Professional Documents
Culture Documents
Colomnar Bollards
PLANT
NORTH
2 1
Colomnar Bollards
Colomnar Bollards
3 4
LEGENDS
MAD CORRIDOR MAKE UP AIR DUCT (2-HR FIRE RATED)
DIRTY CORRIDOR
01 043 01 044 01 115 01 120
01 106
BLOOD BANK MICROBIOLOGY DIGITAL PATHOLOGY
EAL EXTRACT AIR LOUVER
CLEAN
STORE 01 114 ROOM IMAGING
CLEAN GENERAL 01 109 ROOM
STORE
DIGITAL
GENERAL GENERAL
OPERATING OPERATING
CARDIAC 01 076 01 108
HISTO STL SAND TRAP LOUVER
CORRIDOR BED/ OPERATING OPERATING 01 117
TOILET PANTRY 01 425A OPERATING ROOM #-3 ROOM #-4 ROOM #-5
01 018 CRIB STORE ROOM #-2 EMBEDDING
01 015 01 020 ROOM #-1
MICRO
01 118
01 119
SEF CORRIDOR SMOKE EXTRACT FAN
01 022 ST 002 01 075 ST 003
01 089 01 094 01 080 OFFICE
01 082
PICU
STRETCHER PARK 01 113 01 116 MAF CORRIDOR MAKE UP AIR FAN
01 021 BED
02 06
Laboratory
ROOM
EMBEDDING
EVCH
01 068 01 093 01 070 01 078
01 112 01 121 F/B FROM BELOW
CLEAN LINEN FHR/FHC-# 25
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
EMERGENCY 01 428
01 023 01 132 01 132A
EMERGENCY
SHOWER
PICU
01 024
SLIDING DOOR SLIDING DOOR SLIDING DOOR SLIDING DOOR
SLIDING DOOR SHOWER
OFFICE
EYE WASH
STORE
01 111
T/A TO ABOVE
MOBILE DIRTY CORRIDOR OFFICE 01 123
03 X-RAY 01 124
BED CONTROLLED
T/B TO BELOW
SCOPE OF WORK
01 012 05 S E M I R E S T R I C T E D C O R R I D O R 01 083 SEMI RESTRICTEDCORRIDOR EMERGENCY EXIT 01 125
DOOR
CORRIDOR STORE
TOILET MECHANICAL
DIRTY CORRIDOR
01 041 STORE
01 013 CPR SLIDING DOOR
SLIDING DOOR
CRASH
SLIDING DOOR COLD ROOM 01 127 01 122 CONTROL ROOM ROOM L/L LOW LEVEL
01 025 CART 01 133 01 134
ELECTRICAL PARKING 01 173 01 174
BED
PANEL
CABINET PANEL
leaded
01 056 SCRUB-UP
09 glass
TOILET MED
01 011
PICU
HEAD NURSE
OFFICE Recovery 01 048
01 058
GAS
STERILE
ORTHO
OPERATING
01 073
01 130
GENERAL NOTES:
04
P.I.C.U.
01 026
01 027
BED
04
PATIENT
RECOVERY
Room EQUIPMENT
SUPPLY STORE
ROOM #-6
AREA=47.32 sq. m CHEMISTRY
01 126 01 175 TOILET 01. ALL DIMENSIONS ARE IN MM.UNLESS OTHERWISE NOTED
Room
01 040 AREA 01 069 01 072 01 104
01 010 STORE TIOLET
CLEAN
STORE DIGITAL
01 427 01 176 02. ALL DIMENSIONS TO BE VERIFIED BY THE CONTRACTOR AND
GENERAL
BED 01 084 OPERATING OPERATING ELEC. PANEL
ORTHO
STORE
FREEZERS DISCREPANCIES, IF ANY, REPORTED TO THE ENGINEER BEFORE
10 ROOM #-8 01 092 01 099 STORE AUTOCLAVE
ROOM #-7
01 079 01 131 01 138
CORRIDOR COMMENCING ANY WORK ON SITE.
01 047 SLIDING DOOR 01 129
01 169
01 426 01 071 01 085
CLEANING &
03. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH RELEVANT
BED ENDOSCOPY ENDOSCOPY CATHETERIZATION LAB.
ELEC. PANEL 03
01 035
01 061 DISINFECTION ARCHITECTURAL, STRUCTURAL AND SERVICES DRAWINGS;
1 ROOM 2 01 170
PICU 01 039 MEDICATION
SPECIFICATIONS AND DETAILS.
