You are on page 1of 63

CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 1 of 63
“Boilerplate Template”, Identification Number

The undersigned individuals have reviewed the protocol and concur with the approach to validation.

APPROVAL

SIGNATURE DATE

Name – Author
Title, Department

Name
Title, Department

Name
Title, Quality Assurance

Name
Title, Validation

The undersigned individuals have reviewed and approved the executed protocol.

POST-EXECUTION APPROVAL

SIGNATURE DATE

Name – Author
Title, Department

Name
Title, Department

Name
Title, Quality Assurance

Name
Title, Validation
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 2 of 63
“Boilerplate Template”, Identification Number

TABLE OF CONTENTS
1 Purpose ........................................................................................................................................................... 4

2 Scope ............................................................................................................................................................... 4

3 Responsibilities .............................................................................................................................................. 4

4 Equipment/System Description .................................................................................................................... 5


4.1 Location and Detailed Description .................................................................................................................... 5
4.2 Utility Requirements ......................................................................................................................................... 5
5 Installation Qualification (IQ) Verification ................................................................................................ 5
5.1 Signature Verification List (Attachment 1) ....................................................................................................... 5
5.2 Standard Operating and Preventive Maintenance Procedures (Attachment 2) .................................................. 5
5.3 Equipment/System Calibration Documentation (Attachment 3) ....................................................................... 6
5.4 Test Equipment and Calibration Documentation (Attachment 4) ..................................................................... 6
5.5 Documentation and Drawings (Attachment 5) .................................................................................................. 6
5.6 Utilities and Services (Attachment 6) ............................................................................................................... 7
5.7 Installation Check (Attachment 7) .................................................................................................................... 7
5.8 Electrical Checks (Attachment 8)...................................................................................................................... 7
5.9 Mechanical Checks (Attachment 9) .................................................................................................................. 7
5.10 Control System (Attachment 10) ....................................................................................................................... 7
5.11 Consumables (Attachment 11) .......................................................................................................................... 9
6 Operational Qualification (OQ) Verification .............................................................................................. 9
6.1 System Safeguards/Alarms/Interlocks Testing (Attachment 12) ...................................................................... 9
6.2 General Controls/Screen Verification (Attachment 13) .................................................................................... 9
6.3 OQ Test Equipment and Calibration Documentation........................................................................................ 9
6.4 Operational Testing (Attachments 12 – 30) ...................................................................................................... 9
7 References (Attachment 31)......................................................................................................................... 10

8 Conclusion ...................................................................................................................................................... 10

9 Exceptional Conditions (Attachment 32) .................................................................................................... 10

10 General Form (Attachment 33) .................................................................................................................... 10

11 Attachments ................................................................................................................................................... 11
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 3 of 63
“Boilerplate Template”, Identification Number

TABLE OF ATTACHMENTS
Attachment 1: Signature Verification List ........................................................................................................................... 13
Attachment 2: Standard Operating and Preventive Maintenance Procedures ................................................................. 14
Attachment 3: Equipment/System Calibration Documentation ......................................................................................... 15
Attachment 4: Test Equipment and Calibration Documentation ...................................................................................... 16
Attachment 5: Documentation and Drawings ...................................................................................................................... 17
Attachment 6: Utilities and Services ..................................................................................................................................... 18
Attachment 7: Installation Check........................................................................................................................................... 19
Attachment 8: Electrical Checks ........................................................................................................................................... 20
Attachment 9: Mechanical Checks ........................................................................................................................................ 21
Attachment 10: Control System ............................................................................................................................................ 32
Attachment 11: Consumables ................................................................................................................................................ 37
Attachment 12: System Safeguards/Alarms/Interlocks Testing ......................................................................................... 38
Attachment 13: General Controls/Screen Verification........................................................................................................ 39
Attachment 14: Operation of Motors .................................................................................................................................... 40
Attachment 15: Operation of Pumps .................................................................................................................................... 41
Attachment 16: Operation of Valves ..................................................................................................................................... 42
Attachment 17: Pressure/Vacuum Hold Test ....................................................................................................................... 43
Attachment 18: Temperature Control Test .......................................................................................................................... 44
Attachment 19: Pressure Control Test.................................................................................................................................. 45
Attachment 20: Level Control Test ....................................................................................................................................... 46
Attachment 21: DO Control Test .......................................................................................................................................... 47
Attachment 22: pH Control Test ........................................................................................................................................... 48
Attachment 23: Flow Control Test ........................................................................................................................................ 49
Attachment 24: Temperature Mapping/Distribution Study ............................................................................................... 50
Attachment 25: Steam In Place (SIP) Test ........................................................................................................................... 55
Attachment 26: Clean In Place (CIP) Test ........................................................................................................................... 56
Attachment 27: Adjustment Mechanisms Test .................................................................................................................... 57
Attachment 28: Controller Test ............................................................................................................................................. 58
Attachment 29: Readout/Printout Checks ............................................................................................................................ 59
Attachment 30: Testing for Invalid Input............................................................................................................................. 60
Attachment 31: References .................................................................................................................................................... 61
Attachment 32: Exceptional Condition Form ...................................................................................................................... 62
Attachment 33: General Form ............................................................................................................................................... 63
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 4 of 63
“Boilerplate Template”, Identification Number

