SUPPLEMENTARY METHOD STATEMENT FOR CONSTRUCTION

OF CROSS PASSAGE IN TUNNEL (CP1 TO 5)

Table of Contents

1.0 SCOPE OF WORK


1.1. General Description
1.2. Reference
1.3. Materials
1.4. Plant and Equipment
1.5. Manpower
1.6. Construction Procedures

2.0 SAFETY AND HEAL TH


2.1 Job Safety & Health Analysis
2.2 Information to Personnel
2.3 Emergency Arrangements
2.4 Permit Requirement

3.0 ENVIRONMENTAL ISSUES


3.1 Environmental Aspects, Impacts & Control Measures
3.2 Air Quality & Noise Level Control
3.3 Domestic Waste Management
3.4 Scheduled Waste Management

4.0 QUALITY ASSURANCE & QUALITY CONTROL


4.1 Inspection and Testing
4.2 Follow Up & Evaluation

5.0 APPENDICES
Appendix A -Job Safety and Health Analysis
Appendix B -Environmental Operation Control Log
Appendix C - Quality Control Inspection Checklist
Appendix D - Construction drawings
Appendix E -Waterproofing applicator authorisation letter
Appendix F -Blasting safety procedures
Appendix G - Nozzleman's certificates