Professional Documents
Culture Documents
HB HOSS BIBB - - - 20 -
CHECK VALVE
WATER METER SPECIFICATION
1 2 3 4 5
1 2 3 4 5
PROPERTY LINE
50 mm Ø DOWNSPOUT
C.O GUTTER DRAIN
A CB CB
SHO
75 mm Ø PVC VSTR
SD A
WC STORAGE
FD
BEDROOM -02 BEDROOM -03 KITCHEN AREA
LAV
63 mm Ø VENT BRANCH
CB CB
B C.O
SHO
B
125 mm Ø PVC DRAIN PIPE
FD
SDWC LAV
PROPERTY LINE
SEPTIC T&B
C.O
DINING AREA
125 mm Ø PVC DRAIN PIPE
LIVING AREA
C
100 mm Ø PVC SOIL PIPE
MASTER'S BEDROOM C
BEDROOM -01
CB CB
D
D
ROOF
TO MAIN SEWER LINE TO MAIN SEWER LINE 2 SANITARY & STORM DRAINAGE LAYOUT
P1 SCALE: 1:100 MTS
1 SANITARY & STORM DRAINAGE LAYOUT
P1 SCALE: 1:100 MTS
COMPANY: MEMBERS: PROJECT TITLE : APPROVED BY OWNER: DESIGNED BY: SHEET CONTENTS : SHEET NO :
R.A. 9266 : SECTION 33
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING GROUP 2
TARLAC STATE UNIVERSITY ALL DRAWINGS AND AQUINO, ROCHELLE M. ILUMIN, JOZEL D. CHECKED BY: GENERAL NOTES, LEGEND, P-1
SPECIFICATIONS AND OTHER OWNER :
COLLEGE OF ENGINEERING AND TECHNOLOGY GROUP 2
..\..\..\..\Jozel Ilumin\Documents\Computer Fundamental\TSU.png CONTRACT DOCUMENTS DULY TIMBAL, ASHLEY JOYCE P. LUGTU, JOHN PAUL M. SANITARY AND STORM
SIGNED, STAMPED OR SEALED, AS MR. AND MRS. ARTURO A. GALANG DRAWN BY:
GALANG, AEGAHN CLIFFORD T. GROUP 2 DRAINAGE LAYOUT
ENGR. ORLANDO CRUZ SICO JR. INSTRUMENTS OF SERVICE ARE THE
PROJECT LOCATION : MR. AND MRS. ARTURO A. GALANG 0 0
INTELLECTUAL PROPERTY AND SECTION: BSCE-2D PLACE: TSU DATE:
INSTRUCTOR
DOCUMENTS OF THE ARCHITECT. BUROT, TARLAC CITY
GRP NO: GROUP 2 DATE: MAY 2023 MAY 2023 FOR CONSTRUCTION
HOT WATER OUT
COLD WATER IN
1 2 3 4 5
1.50 METERS
210 mm Ø
WT P UNDERGROUND WATER SUPPLY
WATER PUMP
A
19 mm Ø PPR CWL
19 mm Ø PPR HWL
STORAGE
BEDROOM -02
BEDROOM -03 KITCHEN AREA
T&B
DINING AREA
C LIVING AREA
MASTER'S BEDROOM
BEDROOM -01
WM
COMPANY: MEMBERS: PROJECT TITLE : APPROVED BY OWNER: DESIGNED BY: SHEET CONTENTS : SHEET NO :
R.A. 9266 : SECTION 33
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING GROUP 2
TARLAC STATE UNIVERSITY ALL DRAWINGS AND
SPECIFICATIONS AND OTHER
AQUINO, ROCHELLE M. ILUMIN, JOZEL D.
OWNER :
CHECKED BY: WATERLINE LAYOUT, RANGE P-2
COLLEGE OF ENGINEERING AND TECHNOLOGY GROUP 2
..\..\..\..\Jozel Ilumin\Documents\Computer Fundamental\TSU.png CONTRACT DOCUMENTS DULY TIMBAL, ASHLEY JOYCE P. LUGTU, JOHN PAUL M. BOILER, AND WATER TANK
SIGNED, STAMPED OR SEALED, AS MR. AND MRS. ARTURO A. GALANG DRAWN BY:
GALANG, AEGAHN CLIFFORD T. GROUP 2
DETAILED PLAN
ENGR. ORLANDO CRUZ SICO JR. INSTRUMENTS OF SERVICE ARE THE
PROJECT LOCATION : MR. AND MRS. ARTURO A. GALANG 0 0
INTELLECTUAL PROPERTY AND SECTION: BSCE-2D PLACE: TSU DATE:
INSTRUCTOR
DOCUMENTS OF THE ARCHITECT. BUROT, TARLAC CITY
GRP NO: GROUP 2 DATE: MAY 2023 MAY 2023 FOR CONSTRUCTION
L = 25 x 25 x 6 FRAME
MILD STEEL GRATING COVER 1.00 METERS 2.00 METERS
MANHOLE HANDLE,
FIN. FLR. LEVEL 12mmØ PLAIN BAR
0.40
0.30 METERS AIR SPACE 4" THICK CHB WITH 10mmØ
VERTICAL BARS @ 0.80 &
10mmØ HORIZONTAL BARS
1.90 METERS
10mmØ BARS @ 0.20 @ EVERY 3 LAYERS OF CHB.