1 Purpose
The purpose of this validation protocol is to provide documentation that the (equipment/system name, make, model)
located in (building/room number) of (Client facility name) is assembled, installed and operates in accordance with
the manufacturers’ and (Client facility name) specifications.

2 Scope
The qualification of the (equipment/system name, make, model, ID number) provides documented evidence, with a
high degree of assurance that the equipment and/or process was installed properly and operates according to
operations and maintenance procedures (SOPs).
This validation protocol includes the following (as applicable):
• Standard Operating Procedures
• Calibration Documentation
• Utility and Service Requirements
• Electrical Assembly
• Mechanical Assembly
• Control Assembly
• Site Installation Confirmation
• Operational Testing

3 Responsibilities
Responsibilities for the qualification and completion of the documentation for the (system name) are defined in the
table below.

FUNCTION RESPONSIBILITY
Writing IQ/OQ Validation or Owner

Review of IQ/OQ Validation

Execution of IQ/OQ Validation or designee

Review of completed package Validation / QA

Approval of final package Validation / QA / Equipment Owner


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 5 of 63
“Boilerplate Template”, Identification Number

4 Equipment/System Description

4.1 Location and Detailed Description


The (equipment/system name, make, model, ID number) is located in (building/room #) of (Client facility
name). The (equipment/system name) is designed to (describe system adequately including hardware,
control system, etc.).

4.2 Utility Requirements


The supporting utilities for the (equipment/system name) include (provide a detailed description of all
utilities required for proper operation of the equipment/system and how they are utilized by the
equipment/system).

5 Installation Qualification (IQ) Verification


The Installation Qualification (IQ) provides documentation that the (equipment/system name, make, model, ID
number) has been assembled with the components specified, that all critical instruments have been calibrated and are
within their calibrated frequency, and that all required documentation has been attached to the protocol or its
location identified.
The execution of this protocol is performed on standardized forms that are used to document the data. These forms
are described below. All forms must be completed at the time of execution. Where more than one form is needed to
complete the documentation, the field copy page can be copied and used to complete the documentation. All data
must be recorded on the attached forms. Any manual calculations, charts or printouts (e.g., chart recordings, printer
tapes, etc.) associated with the testing must be attached to the protocol.
The notation “N/A” has the meaning Not Applicable for the purpose of this protocol.

5.1 Signature Verification List (Attachment 1)


This is a record of each individual who signs or initials any page of this document during execution or
review of the completed attachments. Anyone who signs or initials the executed protocol (other than the
Approvals page) has read and understood this document, as it applies to their job-specific functions.

