Professional Documents
Culture Documents
Money
Jaringan
Applikasi
Jaringan
Data
Informasi
Sarana Transportasi Kapal Laut, Kereta Api, Kapal Udara, Truck, Pipa
Transportasi
Freight
Jaringan
Jaringan
ing
Jaringan
Trade
an Penyalur Pedagang, Distributor, Grosir, Agen, Peritel
Dis Prasarana
trib
Pusat Distribusi, Pasar Induk, Pasar Tradisional, Kios, Warung,
usi Hyper/Super/Mini Market
Transportation Consideration
Infrastructure Assets
6. Loading on board
Shipper Consignee
Forwarder
Sea transport Forwarder
Trucker Trucker
Warehouser
7. Discharging from sea -going vessel Warehouser
Customs Customs
9. Storage at stevedore’s premises Stevedore
Stevedore
Port, Carrier, Port r
12. Transport to buye
Transportasi Logistik
➢ Node Perpindahan Moda: Perpindahan Kepemilikan:
• Lokasi: Terminal, • Lokasi: Pasar, eMarket
Stasiun, Pelabuhan, • Pelaku: Produsen, Exportir,
Bandara, dll Importir, Wholesale, Grosir,
• Pelaku: Operator Distributor, Pengecer,
Transportasi Supplier, Konsumen dll
Infrastruktur Pergerakan InfrastrukturPerpindahan
➢ Link • Prasarana: Jalan, Rel • Prasarana: Transportasi,
KA, Sungai, Laut, Udara, TIK, Keuangan
Pipa • Sarana: Gudang, Truk, KA,
• Sarana: Truk, KA, Kapal, Kapal, Pesawat.
Pesawat, dll • Pelaku: Penyedia Jasa
• Pelaku: Penyedia Jasa Logistik, Penyedia Fasilitas
Transportasi Logistik
Government
Internet.com
Air
Express Warehousing
Retailer
Retailer
Inter-change
Rail Point Processor
Retailer
Motor Pooling
Manager Carriers Yards Retailer
Retailer .Operation
.Order
processing End
Ocean Others
Consumer
Private .Tracking
Fleets .Billing
• Water
• Rail
• Air
• Pipeline
Rail 3 2 3 2
Truck 2 1 2 3
Water 4 4 4 1
Pipe 5 5 1 5
Air 1 3 5 4
*) 1=Highest
Rail 3 3 4 5
Truck 2 2 3 4
Water 5 5 5 2
Pipe 4 4 2 1
Air 1 1 1 3
Piggyback/TOFC/COFC
Containerships
Coordinated Air Truck
Paradigma Baru
Secara ideal berupa “point to pint” terpadu melalui sistem multimoda
Inward
On Carriage Clearance Main Carriage
Consignee
MTO
One liability from point to point
Shipper One Document Consignee
One Invoice and Freight Charges
Guaranted Transit Time
lorry rail
terminals &
air-company rail
warehousing
Client
(Shipper)
MT-Contact
VO - MTO
Shipper
Trade control
Insurance /issuing permit
MT Gov’t Agency
Operator
Banks Customs
Port
Consignee Consignee Authority
Plant Warehouse
Inventory: 100.000 100.000 unit
Price at Plant : $30/unit
Carrying Cost : 30% of price/unit/year
Transport Rate/R Transit Time/T Number of
Mode ($/unit) (days) shipment/year
Rail 0.10 21 10
Piggyback 0.15 14 20
Truck 0.20 5 20
Air 1.40 2 40
It is estimated that for every day that transit time can be
reduced from the current 21 days, average inventory levels can
be reduced by 1%, which mode to be selected if demand (D) was
700.000 unit/year ? 1. TI 4102 SCM - Transportation
Criteria
Total cost = Inventory Cost + Transportation Cost
» Plant
» In-Transit
» Warehouse
• Transportation Cost (C.Trans) =RxD
• In-Transit Inventory Cost (C.In-Trans)= ICDT/365
• Plant Inventory Cost (C.Plant) = ICQP/2
• Warehouse Inventory Cost (C.Ware) = IC’QW/2
• QP = 700.000/N IC = 0.3 x 30
• QW = 700.000/N IC’ = 0.3 x (30 +R)
Plant Warehouse
Inventory: 100.000 50.000 unit
Price at Plant : $20/unit
Carrying Cost : 30% of price/unit/year
Transport Rate/R Transit Time/T Number of
Mode ($/unit) (days) shipment/year
Rail 0.10 25 10
Piggyback 0.15 15 20
Truck 0.25 8 20
Air 2.00 2 40
It is estimated that for every day that transit time can be
reduced from the current 25 days, average inventory levels can
be reduced by 1%, which mode to be selected if demand (D) was
500.000/year ? 1. TI 4102 SCM - Transportation
Terima Kasih
Wassalam.Wr.Wb