You are on page 1of 14

Y

A 4.0000
B C 45.0000

33.0000
D E 4.0000
F
5
D3 D3

10.0000

FIRE EXIT D1 BACKSTAGE BACKSTAGE D1


FIRE EXIT

W2
W2
TECHNICAL 1.5000 STAGE

2.0000

ROOM ROOM W2 12.0000


W2

4
X W2
D1 D1
W2 X
D1 D1

W2
CONVENTION HALL KITCHEN
W2
27.5000
STORAGE ROOM 9.0000

3 D1
36.0000

D1

W2
W2

D3

CONTROL ROOM KITCHEN 3.0000


STORAGE
D3

W2 W2

COMFORT ROOM
COMFORT ROOM

2 D3
6.0000

2.4000
D3

D2 D2
2.5000
FRONT DESK

W3

LOBBY
LOBBY
W3
W5 W5 3.0000

1 W3
W1 W4
D1

MAIN ENTRANCE
D1
W4 W1
W3
5.0000

Y
Y
A 4.0000
B C 45.0000

33.0000
D E 4.0000
F
5
D3 D3

10.0000

FIRE EXIT D1 BACKSTAGE BACKSTAGE D1


FIRE EXIT

W2
W2
TECHNICAL 1.5000 STAGE

2.0000

ROOM ROOM W2 12.0000


W2

4
X W2
D1 D1
W2 X
D1 D1

W2
CONVENTION HALL KITCHEN
W2
27.5000
STORAGE ROOM 9.0000

3 D1
36.0000

D1

W2
W2

D3

CONTROL ROOM KITCHEN 3.0000


W4 STORAGE
D3

W2 W2

COMFORT ROOM
COMFORT ROOM

2 D3
6.0000

2.4000
D3

D2 D2
2.5000

W3

LOBBY
LOBBY
W3
3.0000

1 W3
W1 W1
W3
5.0000

Y
Y
A 4.0000
B C 45.0000

33.0000
D E 4.0000
F
5
D3 D3

10.0000

FIRE EXIT D1 BACKSTAGE BACKSTAGE D1


FIRE EXIT

W2
W2
TECHNICAL 1.5000 STAGE

2.0000

ROOM ROOM W2 12.0000


W2

4
X W2
D1 D1
W2 X
D1 D1

W2
CONVENTION HALL KITCHEN
W2
27.5000
STORAGE ROOM 9.0000

3 D1
36.0000

D1

W2
W2

D3

CONTROL ROOM KITCHEN


W4 STORAGE
3.0000

D3

W2 W2

COMFORT ROOM
COMFORT ROOM

2 D3
6.0000

2.4000
D3

D2 D2
2.5000

W3

LOBBY
LOBBY
W3
3.0000

1 W3
W1 W1 W3
5.0000

Y
A B C D E F
45.0000

9.0000 9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000TOP OF
ROOF BEAM

5.2000

W1 W1 W1

3rd FFL

17.8000
5.4000

W3 W3
W1
W1 W1

2nd FFL

W5 W5
5.4000

W1
W1

FINISH
FLOOR LINE
0.4000 N.G.L

D1 D1
F E D C B A
45.0000

9.0000 9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000 TOP OF
ROOF BEAM

D3
D3
5.2000

3rd FFL

17.8000 D3 D3
5.4000

2nd FFL

D3
5.4000 D3

FINISH
FLOOR LINE
0.4000 N.G.L
36.0000

5 4 3 2 1

9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000 TOP OF
ROOF BEAM

W2 W2 W2 W2 W2 W2

5.2000

3rd FFL

W2 W2 W2 W2 W2 W2

17.8000
5.4000

W3

2nd FFL

W2 W2 W2 W2 W2 W2

5.4000

FINISH
FLOOR LINE
0.4000 N.G.L
36.0000

1 2 3 4 5

9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000 TOP OF
ROOF BEAM

W2 W2 W2 W2 W2 W2

5.2000

3rd FFL

W2 W2 W2 W2 W2 W2

17.8000
5.4000
W3

2nd FFL

W2 W2 W2 W2 W2 W2

5.4000

FINISH
FLOOR LINE
0.4000 N.G.L
A B C D E F
45.0000

9.0000 9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000TOP OF
ROOF BEAM

D3 D3
5.2000

3rd FFL

17.8000
D3 D3
5.4000

2nd FFL

D3 D3
5.4000

FINISH
FLOOR LINE
0.4000 N.G.L
36.0000

5 4 3 2 1

9.0000 9.0000 9.0000 9.0000

TOP OF
PARAPET

1.2000TOP OF
ROOF BEAM

5.2000

D1
D1

3rd FFL

17.8000
5.4000

D1 D1

2nd FFL

5.4000

D1 D1

FINISH
FLOOR LINE
0.4000 N.G.L
60.0000

N
PROPOSED THREE
STOREY
CONVENTION
CENTER

55.0000

DIVERSION ROAD
N

THIS
SITE
2.0000 2.2000
1.0000

3.0500 2.0000
2.0000
5.6500

1.7000

8.1000

2.7500
15.3000

1.5000

4.0000 2.0000
2.7000

1.0500