5.2 Standard Operating and Preventive Maintenance Procedures (Attachment 2)


Identify relevant operational Standard Operating and Preventive Maintenance Procedures (SOP) documents
and confirm that they have been reviewed and are adequate to startup and run the (equipment/system). The
SOPs will be assessed for usability and accuracy during the Operational Qualification of the
(equipment/system). Non-approved SOPs (drafts or redlined) must be attached. Post execution approval
signatures can not be obtained until SOPs are approved.
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 6 of 63
“Boilerplate Template”, Identification Number

5.3 Equipment/System Calibration Documentation (Attachment 3)


Identify all instruments associated with the (equipment/system). Categorize the instruments according to
(Client SOP) as “For Reference Only (FRO), Functional Check Only (FC) and Critical (C) based on the
requirements of the system and the intended purpose of the instrument. Provide documentation showing
that the critical instruments have been calibrated and are within the calibration frequency as defined by the
manufacturers’ or (Client facility name) specifications. Include a copy of the Calibration Record for each
critical instrument.

5.4 Test Equipment and Calibration Documentation (Attachment 4)


Provide documentation that the instruments/equipment which were used to perform the IQ/OQ testing (e.g.,
Voltmeter, Amp Probe) have been calibrated and are within the calibration frequency as defined by the
manufacturers’ or (Client facility name) specifications. Include a copy of the Instrument Calibration
Record for each instrument.

5.5 Documentation and Drawings (Attachment 5)


Identify relevant documentation, which supports the (equipment/system), verifying the availability and
location of required documentation, including but not limited to; P&IDs and slope drawing must be field
verified.
• Operation and Maintenance Manuals
• Shop Drawings
• P&IDs
• Approved consumable and lubricants
• Cut sheets and specifications (electro/mechanical)
• Documentation of Engineering and Control System
• Changes (Change Log)
• Certification of Stainless Steel (pipes and vessels)
• ASME Certification
• Weld Reports
• Passivation/Flushing Reports
• Pressure Testing Report
• Control Systems
- Functional Requirements Specifications (computerized system)
- Source Code (computerized system)
- Hardware/Software Environment
- Ladder Logic (PLC)
- Modules (PLC)
- List of I/Os
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 7 of 63
“Boilerplate Template”, Identification Number

5.6 Utilities and Services (Attachment 6)


Identify the utilities and services required by the (equipment/system) and confirm that they provide the
required voltage and amperage, pressures, flows, capacity, environmental requirements and/or other
requirements as specified by the manufacturer.

5.7 Installation Check (Attachment 7)


Inspect the (equipment/system) to insure that it has been installed properly with all restraints, leveling and
other requirements as recommended by the manufacturer.

5.8 Electrical Checks (Attachment 8)


Inspect the (equipment/system) to insure that proper fuses/circuit breakers are in place, all wiring has been
positively identified by label and color code, that it is neatly bundled and assembled, and that all electrical
connections are tight and secure.

5.9 Mechanical Checks (Attachment 9)


Identify and document the mechanical components of the (equipment/system). Compare the expected
results for individual components to those actually installed in the equipment, as applicable, including but
not limited to:
• Motors
• Pumps
• Valves
• Vessels
• Mixing Blades/Impellers
• Piping
• Product Contact Components
• Alarms/Lockouts/Interlocks
• Gauges/Sensors
• Adjustment Mechanisms

5.10 Control System (Attachment 10)


Identify and document the control system, (e.g., ladder logic, software, source code, revision levels, and
location of backup) where applicable, and its components.

5.10.1 Controller (Electrical Mechanical)


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 8 of 63
“Boilerplate Template”, Identification Number

• Switches, Knobs, Lights, Indicators


• Wiring Diagram(s)
• Safety Interlocks

5.10.2 Control System (PLC)


• Ladder Logic
• Wiring Diagram(s)
• Modules
• I/Os
• Security Provisions
• Customer Support availability

• Change History

5.10.3 Control System (Computerized System)


• Functional Requirements Specification
• Source Code (supplied to client or in escrow)
• Wiring Diagram(s)
• I/Os
• Communication
• Design Specifications
• Alarms, Interlocks
• Power Failure Check
• Algorithms, formulas, calculations
• Archiving Procedure
• Disaster Recovery Procedures
• Security Provisions
• Customer Support availability
• Change History
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 9 of 63
“Boilerplate Template”, Identification Number

5.11 Consumables (Attachment 11)


Provide a list of all approved consumables, lubricants, and other items used during use of the
equipment/system.

