You are on page 1of 1
165 Bukit Merah Central 408-3661 Singapore 150165 KAIA 1: 66564056100 #65 46256101 ARCHITECTS €:admin@kelaarchiects. com Interim Certificate No: 0 Project / Contract: rr Reconstruction of the Existing 2 Sto Date of Proposed Reconstruction of the Existing 2 Storey Intermediate. im: Terrace house to a? Storey envelope control intermediate Progress Cloim: _6-Nov-23_ Terrace with a Mezzani tic on lot 00328 WMKIBGINS — te of ‘Casvaring Road Singapore $79503 (Ang Mo Kio Planning Area) Certificate! Pt Contract Sum: 397,000.00 Contractor: Trades! Pursuant fo Clause 31.(3) of the Conditions of Building Contract, | hereby certify that the total vaive of all works and unfixed goods and materials claimed by the Contractor to have been carried out and delivered to the Site, respectively, under the Contarct is as follows: Works carried out by the Contractor {less retention at 0%) $ 258,560.00 ‘Add: Variation Order #01 s 4000000 - Consiruction of new slab at 2nd storey Total $ 298,560.00 Less: Sum previously certified PC#01 $ 217,900.00 Less: Additional Payment $ 52,100.00 Amount Due $ 28,560.00 CCERTIFIEMBY DISTRIBUTION: BW Emptoyer © avantity surveyor CO Enaincer ize) © Engineer (cas) Crave * See Schedule Attached

You might also like