You are on page 1of 8

Elemento 1 Elemento 2

L 4m L 3
P 50 KN P 50

4700(F'c^0,5) E 20636860.226 KN/m^2 F'c 28


(b*h^3)/12 I 0.0005625 m^4 B 0.25
EI 11608.233877 KN*m^2 h 0.3

Paso 2
Elemento 12EI/L^3 6EI/L^2 4EI/L 2EI/L
1 2176.543852 4353.087704 11608.233877 5804.11694
2 5159.2150566 7738.8225849 15477.64517 7738.82258
Ff para cargas distribuidas
Elemento wL/2 wL^2/12 wL/2 (-) wL^2/12
1 100 66.666666667 100 -66.6666667
2 75 37.5 75 -37.5

Paso 3
m1 q1 m2 q2 S
Elemento 1 2176.54385 4353.087704 -2176.543852 4353.087704 m1=0
4353.0877 11608.233877 -4353.087704 5804.1169386 q1=0
-2176.54385 -4353.087704 2176.543852 -4353.087704 m2
4353.0877 5804.1169386 -4353.087704 11608.233877 q2
m2 q2 m3 q3 *
Elemento 2 5159.21506 7738.8225849 -5159.2150566 7738.8225849 m2
7738.82258 15477.64517 -7738.8225849 7738.8225849 q2
-5159.21506 -7738.8225849 5159.2150566 -7738.822585 m3=0
7738.82258 7738.8225849 -7738.8225849 15477.64517 q3

Paso 4 m2 q2 q3
7335.7589086 -4353.087704 7738.8225849 m2
3385.7348809 27085.879047 7738.8225849 * q2
7738.8225849 7738.8225849 15477.64517 q3

Inversa
0.0003034859 0.0001074846 -0.000205485 -50
6.3226238E-06 4.5312137E-05 -2.58174E-05 * 0
-0.0001549043 -7.639837E-05 0.0001802606 0

Paso 6
m1 q1 m2 q2 S
Elemento 1 2176.54385 4353.087704 -2176.543852 4353.087704 0
4353.0877 11608.233877 -4353.087704 5804.1169386 0
-2176.54385 -4353.087704 2176.543852 -4353.087704 -0.015174297042
4353.0877 5804.1169386 -4353.087704 11608.233877 -0.000316131188
m2 q2 m3 q3 *
Elemento 2 5159.21506 7738.8225849 -5159.2150566 7738.8225849 -0.015174297042
7738.82258 15477.64517 -7738.8225849 7738.8225849 -0.000316131188
-5159.21506 -7738.8225849 5159.2150566 -7738.822585 0
7738.82258 7738.8225849 -7738.8225849 15477.64517 0.007745214115

Fuerzas y momentos comprobación


0 KN
F1 31.6513761 KN 0 KN
M1 64.2201835 KN*m debe dar 0
F2 -52.4464832 KN
M2 0 KN*m debe dar 0
F3 20.795107 KN
M3 0 KN*m debe dar 0
4700(F'c^0,5) USA
3900(F'c^0,5) COL
m
KN

Mpa N/mm^2 esfuerzo a compresión del concreto


m
m

Ff
100
66.666666667 m=0 no tiene movimiento en x o y
100
-66.66666667 dX dY M
más fijo no no si
75 movil si no si
37.5 empotrado no no no
75
-37.5

66.666666667
más -29.16666667
-37.5

-0.015174297 f2
igual -0.000316131 m2
0.0077452141 m3

Ff
100 31.651376147 F1
66.666666667 igual 64.220183486 M1
100 -31.65137615 F2
-66.66666667 62.385321101 M2
más
75 -20.79510703 F2
37.5 igual -62.3853211 M2
75 20.795107034 F3
-37.5 0 M3

SUMA DE F DA 0
Elemento 1 Elemento 2
L 7m L 4
W 35 KN/m W 35

4700(F'c^0,5) E 21538105.766 KN/m^2 F'c 21


(b*h^3)/12 I 0.000390625 m^4 B 0.3
EI 8413.322565 KN*m^2 h 0.25

Paso 2
Elemento 12EI/L^3 6EI/L^2 4EI/L 2EI/L
1 294.34364659 1030.2027631 4807.6128943 2403.80645
2 1577.4979809 3154.9959619 8413.322565 4206.66128
Ff para cargas distribuidas
Elemento wL/2 wL^2/12 wL/2 (-) wL^2/12
1 122.5 142.91666667 122.5 -142.916667
2 70 46.666666667 70 -46.6666667

Paso 3
m1 q1 m2 q2 S
Elemento 1 294.343647 1030.2027631 -294.34364659 1030.2027631 m1=0
1030.20276 4807.6128943 -1030.2027631 2403.8064471 q1
-294.343647 -1030.2027631 294.34364659 -1030.202763 m2=0
1030.20276 2403.8064471 -1030.2027631 4807.6128943 q2
m2 q2 m3 q3 *
Elemento 2 1577.49798 3154.9959619 -1577.4979809 3154.9959619 m2=0
3154.99596 8413.322565 -3154.9959619 4206.6612825 q2
-1577.49798 -3154.9959619 1577.4979809 -3154.995962 m3=0
3154.99596 4206.6612825 -3154.9959619 8413.322565 q3

Paso 4 q1 q2 q3
4807.6128943 2403.8064471 0 q1
2403.8064471 13220.935459 4206.6612825 * q2
0 4206.6612825 8413.322565 q3

Inversa (-)
0.000233216 -5.042508E-05 2.521254E-05 -142.9166666667
-5.042508E-05 0.0001008502 -5.04251E-05 * 96.25
2.5212538E-05 -5.042508E-05 0.0001440716 46.66666666667

Paso 6
m1 q1 m2 q2 S
Elemento 1 294.343647 1030.2027631 -294.34364659 1030.2027631 0
1030.20276 4807.6128943 -1030.2027631 2403.8064471 -0.037007277953
-294.343647 -1030.2027631 294.34364659 -1030.202763 0
1030.20276 2403.8064471 -1030.2027631 4807.6128943 0.014560240506
m2 q2 m3 q3 *
Elemento 2 1577.49798 3154.9959619 -1577.4979809 3154.9959619 0
3154.99596 8413.322565 -3154.9959619 4206.6612825 0.014560240506
-1577.49798 -3154.9959619 1577.4979809 -3154.995962 0
3154.99596 4206.6612825 -3154.9959619 8413.322565 -0.001733361965

Fuerzas y momentos comprobación


385 KN
F1 99.375 KN 385 KN
M1 0 KN*m debe dar 0
F2 256.09375 KN
M2 0 KN*m debe dar 0
F3 29.53125 KN
M3 0 KN*m debe dar 0
4700(F'c^0,5) USA
3900(F'c^0,5) COL
m
KN/m

Mpa N/mm^2 esfuerzo a compresión del concreto


m
m

Ff
122.5
142.91666667 m=0 no tiene movimiento en x o y
122.5
-142.9166667 dX dY M
más fijo no no si
70 movil si no si
46.666666667 empotrado no no no
70
-46.66666667

142.91666667
más -96.25
-46.66666667

-0.037007278 m1
igual 0.0145602405 m2
-0.001733362 m3

Ff
122.5 -23.125 99.375 F1
142.91666667 igual -142.9166667 resultado 0 M1
122.5 23.125 145.625 F2
-142.9166667 -18.95833333 -161.875 M2
más
70 40.46875 110.46875 F2
46.666666667 igual 115.20833333 resultado 161.875 M2
70 -40.46875 29.53125 F3
-46.66666667 46.666666667 0 M3

You might also like