You are on page 1of 3
AE INSPECTION REQUEST ‘CONTRACTO! (CONSULTANT: PROJECT: ALTURKLENTERPRISES LLC NIPENGINEERING CONSTRUCTION OF BARQ PROJECT ‘CONSULTANCY [AT RAFO AIRBASE THUMRAIT To: M/S NIP ENGINEERING CONSULTANCY Request No: ATE-499-TH-GR-EL-12 Revd From: ALTURKI ENTERPRISES LLC Discipline : ELECTRICAL ‘Name: SHREELANJ HK ReportNo + EER Date of request 17-09-2018 Drwg/Spee Ref: ATE/499-TH-GRB-F-300 ‘You are here by requested to inspect our work as listed below on 17/09/2018 at 3.00 pm onwards, Work tobe inspected: 1) Insallation of Light Fixtures as attached highlighted drawing herewith W/ pt = rere ger conse CO sront CA puntnitmnces —) int |) et Ye BEL Me able unre ho Conta felt Cfomunnimn pu) folate Bay do be Bb XL GBP Depre| Ob bh Leo Ay Mechanical Engincer| Electrical Engineer ‘Structural Engineer _ QAIQC Engineer ul oyung) [euent: ministay oF DEFENCE INSPECTION CHECKLIST PROJECT: MOD/2013/034-1 BARQ PROJECT AT RAFO AIRBASES THUMRAIT [CONSULTANT: NIP. [CONTRACTOR : AL TURK! SNe DESCRIPTION WO [N7A] _ REMARKS 1 [Material used a site ae as per approved MAS 2. [Work carried outa per approve shop drawings 3 |Work done as pe approved Method Statement SINS a 44 [Diemension as per approved shop drawings 5 fteveland alignment were checked propery 66 [vats catoarton certificate availabe for used Equipment /Toot <{s 7. [sequence of works ensured 2 [survey Report atached # necessary to work Giec Tor dopant of debris and proper Rousekeeping afer work 9 |complewon. [om on eusroted FS Cpprame cher Comune oh 2 lax Brdenly @ vale footy Sats a6h — xsineeuwn rad Project Manager | sewre KuMaR

You might also like