DU ROOM
01 165 01 166 01 167
05 01 028 Solid CLEAN BED BED BED BED BED NOTES:
01 008 Linen UTILITY RECOVERY & 05 04 03 02 01
01 028A OBSEVATION 01 067 LABORATORY
TOILET 01 029 STATION 01 055 01 054 01 053 01 057 ACCESS
CONTROLLED CHANGING CHANGING HEAD 1. FIRE RATED DUCTS WITH FITTINGS SHALL BE 2 HR FIRE RATED IN
ROOM ROOM
01 009
01 046
PATIENT
DOOR
O.R. C O R R I D O R
UTILITY SECRETARY
COMPLIANCE WITH CIVIL DEFENSE. ALL FACTORY MANUFACTURED/
Endoscopy &
PREPARATION BED CORRIDOR
TOILET SHO. 01 164
CORRIDOR
11 CHANGING CHANGING SHO. O.R. 01 074 01 139 TOILET
01 030 AREA AREA 01 135 CORRIDOR SCRUB UP PROCESSING DEPT. SUPPLY TESTED BEFORE DELIVERY TO SITE.
01 007 PICU
FHR/FHC-# 31
MANAGER 01 161
01 049 STORE
OFFICE ROOM
06 NURSE STATION SHO. SHO.
NURSE
01 172 (CATHLAB) 3. SMOKE CURTAINS SHALL BE 600°C, 2 HR FIRE RATED IN COMPLIANCE
01 065 01 159
CH.
FEMALE
01 404
01 418
MAINTENANCE
WORKSHOP
Elec. Shaft
L13
BED LIFT
L14
BED LIFT
L01 L02 L03
VISITORS LIFT VISITORS LIFT VISITORS LIFT Badana Clinic
01 263
01 264
ST 005
VISITORS LIFT VISITORS LIFT VISITORS LIFT
L04 L05 L06
01 143
01 144
RECOVERY
2
01 151
HOLDING
1
01 152
HOLDING
2
01 153
EVCH
IT Shaft
01 406 Elec. Shaft IT Shaft TOILET CH. 01 149
TOILET
HOUSE KEEPING CH. I.D.F. ROOM MALE
ST 001
01 034 CORRIDOR CORRIDOR TOILET 01 257
01 272 TOILET CLINIC 01 01 178
01 402 01 407 CHANGING
MALE FEMALE BADANA DOCTOR
CHANGING ROOM EQUIPMENT DOCTOR OFFICE ROOM
TOILET FEMALE OFFICE CORRIDOR
RECEPTION
FHR/FHC-# 28
MALE STORE GAS CYLINDER TOILET 01 271 01 270 01 262 ELEV. LOBBY
MED. 01 408 VITAL SIGN 01 258 01 148 01 147 ST 004
PREPARATION TOILET 01 403 01 405 MALE ROOM 01 260 01 177 01 145
ROOM 01 414
01 261 CH.
HOUSE 01 400 STORE TOILET
SOILED 01 259 TOILET
UTILITY KEEPING 01 413 01 409 FEMALE
FEMALE
01 397 01 398 01 401 HEAD NURSE HOUSE DEPT.
CPR SUPPLY STORE
CLEAN OFFICE (CCU) PUBLIC GALLERY 01 179 KEEPING 01 187
UTILITY WAITING MALE
EVCH
CCU
01 335
01 333
01 280 TOILET
01 281
CLINIC 08
DIABETIC
01 247
Diabetic Center TOILET
MALE
01 252
TOILET
FEMALE
01 253
01 237
PRAYER ROOM
MALE
RECEPTION
PLASTIC SURGERY
01 195
01 23.06.2023 ISSUED FOR APPROVAL NE AY ZS
TOILET
03
01 386 Cardiac Care NURSE STATION SOILED UTILITY WAIT
01 216
Skin Care
01 291 00
REV
12.06.2023
DATE
ISSUED FOR APPROVAL
DESCRIPTION
SA
DRAWN
AY
CHKD.
ZS
APPD.
01 I.C.U. ROOM 01 254 01 255 CLINIC 02
01 387
Unit CCU 11
01 384
TOILET
TOILET
01 340
I.C.U. ROOM
02
01 339
01 332
24
01 282
TOILET
LIGHT WELL/SKYLIGHT CLINIC 07
DIABETIC
01 246
DIABETIC EDUCATOR
01 238
TOILET
MALE
Ch.