6 Operational Qualification (OQ) Verification


The Operational Qualification (OQ) provides documentation that the (equipment/system) and components perform
as specified in the Standard Operating Procedures and are in accordance with manufacturers’ recommendations. It
confirms that the equipment/system is capable of meeting its intended purpose by comparing the specified
parameters to actual performance. Test design and acceptance specifications contained on the attached forms as
outlined below (as applicable) are based on requirements for the equipment/system to be validated.

6.1 System Safeguards/Alarms/Interlocks Testing (Attachment 12)


Provide documentation that all required safety devices, such as protective shields, interlocks, emergency
stop buttons and alarms are present and functional

6.2 General Controls/Screen Verification (Attachment 13)


Provide documentation for testing all screens and/or controls associated with the operation of the
(equipment/system), if applicable. Include verification of security codes, ability to access all screens, and
that all screens are functional.

6.3 OQ Test Equipment and Calibration Documentation


Confirm that documentation is provided showing that all instruments which were used to perform the OQ
testing are calibrated in accordance with industry accepted standards. Refer to Section 5.3 and update
Attachment 4 as necessary.

6.4 Operational Testing (Attachments 12 – 30)


The following operational checks are to be performed during execution of the protocol (where applicable).
Details of the testing methods and the documentation are included on the specific attachment for each test.
• Operation of Motors
• Operation of Pumps
• Operation of Valves
• Pressure/Vacuum Hold Test
• Temperature Control
• Pressure Control
• Level Control
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 10 of 63
“Boilerplate Template”, Identification Number

• DO Control
• pH Control
• Flow Control
• Temperature Mapping / Distribution Study
• Steam in Place (SIP)
• Clean in Place (CIP)
• Adjustment Mechanisms
• Controllers
• Readout/Printout
• Invalid Input

7 References (Attachment 31)


List any reference materials or related documents necessary to execute and analyze this IQ/OQ protocol, in addition
to the documentation identified in previous sections of this protocol, including specifications, standards or
procedures, regulatory references, drawings, manuals or project documentation.

8 Conclusion
The results of the IQ/OQ validation performed on the (equipment/system name, make, model, ID) confirm that the
(equipment/system) met the expected results and is acceptable for its intended use. All SOPs have been submitted for
revision and approval.

9 Exceptional Conditions (Attachment 32)


Exceptional conditions occurring during the execution of a validation protocol will be documented and justified
using the Exceptional Condition Form or on the General Form.
An exceptional condition is defined as any documentation or testing parameter that did not meet the expected result
or the acceptance criteria of the protocol during execution of the document.

10 General Form (Attachment 33)


This form is used to document observations or other information obtained during execution which is not covered by
another attachment, and will be included after all other attachments.
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 11 of 63
“Boilerplate Template”, Identification Number

11 Attachments
Attachment 1 Signature Verification List
Attachment 2 Standard Operating and Preventive Maintenance Procedures
Attachment 3 Equipment/System Calibration Documentation
Attachment 4 Test Equipment and Calibration Documentation
Attachment 5 Documentation and Drawings
Attachment 6 Utilities and Services
Attachment 7 Installation Check
Attachment 8 Electrical Checks
Attachment 9 Mechanical Checks
Attachment 10 Control System
Attachment 11 Consumables
Attachment 12 System Safeguards/Alarms/Interlocks Testing
Attachment 13 General Controls/Screen Verification
Attachment 14 Operation of Motors
Attachment 15 Operation of Pumps
Attachment 16 Operation of Valves
Attachment 17 Pressure/Vacuum Hold Test
Attachment 18 Temperature Control Test
Attachment 19 Pressure Control Test
Attachment 20 Level Control Test
Attachment 21 Do Control Test
Attachment 22 pH Control Test
Attachment 23 Flow Control Test
Attachment 24 Temperature Mapping/Distribution Study
Attachment 25 Steam in Place (SIP) Test
Attachment 26 Clean in Place (CIP) Test
Attachment 27 Adjustment Mechanisms Test
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 12 of 63
“Boilerplate Template”, Identification Number

Attachment 28 Controllers Test


Attachment 29 Readout/Printout Checks
Attachment 30 Testing for Invalid Input
Attachment 31 References
Attachment 32 Exceptional Condition Form
Attachment 33 General Form
CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 13 of 63
“Boilerplate Template”, Identification Number

Attachment 1: Signature Verification List


Page ____ of _____

All individuals who execute or review the attachments of this protocol must complete the information below. All individuals
performing operations associated with this protocol have read and understood this document and understand their job specific
functions. Make additional copies of this attachment as necessary.

