashboard – RFQ & KPI's
Downtime should be logged as part of the standard shift data collection and calculated as a percentage of
total operational time.
9.5. Quality
Quality MEASURE
The PP multipack must contain exactly number of single bags inside, following the recipe of product. The
system should have function to detect and reject these defected PP multipack.
The PP multipack must not be torn or sealed incompletely, which could lead to dropping out product.
The single bags product inside PP multipack must be ensured quality also, not be damaged by malfunction
of premade machine.
Quality METHODOLOGY
The Product Quality levels on the input to the system shall be determined by sampling the product from the
current PepsiCo bagmaker prior to the new Premade machine.
The Product quality level on the out-feed of the system shall be determined by sampling the PP multipack
contained exact number and good single bags inside. For example, based on table in 3.2 Specification, a
PP multipack 6M has 10 single bags, it must not contain only 9 bags or 11 bags.
The sample size should be an agreed representative sample.
9.8. FAT
Factory Acceptance Testing (FAT): The FAT will take place before the equipment is shipped. Testing will
include, but is not limited to, review of safety compliance (MESS), review of compliance to electrical and
mechanical specifications, review of operator screen / data, review of operator interface, demonstration of
fault recovery from various faults, and demonstration of rates (including maintaining rate during the
changing of a pallet). Individual test runs may last up to an hour to prove capability.
If the equipment is purchased for multiple SKUs, then a minimum of 3 scenarios shall be conducted with
product at either end of the spectrum, together with a more average product. A system shall be able to run
multiple SKUs to test the functionality and rate of the whole module in a real-life scenario.
The supplier should replicate the in-feed on site – i.e., achieve maximum rate at representative spacings.
24hr/day continuous
Between Service Interval
Operating running between
9.3 or 3 months whichever is
Environment recommended service
greater
intervals
10.3. Utilities
The Vendor is to declare all utilities requirements as part of the documentation.
The supplier is to clearly indicate in writing in their tender proposal the energy consumption of the new
equipment, including:
• Electricity consumption in kW/hr
• Compressed air consumption in m3/hr
• Any other energy consumption
equipment, shall not cause any Production Personnel to be exposed to noise in excess of the first action
level (LEAV, d<85dB(A)) of the Control of Noise at Work Regulations 2005. The Contractor shall provide
information and / or calculations to demonstrate that equipment in his supply complies with this requirement.
Noise measurements made by the Contractor shall conform to BS4196, Part 6, 1981, in so far as a
rectangular parallel piped surface is used for the measurement surface.
For machines operating in proximity with other machines and within a reverberant environment (i.e., within
a hygienic factory) consideration shall be given to the effect of reflected noise, and the cumulative effect of
noise from other nearby machines.
Noise attenuation is required if the peak sound pressure level to which an operator is exposed exceeds
85dB (A weighted)