Construction project checklist
Task name
Assigned
Status

ives
Goals and object Competitor analy
sis
+2 Ta
ives
1 Goals and object In progress
sis John
1.1 Competitor analy Open
+2
1.2 Key objectives
tions
Features & Func s
Required Material
Company na1.m
3 e
ures & Functions
Project manager Required Methods
2 Feat In progress
Brian
Project name2.1 Required Material
s
unassigned
Open address
Required Methods
Project numb2.e2r Required Know-H
owJohn
Done
Date
ogress
2.3 +2 In pr 21 - 04.06.2021 5.202
Required Team Budget 13.05.20 12.05.2021 - 17.0
2.4 +
3 Budget
Initiation 3.1 +2 In progress
cto rs
3.2 Work with Contra Open
Brian 8h
Model Product Lif
e In progress
Description 3.3 +1 igned to
Ass 28.10.2019 Date
In progress
Remarks 8h

1.2.1
New sibling task 01.11.2019
Angel Dillon 30m
Determine the sco1.p2.2e of work New sibling task 11.11.2019
In progress
unassigned
1.2.3
New sibling task
Define project deliverables
Create the list of stakeholders1

Determine a start date


Define a project completion date
Assess risks
Prepare a risk mitigation plan
Place a competitive bid
Draft a psproposal
Get Ap

Estimate costs and fees


Evaluate unplanned expenses
Draft a contract
Arrange contract negotiations
Determine the payment terms
Approve the contract terms
Fix change requests
Sign the contract
Checklist by GanttPRO, online project planning software

based on a Gantt chart


Company name Project manager

Project name address

Project number Date

Planning

Description Assigned to Date Remarks

Cover all budget issues

Consider direct costs

Account indirect costs

Consider contingency allowance

Prepare a cash flow chart

Create a cost-controlling plan

Create a WBS

Prepare project schedules

Define a critical path

Identity project risks

Compose a communication plan

Make a contact list

Assign stakeholder meetings

Run on-site meetings

Prepare a procurement plan

Select suppliers and subs

List the items to order ahead

Checklist by GanttPRO, online project planning software

based on a Gantt chart


Company name Project manager

Project name address

Project number Date

Execution

Description Assigned to Date Remarks

Carpentry

Plasterwork

Concrete work

Roof work

Electrical work

Piping work

Tile/brick/block work

Steel construction work

Sheet metal work

Glass work

Coating work

Waterproofing work

Interior finishing

Machinery installation

Thermal insulation work

Telecommunications work

Landscape gardening

Checklist by GanttPRO, online project planning software

based on a Gantt chart


Company name Project manager

Project name address

Project number Date

Monitoring and control

Description Assigned to Date Remarks

Update the daily log to balance


work and safety

Track changes

Control material usage

Monitor the personnel

Monitor the visitors at the site

Maintain equipment

Check the cash flow

Check client payments

Ensure subs are paid on time

Control extra expenses

Secure conduits

Check exterior

Check foundation

Check finishes

Checklist by GanttPRO, online project planning software

based on a Gantt chart


Company name Project manager

Project name address

Project number Date

Completion and closure

Description Assigned to Date Remarks

Complete a punch list

Make final inspections

Gather all schemes, instructions,


and operation manuals

Recheck that all outcomes comply


with the terms of the contract

Pay all the fees

Discuss the service provided

Obtain a certificate of completion

Send all invoices

Check the rented equipment

Return the rented equipment

Create an internal report

Send the final budget report

Prepare all the docs for future


verification

Run the final revision of the


construction site

Checklist by GanttPRO, online project planning software

based on a Gantt chart