INFORMATION SHEET
1
Crane requirements
If a crane is to lift a work box the crane should:
have levers and foot pedals fitted with a workers remain substantially inside the work
constant pressure system so crane motion box while it is lifted or suspended, and
stops immediately after the operator
emergency retrieval arrangements are put
removes pressure from the controls.
in place before the lift so workers can safely
If the crane is fitted with a free fall facility, this exit the work box in the event of crane
function should be positively locked out to failure.
prevent inadvertent activation when lifting a
work box. Further information
Where a crane has a brake acting directly on The following technical standards provide
the drum, the braking efficiency of the hoisting further information on work boxes and
drive train should be tested by hoisting and cranes:
holding a load:
AS 1418.17-1996: Cranes (including hoists and
equivalent to the line pull of the hoist winch, winches) Part 17: Design and construction of
or workboxes, and
not less than twice the maximum hoisted AS 2550.1-2011: Cranes, hoists and winches—
load. Safe use Part 1: General requirements.
If the crane will be used to lift other loads the For further information see the Safe Work
test should be repeated before re-lifting the Australia website www.swa.gov.au.
work box.
DECEMBER 2015