Print Name Signature Department / Company Initial/Date

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 14 of 63
“Boilerplate Template”, Identification Number

Attachment 2: Standard Operating and Preventive Maintenance Procedures

Identify relevant SOP documents and confirm that they have been reviewed and are adequate to startup and run the
equipment/system. Non-approved SOPs (drafts or redlined) must be attached. Post execution approval signatures can not be
obtained until SOPs are approved.

Document No. Edition Title Date Initial/Date

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 15 of 63
“Boilerplate Template”, Identification Number

Attachment 3: Equipment/System Calibration Documentation

Page ____ of _____

Provide documentation showing that the instruments have been calibrated and are within the calibration frequency as defined
by the manufacturers’ or (Client facility name) specifications. Include a copy of the Calibration Record for each critical
instrument.

Equipment Identification Serial Calibration Calibration Calibration Initial/


Status
Used Number Number Certification # Date Due Date Date

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 16 of 63
“Boilerplate Template”, Identification Number

Attachment 4: Test Equipment and Calibration Documentation

Page ____ of _____

Provide documentation showing that the instruments/equipment used to perform the IQ/OQ testing have been calibrated and
are within the calibration frequency as defined by the manufacturers’ or (Client facility name) specifications. Include a copy
of the Instrument Calibration Record for each instrument.

Equipment Identification Serial Calibration Calibration Calibration


Initial/Date
Used Number Number Certification # Date Due Date

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 17 of 63
“Boilerplate Template”, Identification Number

Attachment 5: Documentation and Drawings

Page ____ of _____

Identify relevant documentation that supports the (equipment/system) and verify its availability and location.

Document or Rev. /
Title / Description Date Location Initial/Date
Drawing No. Edition

Manuals (example)

Purchase Orders (example)

Cut Sheets (example)

Engineering Specifications (example)

Factory Acceptance Tests (FATs) (example)

Site Acceptance Tests (SATs) (example)

Commissioning Documentation (example)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 18 of 63
“Boilerplate Template”, Identification Number

Attachment 6: Utilities and Services

Identify the utilities and services required by the (equipment/system) and verify that they provide the required voltage and
amperage, pressures, flows capacity and/or other requirements as specified by the manufacturer.

Actual Matches
Service / Utility Expected Result Actual Result Expected Initial/Date
(Yes/No)

Voltage 110  10% (example)

Amperage

Water

Steam

Gasses

Compressed Air

Oxygen

Nitrogen

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 19 of 63
“Boilerplate Template”, Identification Number

Attachment 7: Installation Check

Inspect the (equipment/system) to insure that it has been installed properly as recommended by the manufacturer.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Restraints

Leveling

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 20 of 63
“Boilerplate Template”, Identification Number

Attachment 8: Electrical Checks

Inspect the (equipment/system) to insure that electrical connections and components are properly and safely installed.

Actual Matches
Description Expected Result Actual Result Initial/Date
Expected (Yes/No)

All connections checked for tightness All connections tight

All wiring checked for labeling and Clearly labeled and color coded
color coding

All wiring checked for routing and Neat cable runs with all wiring
neat bundling bundled and tied

Check for visible damage to wiring No damage to wiring or insulation


and insulation

Check that all unused wires are All unused wires are capped or
capped or sealed sealed

Check that transformer is tapped for Transformer is tapped for specified


specified voltage voltage:

Check that all fuses/breakers conform All fuses/breakers conform to


to specified rating specified rating:

amps

amps
amps

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 21 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Motors

