AE INSPECTION REQUEST
‘CONTRACTO! (CONSULTANT: PROJECT:
ALTURKLENTERPRISES LLC NIPENGINEERING CONSTRUCTION OF BARQ PROJECT
‘CONSULTANCY [AT RAFO AIRBASE THUMRAIT
To: M/S NIP ENGINEERING CONSULTANCY Request No: ATE-499-TH-GR-EL-12 Revd
From: ALTURKI ENTERPRISES LLC Discipline : ELECTRICAL
‘Name: SHREELANJ HK ReportNo +
EER Date of request
17-09-2018
Drwg/Spee Ref: ATE/499-TH-GRB-F-300
‘You are here by requested to inspect our work as listed below on 17/09/2018 at 3.00 pm
onwards,
Work tobe inspected:
1) Insallation of Light Fixtures as attached highlighted drawing herewith
W/
pt = rere ger
conse
CO sront CA puntnitmnces —) int |) et
Ye BEL Me able unre ho Conta felt Cfomunnimn pu) folate
Bay do be Bb
XL GBP Depre| Ob bh Leo
Ay
Mechanical Engincer| Electrical Engineer ‘Structural Engineer _ QAIQC Engineerul
oyung) [euent: ministay oF DEFENCE
INSPECTION CHECKLIST
PROJECT: MOD/2013/034-1 BARQ PROJECT AT RAFO AIRBASES THUMRAIT
[CONSULTANT: NIP.
[CONTRACTOR : AL TURK!
SNe DESCRIPTION
WO [N7A] _ REMARKS
1 [Material used a site ae as per approved MAS
2. [Work carried outa per approve shop drawings
3 |Work done as pe approved Method Statement
SINS a
44 [Diemension as per approved shop drawings
5 fteveland alignment were checked propery
66 [vats catoarton certificate availabe for used Equipment /Toot
<{s
7. [sequence of works ensured
2 [survey Report atached # necessary to work
Giec Tor dopant of debris and proper Rousekeeping afer work
9 |complewon.
[om on eusroted FS Cpprame cher Comune
oh 2 lax Brdenly @ vale footy
Sats a6h
— xsineeuwn rad
Project Manager | sewre KuMaR