M.O.C. BOTH WAYS
LEACHING
1.50 METERS
DIGESTIVE CHAMBER
0.50
0.60
0.60
0.40
HOR. & VERT. BARS @ 200 mm. MANHOLE MANHOLE
O.C. MILD STEEL GRATING COVER
.50X.50 .50X.50 4" THICK CHB WITH 10mmØ 10mmØ BARS @ 0.20
VERTICAL BARS @ 0.80 &
M.O.C. BOTH WAYS
10mmØ HORIZONTAL BARS
@ EVERY 3 LAYERS OF CHB.
3" Ø PVC DRAIN PIPE
0.20
0.10
4 - 10 Ø BOTTOM
BARS BOTHWAYS 3-10mmØ LONGITUDINAL
(VER. STRUCT' L. 3.00 METERS
BARS 10mmØ BARS @ 0.20
SEPTIC TANK SECTION: M.O.C.
SEPTIC TANK PLAN:
SECTION
COUNTER SUNK
FLOOR CLEAN OUT
CONCRETE TOPPINGS
CAPPED
WATER PROOFING MEMBRANE
(VERIFY ARCH'L. SPECS.)
20 Ø AIR 25 Ø AIR
CHAMBER CHAMBER
HANGER ROD
SLAB SOFFIT
HANGER ROD
LATERAL/BRANCH SLAB SOFFIT
SOIL PIPE (SP)
CEILING LATERAL/BRANCH
CLEAN OUT SOIL PIPE (SP)
FIXTURE
TO FIXTURE
CONCRETE TOPPINGS
COMPANY: MEMBERS: PROJECT TITLE : APPROVED BY OWNER: DESIGNED BY: SHEET CONTENTS : SHEET NO :
R.A. 9266 : SECTION 33
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING GROUP 2
TARLAC STATE UNIVERSITY ALL DRAWINGS AND
SPECIFICATIONS AND OTHER
AQUINO, ROCHELLE M. ILUMIN, JOZEL D.
OWNER :
CHECKED BY: CATCH BASIN DETAILED PLAN, P-3
COLLEGE OF ENGINEERING AND TECHNOLOGY
TIMBAL, ASHLEY JOYCE P. LUGTU, JOHN PAUL M.
GROUP 2 SEPTIC TANK, CLEANOUT, AND
..\..\..\..\Jozel Ilumin\Documents\Computer Fundamental\TSU.png CONTRACT DOCUMENTS DULY
SIGNED, STAMPED OR SEALED, AS MR. AND MRS. ARTURO A. GALANG DRAWN BY:
GALANG, AEGAHN CLIFFORD T. GROUP 2
AIR CHAMBER DETAILS
ENGR. ORLANDO CRUZ SICO JR. INSTRUMENTS OF SERVICE ARE THE
PROJECT LOCATION : MR. AND MRS. ARTURO A. GALANG 0 0
INTELLECTUAL PROPERTY AND SECTION: BSCE-2D PLACE: TSU DATE:
INSTRUCTOR
DOCUMENTS OF THE ARCHITECT. BUROT, TARLAC CITY
GRP NO: GROUP 2 DATE: MAY 2023 MAY 2023 FOR CONSTRUCTION
75 mm Ø VSTR
GD
GD
50 mm Ø DOWNSPOUT
A 1
50 mm Ø DOWNSPOUT
GD
B CBNT 2
E
HV
E NC
LIN RA
TY CB PR
ER PV
C P ROP
SE CB 63
mm
Ø
BE
DR
OP
ER
TY
3
PT OO LIN
IC SD C.O E
M
GD SD W -0 WC
2
D OI
L PIP
E
PIP
E
C
T & FDL
F
LA D
V B
4
PV
CS
RA
IN B AV C.O ED GD
Ø CD RO
50 mm Ø DOWNSPOUT
mm PV C.O O ST
0 Ø M
10
1 25
m m MA
S
-0
3
O. 5
CB TE
R'S GD
BE
50 mm Ø DOWNSPOUT
DR KIT
TO OO CH
MA LMIV EN
IN GA AR CB
IN EA
SE RE
WE A
RL
INE DIN
ING CB
GD E
BE AR PIP
EA
50 mm Ø DOWNSPOUT
IN E
DR D RA
TY
LIN
OO PVC
OP
ER
M Ø PR
-0 mm
1 12
5
CB
TO
MA
IN
SE
WE
RL
INE
ISOMETRIC
1 SANITARY & STORM DRAINAGE LAYOUT
P4 SCALE: 1:100 MTS
COMPANY: MEMBERS: PROJECT TITLE : APPROVED BY OWNER: DESIGNED BY: SHEET CONTENTS : SHEET NO :
R.A. 9266 : SECTION 33
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING GROUP 2
TARLAC STATE UNIVERSITY ALL DRAWINGS AND
SPECIFICATIONS AND OTHER
AQUINO, ROCHELLE M. ILUMIN, JOZEL D.
OWNER :
CHECKED BY: P-4
..\..\..\..\Jozel Ilumin\Documents\Computer Fundamental\TSU.png
COLLEGE OF ENGINEERING AND TECHNOLOGY
CONTRACT DOCUMENTS DULY TIMBAL, ASHLEY JOYCE P. LUGTU, JOHN PAUL M.
GROUP 2 SANITARY AND STORM
SIGNED, STAMPED OR SEALED, AS MR. AND MRS. ARTURO A. GALANG DRAWN BY: DRAINAGE LAYOUT
GALANG, AEGAHN CLIFFORD T. GROUP 2
ENGR. ORLANDO CRUZ SICO JR. INSTRUMENTS OF SERVICE ARE THE
PROJECT LOCATION : MR. AND MRS. ARTURO A. GALANG 0 0
INTELLECTUAL PROPERTY AND SECTION: BSCE-2D PLACE: TSU DATE:
INSTRUCTOR
DOCUMENTS OF THE ARCHITECT. BUROT, TARLAC CITY
GRP NO: GROUP 2 DATE: MAY 2023 MAY 2023 FOR CONSTRUCTION
A BORAN 1
ILE GE
R
WA
TE
B RT
AN
K
2
WL L
E R H CW
LIN P P R
Y Ø PP
E RT m Ø
OP m m BE
C PR 19 9 m
1 D RO PR
OP 3
OM WA ER
TY
-02 TER P LINE
PU
M
D T&
P UN
DE 4
B BE RG
DR RO
OO UN
D
MA
ST
M
-03 ST
O
WA
T ER
5
ER RA SU
'S GE P
BE PL
DR KIT Y
OO CH
M EN
LIV AR
IN EA
G
AR
EA
DI
NI
NG
AR
EA
INE
T YL
BE ER
DR OP
PR
OO
M
-01
M
TO
MA
IN
WA
TER
SO
UR
CE
ISOMETRIC
COMPANY: MEMBERS: PROJECT TITLE : APPROVED BY OWNER: DESIGNED BY: SHEET CONTENTS : SHEET NO :
R.A. 9266 : SECTION 33
PROPOSED SINGLE STOREY RESIDENTIAL BUILDING GROUP 2
TARLAC STATE UNIVERSITY ALL DRAWINGS AND AQUINO, ROCHELLE M. ILUMIN, JOZEL D. CHECKED BY:
P-5
SPECIFICATIONS AND OTHER OWNER :
COLLEGE OF ENGINEERING AND TECHNOLOGY GROUP 2
..\..\..\..\Jozel Ilumin\Documents\Computer Fundamental\TSU.png CONTRACT DOCUMENTS DULY TIMBAL, ASHLEY JOYCE P. LUGTU, JOHN PAUL M. WATER LINE LAYOUT
SIGNED, STAMPED OR SEALED, AS MR. AND MRS. ARTURO A. GALANG DRAWN BY:
GALANG, AEGAHN CLIFFORD T. GROUP 2
ENGR. ORLANDO CRUZ SICO JR. INSTRUMENTS OF SERVICE ARE THE
PROJECT LOCATION : MR. AND MRS. ARTURO A. GALANG 0 0
INTELLECTUAL PROPERTY AND SECTION: BSCE-2D PLACE: TSU DATE:
INSTRUCTOR
DOCUMENTS OF THE ARCHITECT. BUROT, TARLAC CITY
GRP NO: GROUP 2 DATE: MAY 2023 MAY 2023 FOR CONSTRUCTION