Manufacturer

Model

Serial Number

Voltage

Amperage

Frequency

Phases

RPM

Motor Duty Rating

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 22 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Pumps

Manufacturer

Model

Serial Number

Type

Impeller Size/Material of Construction

GPM

Pressure

Material of Construction, Case

Material of Construction, Seals

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 23 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Description Expected Result Actual Result Actual Matches Initial/Date


Expected (Yes/No)

Valves

Manufacturer

Model

Serial Number

Type

Material of Construction

Size

Valve Actuator, if present

Manufacturer

Model

Size

Material of Construction, Seals

Material of Construction, Diaphragm

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 24 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Vessels (Vessel #________________)

Manufacturer

Material of Construction

Dimensions

Pressure Rating

Interior Finish (minimum 150 grit)

Dish Design

Number of Penetrations

Gasket Material (Manway)

Gasket Material (Unions)

Jacketed

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 25 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Mixing Blades / Impellers

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 26 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Piping

Manufacturer

Model

Serial Number

Schedule

Material of Construction

Interior Finish

Interior Diameter

Dead Legs  6 pipe diameters

Slope 1/8 to 1/4 inch/foot

Gasket Material (if union)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 27 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Product Contact Components

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 28 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Alarms / Lockouts / Interlocks

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 29 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Gauges / Sensors

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 30 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Adjustment Mechanisms

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 31 of 63
“Boilerplate Template”, Identification Number

Attachment 9: Mechanical Checks (Continued)

Page ____ of _____

Identify and document the mechanical components of the (equipment/system). Compare the expected results for individual
components to those actually installed.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 32 of 63
“Boilerplate Template”, Identification Number

Attachment 10: Control System

Page ____ of _____

Identify and document the control system (e.g., ladder logic, software, source code, revision level, and location of backup,
where applicable) and its components. Compare the control system specifications to those actually installed in the
equipment, as applicable.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Controller (Electrical/Mechanical)

Switches

Knobs

Lights

Indicators

Wiring Diagram(s)

Safety Interlocks

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 33 of 63
“Boilerplate Template”, Identification Number

Attachment 10: Control System (Continued)

Page ____ of _____

Identify and document the control system (e.g., ladder logic, software, source code, revision level, and location of backup,
where applicable) and its components. Compare the control system specifications to those actually installed in the
equipment, as applicable.

Actual Matches
Description Expected Result Actual Result Initial/Date
Expected (Yes/No)

Computer / PLC Hardware and Software

PC / PLC

Hard Drive / CPU

RAM

Ladder Logic

Wiring Diagram(s)

Modules

I/Os (Input / Outputs)

Security Provisions

Customer Support availability

Change History

Software (Title / Version #)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 34 of 63
“Boilerplate Template”, Identification Number

Attachment 10: Control System (Continued)

Page ____ of _____

Identify and document the control system (e.g., ladder logic, software, source code, revision level, and location of backup,
where applicable) and its components. Compare the control system specifications to those actually installed in the
equipment, as applicable.

Actual Matches
Description Expected Result Actual Result Initial/Date
Expected (Yes/No)

Computerized System
Functional Requirements Specification

Source Code

Wiring Diagram(s)

I/Os (Input/Outputs)

Communication

Design Specification

Alarms/Interlocks

Power Failure Check

Algorithms, formulas, calculations

Archiving Procedure

Disaster Recovery Procedures

Security Provisions

Customer Support availability

Change History

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 35 of 63
“Boilerplate Template”, Identification Number

Attachment 10: Control System (Continued)

Page ____ of _____

Identify and document the control system (e.g., ladder logic, software, source code, revision level, and location of backup,
where applicable) and its components. Compare the control system specifications to those actually installed in the
equipment, as applicable.

Screens Match
Screen Title Display Initial/Date
(Yes/No)

Screens / Explanations

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 36 of 63
“Boilerplate Template”, Identification Number

Attachment 10: Control System (Continued)

Page ____ of _____

Identify and document the control system (e.g., ladder logic, software, source code, revision level, and location of backup,
where applicable) and its components. Compare the control system specifications to those actually installed in the
equipment, as applicable.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 37 of 63
“Boilerplate Template”, Identification Number

Attachment 11: Consumables

Page ____ of _____

Provide a list of all approved consumables, lubricants, and other items used during use of the (equipment/system).

