2. On a Purchase Order with more than one line item, the different items can have prices
(Gross price condition) that are on DIFFERENT currencies?
3. Public holidays are specified in the Factory calendar that are link to a specific Purchase
Organization?
5. The Quantity & Value update in the material type configuration can be set per Plant?
6. Number ranges for Vendor Masters (set at Account Group) must be either Internal or
External - it can not be both?
7. Screen Sequence (which identifies the screen sequence for the display of the header details
in the evaluation of the planning run) is set on lot size?
9. The validity period (start / end) can be entered in a Purchase Order and Purchase Requisition
on header level?
10. Transaction “Create PO, Vendor unknown” can be used to create Purchase Orders and
Purchase Requisitions?
11. With availability check, the current unrestricted stock can not be excluded from the
calculation?
12. Regular Vendor (used in Info Records) is activated per Purchase Organization?
13. The Freezing of Book inventory - as used in Physical Inventory is only allowed if activated on
Plant / S.Loc level?
https://sap123.com/a/2 1/7
9/14/23, 11:47 PM MM Sample Q&A - 1 | SAP123.com
14. If the posting Block was set for Physical Inventory document, you will not be able to process
material movements until the difference is posted?
15. For invoice verification, a default tax code can be set up per company code?
17. One step Transfer postings can done between plants if the plants belong to different
company codes?
18. In external service management a service entry sheet is the same as a goods receipt?
19. If the Source List selection is set in the material master then you must maintain a source list
for the material?
20. If the Quota Arrangement option is set in a material master then you must maintain a quota
arrangement for the material?
22. For a Framework requisition (type FO) the validity dates are entered on header level?
25. Exchange rates can be changed during invoice verification (ref to PO) but it must be done
before the PO number is typed in?
26. Manual postings to stock (GL) accounts can only be made if the current stock quantity is
zero?
28. Goods receipt to ‘GR block stock’ - for valuated material will create a material document?
29. Only one plant / storage location can be used in one Physical Inventory document?
30. Consignment info records can only be created in the currency of the company?
31. The same material (for a specific plant) can be set up for either batch management or split
valuation - not both?
32. For MRP to create stock transport requisitions (PR with item category U) a source list must
be set up?
33. When creating a Purchase Requisition for a material the price in the PR is from the material
master?
35. Planned delivery costs is specified in pricing conditions and can not be changed during
invoicing?
39. Stock can only go negative if the material is valued as standard price, not moving average
price?
40. Reservations that are flagged for deletion can be un-deleted by simply removing the flag?
41. Purchase requisitions that are flagged for deletion can be un-deleted by simply removing
the flag?
43. If the ‘Shelf live expiration date’ (SLED) is set in the material master but not in the Purchase
Order then it will not be checked during Goods Receipt?
44. End User training takes place during the ‘Go-Live and Support’ phase of a project?
45. SAP Solution Manager provides the methodology through 3 roadmaps - Implementation,
Solution Management & Global?
47. A ‘Hold document’ (invoice) is only visible in PO History if the balance is zero?
48. Automatic Invoice reduction can take place if the vendor specific tolerance is set up. Invoice
reduction can only take place for positive differences and not for negative diverences?<
50. Unplanned delivery costs will always post either to stock or consumption account?
52. Account assignment U can be used in PR and contract but not in Purchase Orders?
53. The same Valuation Grouping code can be linked to multiple plants belonging to different
company codes?
https://sap123.com/a/2 3/7
9/14/23, 11:47 PM MM Sample Q&A - 1 | SAP123.com
56. For missing parts check to function, the availability checking must be activated for a
material?
59. In the material type configuration a setting is available to indicate if the material can be
managed as consignment stock?
#### Answers
2. TRUE - Although the overall PO is only in one currency (specified on header) individual items
can have prices in different currencies.
5. TRUE
8. TRUE
9. FALSE - only in a PO
10. TRUE
11. TRUE — only other stock types can be included/excluded, such as Block stock, QI stock,
safety stock.
13. TRUE
15. TRUE
18. TRUE - service entry sheet + acceptance is the same as goods receipt (movement type 101)
https://sap123.com/a/2 4/7
9/14/23, 11:47 PM MM Sample Q&A - 1 | SAP123.com
19. TRUE
20. FALSE - for quota arrangements the tick on material master only activates the functionality
but the use is optional
22. FALSE - there is a FO type for purchase requisitions but no place to enter validity period. It is
normally entered as free text in one of the long text fields
25. TRUE
27. TRUE
30. FALSE
31. TRUE
33. TRUE
35. FALSE - it is conditions but it can be changed during invoicing (if variances are allowed)
36. TRUE - to indicate what fields in the document is display / mandatory / etc..
38. TRUE - all the normal stock types are valid for consignment stock (QI, unrestricted , QI)
41. TRUE
https://sap123.com/a/2 5/7
9/14/23, 11:47 PM MM Sample Q&A - 1 | SAP123.com
44. FALSE - according to ASAP it takes place in the “Final Preparation” phase
45. TRUE
46. TRUE
48. TRUE
49. FALSE – If the quantity of the subsequent debit/credit is larger than the quantity delivered,
the system distributes the relevant amount proportionally. The part of the subsequent
debit/credit that does not have a goods receipt is posted to the GR/IR clearing account. The
remaining amount is posted to the stock account or in the case of standard price control or
insufficient stock coverage to a price difference account.
52. FALSE – it can be used in some PO example: blanket PO, services (item cat D)
53. TRUE
54. TRUE
59. FALSE –
email address
Subscribe
https://sap123.com/a/2 6/7
9/14/23, 11:47 PM MM Sample Q&A - 1 | SAP123.com
SAP is a registered trademark of SAP AG - This website is not affiliated with, sponsored by, or
approved by SAP AG
https://sap123.com/a/2 7/7