01 199
CLINIC 3
01 196
PROJECT TITLE
01 385 01 214
TOILET
CCU
light well/ skylight 01 330 CPR 01 283 CLEAN UTILITY
01 256 light well/ skylight
CHANGING ROOM
FE MALE CORRIDOR MOUWASAT HOSPITAL
01 381 MED. 01 200
04
01 380
TOILET
01 383
TOILET
01 342 I.C.U. ROOM
01 331
CLEAN UTILITY
01 329
TOILET
01 285 CLINIC 06
ELEC. PANEL
CLINIC 03 WAITING AREA
TOILET
FEMALE
CHANGING ROOM
MALE
01 198
CLINIC 4 KHOBAR - KSA
03 I.C.U. ROOM OBYNE OBSTETRICIAN ENDOCRINOLOGIST Ch. PLASTIC SURGERY
CCU 10 FEMALE
01 382 01 341 23 01 245 01 239 01 213
01 197 CLIENT:
01 241 CORRIDOR 01 217
SOILED
01 328 CLEAN UTILITY UTILITY
CCU
ALCOVE
01 372
ALCOVE
I.C.U CLINIC 05 01 242
01 215 01 210
PATIENT PREPARATION
P.O.BOX 282, DAMMAM 31411 - SAUDI ARABIA
I.C.U MANAGER
TEL. 8200000, FAX. 8222444 - WEB SITE: www.mouwasat.com
05 01 343' ANTE DIABETES DIABETIC CLINIC 04 CORRIDOR
ISOLATION ROOM ROOM ISOLATION ROOM OFFICE 1
ISOLATION ROOM FOOT CLINIC OPTHALMOLOGY
TOILET 01 378 ANTE CCU 04 ANTE 01 286
22 01 244
CHANGING ROOM 01 218
01 201 01 202
ROOM FEMALE 01 240
01 379 ROOM 9 09 01 344 MEDICATION 01 287 MEDICATION
01 373
01 374
01 343 SOILED UTILITY
01 327
ROOM 01 243 EQUIPMENT
STORE
PREPARATION
ROOM
CONTRACTOR:
01 326
CCU
LINEN SUPPLIES
STORE 01 375 CONFERENCE ROOM LOUNGE
DOCTORS
OFFICE 01 345
01 288 01 294
I.C.U. I.C.U.
01 296
STORE 01 300
SPECIAL ELECTRICAL Elec.
2
PROJECT BUILD CO.
TOILET
06
01 376
BAY
01 371 01 370
EQUIP.
BAY
01 355 01 353 01 354
Mobile
X-Ray
HEAD NURSE
01 346
Unit NURSE STATION
02
01 325
01 429
Soiled Linen
01 289
CLEAN UTILITY
01 290
01 191 CLEAN LINEN
21
01 293
20
01 295 EQUIP.
BAY
01 298
TOILET
FEMALE
PROCEDURE TREAT/EXAM
01 302
01 220' ROOM
01 220
Shaft TREATMENT ROOM
01 230
IDF ROOM
01 219
NURSE STATION
01 209
01 203
TOILET
CCU
01 369
DESIGNER:
FHR/FHC-# 27
07
TOILET
01 368 MALE
DOCTOR LASER 2 LASER 1
ST 007 01 227
HDP
OFFICE ST 006
EQUIPMENT OR CORRIDOR LASER ROOM 01 208 01 205
healthcare designers
FHR/FHC-# 30
01 362 ROOM 3
I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. TOILET 01 221
I.C.U. I.C.U. I.C.U. I.C.U. I.C.U. 01 231 FEMALE
01 222
05 06 07 09 13 14 15 16 17 18
08 10 11 12 19
TOILET
01 364
01 360 01 357 01 351 01 349 01 323 01 321 01 319 01 317
01 315 01 313 01 311
01 309 01 307 01 305 01 303
01 226
SCRUB UP SINK and project managers
TOILET 01 206A
01 367 PROCEDURE PROCEDURE
ISOLATION ROOM ROOM ROOM
CCU 8
TREATMENT ROOM
LASER ROOM 1 STERILE 2 SMOKE MANAGEMENT SYSTEM:
4
ANTE ROOM, 8 TOILET TOILET TOILET TOILET TOILET TOILET TOILET TOILET TOILET TOILET CLEAN LINEN 01 207 STORE 01 206
01 366 TOILET TOILET TOILET TOILET TOILET 01 225 01 223
01 365 DOCTORS ROOM 01 352 01 350 01 324 01 322 01 320 01 318 01 316 01 314 01 224
NAFFCO
01 359 01 358 01 312 01 310 01 308 01 306 01 304 01 228
01 363
TITLE :
SMOKE MANAGEMENT SYSTEM
FIRST FLOOR PLAN
CHECKED.: AY REV.: 01
APPROVED: ZS SHEET: 1 OF 1