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 38 of 63
“Boilerplate Template”, Identification Number

Attachment 12: System Safeguards/Alarms/Interlocks Testing

Page ____ of _____

Provide documentation that all required safety devices, such as protective shields, interlocks, emergency stop buttons and
alarms are present and functional.

Actual Matches
Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Check all switches, dials and buttons All switches, dials and buttons
for (mechanical) operability are operable (mechanically)

Check that all indicators are present and


have working bulbs (if applicable)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 39 of 63
“Boilerplate Template”, Identification Number

Attachment 13: General Controls/Screen Verification

Page ____ of _____

Document testing of all screens and/or controls associated with the (equipment/system) operation. Include verification of
security codes, ability to access all screens, and functionality of all screens.

Screen Name:

Screen Description:

Actual Matches
Test Description Expected Result Actual Result Initial/Date
Expected (Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 40 of 63
“Boilerplate Template”, Identification Number

Attachment 14: Operation of Motors

Page ____ of _____

Document testing of motors associated with the (equipment/system) operation.

Motor Identification:

Serial No.: ID No.:

Actual Matches
Test Procedure Expected Result Actual Result Initial/Date
Expected (Yes/No)

Use an RPM meter to determine the


RPM of the motor

Check the direction of rotation of the


shaft

Check the current draw Amps (1 Phase) _____ Amps

Amps (3 Phase)

A – B _____ Amps

B – C _____ Amps
A – C _____ Amps

Difference between phases


must be ________ Amps

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 41 of 63
“Boilerplate Template”, Identification Number

Attachment 15: Operation of Pumps

Page ____ of _____

Document testing of pumps associated with the (equipment/system) operation.

Pump Identification:

Serial No.: ID No.

Actual Matches
Test Procedure Expected Result Actual Result Initial/Date
Expected (Yes/No)

Use a bucket and a stopwatch and


collect sample for 1 minute OR use GPM GPM
a calibrated flow meter.

Determine the system pressure by


use of an installed (calibrated)
gauge or a calibrated gauge that has psig psig
been installed for the validation.

Determine the velocity of the flow


(Ft/sec)

GMP = ______________
Ft/sec
Pipe ID = ___________ in.

GMP x 0.409
Ft/sec =

Pipe ID
__________________ Ft/sec

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 42 of 63
“Boilerplate Template”, Identification Number

Attachment 16: Operation of Valves

Page ____ of _____

Document testing of valves associated with the (equipment/system) operation.

Valve Identification: Tag No.

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 43 of 63
“Boilerplate Template”, Identification Number

Attachment 17: Pressure/Vacuum Hold Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 44 of 63
“Boilerplate Template”, Identification Number

Attachment 18: Temperature Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 45 of 63
“Boilerplate Template”, Identification Number

Attachment 19: Pressure Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 46 of 63
“Boilerplate Template”, Identification Number

Attachment 20: Level Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 47 of 63
“Boilerplate Template”, Identification Number

Attachment 21: DO Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 48 of 63
“Boilerplate Template”, Identification Number

Attachment 22: pH Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 49 of 63
“Boilerplate Template”, Identification Number

Attachment 23: Flow Control Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 50 of 63
“Boilerplate Template”, Identification Number

Attachment 24: Temperature Mapping/Distribution Study

Testing Equipment Calibration

Purpose

To calibrate and verify testing equipment. Thermocouples will be calibrated by comparison against a measurement standard
of known accuracy in order to detect, correlate, report, or eliminate (by adjustment) any unacceptable variation in the
accuracy of the instrumentation being measured.

Test Procedure

Verify testing equipment has been calibrated. Record testing equipment calibration documentation on Attachment 3.

Acceptance Criteria

Thermocouples will pre-calibrate within _______C of the reference temperature.

Operational thermocouples will post-verify within ______C of the reference temperature.

At least ninety percent of the thermocouples used must be operational upon completion of the study.

