You are on page 1of 9

DOCUMENT NUMBER

DOCUMENT DESCRIPTION OGA,IGA, POWER WIRING DIAGRAM,


CONTROL WIRING DIAGRAM.

SUPPLIER NAME 3D

CLIENT NAME

PROJECT DESCRIPTION

DRAWING NUMBER

TYPE POWER CUM CONTROL PANEL

NA
3D

NA

NA

IGA 00
700 350 350
154
G

78
FRONT

OVER RUN UNDER


100
LOAD LOAD

100
F

EMERGENCY START FWD REV

H
B C D E

A ON OFF SELECTOR SWITCH

850

850

850
B EMERGENCY STOP PUSH
100
C ILLUMINATION START PUSH

100
D FWD PUSH BUTTON
H

E REV PUSH BUTTON


A

F INDICATION (OVERLOAD,RUN,UNDERLOAD)
75

75

75
G LOADCELL CONTROLLER
FRONT LEFT RIGHT
H 4INCH PANEL FAN,LUVER
700 700

22
350

350
BOTTOM GLAND PLATE TOP

3D

GA 01
700

A MCB DP: 10A. x 5


DP MCB

10A
DP MCB

10A
DP MCB

10A
DP MCB

10A
DP MCB

10A
DP MCB

10A SMPS SMPS


B MCB DP: 10A FOR LOAD CELL CONTROLLER
A B C D
C PLC, SMPS 5A

D SMPS 4.5A FOR LOAD CELL CONTROLLER

850
ASDA-A2 ASDA-A2 ASDA-A2 ASDA-A2
F G

E SERVO DRIVE 400W x4

E
F SLIM RELAY 1C0 24V X4

G SLIM RELAY 1C0 24V X4 FOR LOAD CELL CONTROLLER


I J
H

H CONTROL TERMINAL BLOCK

I 24V DC TERMINAL BLOCK


75 J 220V AC PLUG SOCKET

NA
3D

NA

NA

IGA 02
220V 50HZ AC SUPPLY

ON/OFF SSW
L L1
N N1
E

1 2 3 4 5 6

E L2 N2 E L3 N3 E L4 L4 E L5 N5 E L6 N6 E L7 N7

SMPS1 SMPS2
SERVO SERVO SERVO SERVO
DRIVE DRIVE DRIVE DRIVE 24V 0V 24V 0V
400W 400W 400W 400W P2 M2

1 2 3 4

L8
L9

P2 M2
PLUG SOCKET
1 2 3 4

3D

03
A B C D E F G H I J K

1 EMG STOP 1
S1/1
P1 P3 P3 P3 P3 P3 P3 P3

2 2

S2 S3 S4 S5 S6 S7

3 3

S/S

4 4

S1/1 EMERGENCY STOP

S2 START PUSH

5 + -
S3 MANUAL UP 5
S4 MANUAL DOWN

S5 LEVER
P3 M1 E S6 SPARE

S7 SPARE

P3 24V DC FROM SMPS 1

M1 0V DC FROM SMPS 1
6 E1 ELECTRONIC EARTHING
6
AI+/AI- ANALOG INPUT

SUPPLIER: CLIENT: PROJECT:-


7 3D 7
TITLE:-

8 ISO 128
JOB NO:- 8
SHEET:- CTRL CKT SHEET NO:- 04

A B C D E F G H I J K
A B C D E F G H I J K

1 1

2 2

3 3

4 4

5 5

R1 RELAY 1 COIL

R2 RELAY 2 COIL
6 R3 RELAY 3 COIL
6
R4 RELAY 4 COIL

SUPPLIER: CLIENT: PROJECT:-


7 3D 7
TITLE:-

8 ISO 128
JOB NO:- 8
SHEET:- CTRL CKT SHEET NO:- 05

A B C D E F G H I J K
A B C D E F G H I J K

1 1

2 2
TB1-3 TB1-4 TB1-5 TB1-6 TB1-7 TB1-8 TB1-9 TB1-10

3 3

4 4

5 5

6 6

SUPPLIER: CLIENT: PROJECT:-


7 3D 7
TITLE:-

8 ISO 128
JOB NO:- 8
SHEET:- CTRL CKT SHEET NO:- 06

A B C D E F G H I J K
A B C D E F G H I J K

1 1

2 2

3 3

4 4

TB1-11 TB1-12 TB1-13

5 5

R1.1 RELAY 1 NO CONTACT

R2.1 RELAY 2 NO CONTACT

R3.1 RELAY 3 NO CONTACT


R4.1
6 H1
RELAY 3 NO CONTACT

GREEN LAMP FOR START THE SYSTEM


6
P3 24VDC FROM SMPS 1 BUS

M1 0VDC FROM SMPS 1 BUS

SUPPLIER: CLIENT: PROJECT:-


7 3D 7
TITLE:-

8 ISO 128
JOB NO:- 8
SHEET:- CTRL CKT SHEET NO:- 07

A B C D E F G H I J K
A B C D E F G H I J K

1 1

2 2

3 3

4 4

R5 RELAY 5 COIL

R6 RELAY 6 COIL
5 R7 RELAY 7 COIL 5
R8 RELAY 8 COIL

R5.1 RELAY 5 NO CONTACT

R6.1 RELAY 6 NO CONTACT

FROM 05.D6 R7.1 RELAY 7 NO CONTACT

H2 AMBER LAMP FOR UNDERLOAD

6 H3 RED LAMP FOR OVERLOAD


6
H4 GREEN LAMP FOR RUN

P4 24VDC FROM SMPS 2 BUS

SUPPLIER: CLIENT: PROJECT:-


7 3D 7
TITLE:-

8 ISO 128
JOB NO:- 8
SHEET:- CTRL CKT SHEET NO:- 08

A B C D E F G H I J K

You might also like