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 51 of 63
“Boilerplate Template”, Identification Number

Attachment 24: Temperature Mapping/Distribution Study (Continued)

Page ____ of _____

Testing Equipment Calibration Data Sheet

Pass / Fail

Thermocouples pre-calibrate within ______C of the reference temperature.

Operational thermocouples post-verify within ______C of the reference temperature.

At least ninety percent of thermocouples are operational upon completion of the study.

If no, explain:

Filename to which the data was written:

Location of the file:

Print Outs Attached YES / NO

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 52 of 63
“Boilerplate Template”, Identification Number

Attachment 24: Temperature Mapping/Distribution Study (Continued)

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 53 of 63
“Boilerplate Template”, Identification Number

Attachment 24: Temperature Mapping/Distribution Study (Continued)

Page ____ of _____

Thermocouple Placement Data Sheet

Channel Thermocouple Location Description Channel Thermocouple Location Description

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 54 of 63
“Boilerplate Template”, Identification Number

Attachment 24: Temperature Mapping/Distribution Study (Continued)

Page ____ of _____


Results

Cycle

Study Start Time Study End Time

Study Duration Setpoint Temperature

Summary

Minimum Temperature Reading During Study (Cold Spot)

Minimum Temperature Thermocouple Number

Maximum Temperature Reading During Study (Hot Spot)

Maximum Temperature Thermocouple Number

Average Temperature

Standard Deviation

Attach Temperature Mapping Documentation.

Acceptance Criteria Pass/Fail

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 55 of 63
“Boilerplate Template”, Identification Number

Attachment 25: Steam In Place (SIP) Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 56 of 63
“Boilerplate Template”, Identification Number

Attachment 26: Clean In Place (CIP) Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 57 of 63
“Boilerplate Template”, Identification Number

Attachment 27: Adjustment Mechanisms Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 58 of 63
“Boilerplate Template”, Identification Number

Attachment 28: Controller Test

Page ____ of _____

Actual Matches
Test Procedure Expected Result Actual Result Expected Initial/Date
(Yes/No)

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 59 of 63
“Boilerplate Template”, Identification Number

Attachment 29: Readout/Printout Checks

Page ____ of _____

Test the permutations of the equipment’s ability to calculate, display and print out various combinations of numbers, which
tests the extremes of the anticipated outputs.

Actual Matches
Test Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

99 + 99

(-) 99 + (-) 99

91 + (-) 24

(-) 57 + 73

36 + 88

9+9

0+0

0 + 18

(-) 54 + 0

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 60 of 63
“Boilerplate Template”, Identification Number

Attachment 30: Testing for Invalid Input

Page ____ of _____

Test the inputs to the equipment to confirm that invalid entries do not cause the system to crash or give erroneous results.

Actual Matches
Test Description Expected Result Actual Result Expected Initial/Date
(Yes/No)

Enter a number  the valid input Cannot be entered

Enter decimal numbers  the valid input


and confirm proper rounding of result.

Attempt to enter invalid characters.

Attempt to enter no data. Press Enter.

Comments:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 61 of 63
“Boilerplate Template”, Identification Number

Attachment 31: References

Page ____ of _____

List any reference materials or related documents necessary to execute and analyze this IQ/OQ protocol, in addition to the
documentation identified in previous attachments.

Revision/
Document No. Title Date Location
Edition

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 62 of 63
“Boilerplate Template”, Identification Number

Attachment 32: Exceptional Condition Form


Page ____ of _____
Description of Exceptional Condition

Corrective Action

Effect on Protocol Execution

Comments:

Documented By: Date:

Reviewed By: Date:


CONFIDENTIAL

DRAFT
VALIDATION PROTOCOL

DRAFT Date: 5/2/23 12:18 PM : Validation Protocol Template for LinkedIn.doc


Title: Installation and Operational Qualification (IQ/OQ) Doc No.: Vx-XXXXX Page: 63 of 63
“Boilerplate Template”, Identification Number

Attachment 33: General Form

Page ____ of _____

Document observations or other information obtained during IQ/OQ execution which is not covered by another attachment.

Comments:

Documented By: Date: