Uae
2013 ASME Boiler &
Pressure Vessel Code
Per uly 1, 2013
IX
Qualification Standard for
Welding, Brazing, and Fusing
Procedures; Welders; Brazers;
and Welding, Brazing, and
Fusing Operators
[ASME Boiler and Pressure Vessel Committee
on Welding, Brazing, and Fusing
chanical Engineerseof tance, 208,
‘isneratoa cde o stn was dered nr pers ceed asst tera fr Aner
an oa Suns nd isan Amro en Sar Te Sundar Cnet poet cde
Snfrd ws lnedosure it ns om opeet nd conrad ness eaten pe
Say pa The props cod ordre ws a rer pic rand commen pr
“te an open fr dns! pu pat om ody, neem reps) see, de PM
ASE dn ‘appro rte "ede ay tem contrac, propery dev fy.
ASME des ay poston wh expo ayo aes eerie inno th ny
teen ths acumen and Uw notundrate nr songs stand pn Ny
Igoe of any ate espn no tue sh aby Uses coe ar ae
Dre ered tt etrintion vay a ay ch poet ah he Hk a pment ach
Me ety Geir ovn rors
rps eer! gy eesti) or person) ted wh nds i ot sented os
serene rity enforce Sanda
SH cps espn fr thon epee acme iste in cordance withthe et
liked ASE proces ant ples whch ress te ane npn by
he nos ts deci an) se rots Aeron MoS
EQ -—-—-
‘eestor ASME aba rpc the US. Pate Ofc
“ASME ithe adeno the American Say of Meh Ege
ey ange eg Nae 90
oy te Cul fT Ameri Scey af Meh agers 191 se eon 2038
‘he American Sct of cel Egose
{wo at vem Ne Yok NY 10016559
‘acca St OF MEENA ENGINES
‘rons eerTABLE OF CONTENTS
Lie of Sections x
Foreword a
Statement of oy on the Use ofthe Certifienton Mark and Code Autharization in Advertsing ro]
Statement of Poly on the Use of ASME Marking to ently Manfactured tems a
Submit of Tecnica Ingles tothe Boller and Pressure Vestl Standards Committees "
Personnel ss
Introduction see
Summary of Changes : me
List of Changes in BC Order se
‘rate Referening and Slisic Changes inthe Bolle and Presse Vessel Code “h
Part Q6 ‘General Requirements 1
6-100 scope 1
aea09 Detnons 4
Paw Welding "
Artie 1 ‘Welding General Requirements mn
(qu-i00 Scope “
ueiz0 Weld Grentaion rn
wize ‘Tat Porons for Groove We i“
Qw.so est Postone for Flt Welds, 5
waa ‘Types and Purposes of Tests and Buaminations : 5
ws0 Tension Test 16
‘w160 Guided Tests ”
qw.i70 Notch-Toughness Teste 8
‘wi30 File Weld Tests 8
qwi90 (ther Tests and Examinations Fr
Ate Welding Procedure Qualications n
W-200 Genera 2
uz Preparation of Test Coupon 20
Qw.220 Hybrid Laser GMAW Welding 3
w-250 Wilding Variables 32
Qw-290 ‘Temper Bead Welding 7
Artie Welding Performance Qualifications ”
qu-s00 General
Qwsio (ealeaton Text Coupons %
qu-s20 Retest and Renewal of Qalicaton %
we350 WelaingVarsles for Welders 7
(uss Welding Varsles for Welding Operators *
(qwsa0 Spoil Processes 0
artide Ww Welding Data 2
‘qw400 Varables a
w-si0 Technique 2
qw-20 Base Meta Groupings 96
w-30 PNambers 166
qw-s40 Weld tat Chemical Comprison 16
‘qw-s0 Specimens 7wasa
wear
Gw-90
article
‘wsoo
awsi0
ws20
‘W530
ws40
Part 8
Article XL
‘Qp-100,
apit0
Qp.iz0
Qe40
8150
Qet60
aro
80
Article IL
8200
e210
8250
Arce XI
e300
Qes0
8320
8350
Article XIV
8-100
6-410
95-420,
5-430
paso
ap-4c0
Part QF
ticle XXt
‘gro
grtio
F120
F130
arto
tile xx,
e200
e220
250
Artie x
(e300
(geo
esa
esas
rching ~ Proceses and Reagents
redesignated a8 QG-108,
Standard Welding Procedure Spcifiations (SWPSS)
Genera
Adoption of SWPSe
Use of SWPSs Without Discrete Demonsraton
Forms
Production Use of SWPSe
Brazing
Brazing General Requirements
Scope
Brave Orientation
‘Test Poston for Lap But Scar, of Rae Joints
‘Types and Purposes of Tests and Examinations
‘Tension Teste
Golde Bend Tests
Pel Texte
Setoning Tess and Workmanship Coupons
Brazing Procedure Qualifeations «........
Genera mn
Preparation of Test Coupon
Sraning Varlbles|
Brazing Performance Qualifications
Genera
‘ualinearion exe coupons
Retest and Reneval of Qualiistion
‘rating Variables for raze and Bring Operators
Brazing Data
Varales
Technique
Peaurbers|
Plastic Fusing
Plastic Fusing General Requirements
Scope
Fised joint Oventation
Data Acquistion and Evaluation
Branations and Teta
Fusing Procedure Qualifications
ener
‘Standard Fusing Procedure Speciation ($49)
sng Variables
Plastic Fusing Performance Qualifications...
Genel
Tes
‘ype of Text aquired
ts of Qualified Poston and Damar (See Qi-4@i)
28
ns
220
230
20
a
2
22
232
232
232
23
23
2
235
238
26
26
2
28
a2
ben
23
a
a
245
240
252
m
m
m
am
am
28
29
29
29
29305
esi0
grant
F320
‘raat
ges
360
ese
Article XXIV
400
‘geo
graoz
F405
F408
F405
9F406
ora07
or-a20
450
F460
aot
e480
490
rapt
ease
using Machine Operators
(Qualfcaton Test Coupons :
Test Coupens
Retest and Rene of Qualification
Expiration and Renewal of Qualiiestion
‘sential Varables for Performance Qualction of using Machine Opera
Genera
Plastic Fusing Data
Variables
Genera
Jom :
Materia
Poston
‘Thermal Conditions
quipment
‘echniqae
Merial Groupings :
pe Fusing Lins
‘Graphics
Pestons
Genera
Defntons
Nonmandatory Appendix 8 Welding and Brazing Forms
Nonmandatory Appendix D P-Number Listing
Mandatory Appendix E Permitted SWPS5
Mandatory Appendix F Standard Unit for Use in Equations
Nonmandatory Appendix Guidance forthe Use of US. Customary and SI Units n the ASME Boiler
‘and Pressure Vessel Code
Nonmandatory Appendix H Wavelorm Controlled Welding
Mandatory Appendix] Guideline for Requesting P-Number Assigoments for Base Metals not
sted im Table QW/Q8-422
Nonmandatory Appendix K Guidance on Invoking Section 1X Requirements in Other Code, Sta
rouRes
QG-0921
6-10922
wisi i220)
Qw-asit
qweasiz
weasis
Qwasia
Qwasis
Quis
Qwesi7
guests
Qweasti0
n-462416)
dards, speciiaions, and Contract Documents
‘ypla Single and Multibead Layers
‘Type igle Bead Layers
Founded indiation Chars
Positions of Welde — Groove Weide
Potions of Welds — Flt Welds
Groove Weds in Pate — Tet Postons
‘Groote Wels in Pipe — Test Posttons
Filer Welds in Plate — Test Postons
Piles Welds in Pipe — Test Potions
Sud Weis — Test Postons
Std Wels — Welding Posting
Rotating Too! Design Characteristics (SW) Referenced in QW:I0
Tension — Reduced Secon — Pte
2
290
230
200
200
200
200
220
ae
2a
2a
2a
21
2a
ee
bee
282
299
293
203
205
306
a
a7
38
ry
a
a
13
ie
185
185
186
187
188
188
190qw-23(0)
awesattes
uaszi1a)
waste)
wen
462318)
w-46230)
w4624ta)
‘w-46240)
‘Qw4624(0)
qw-aezac)
(QW-452510)
qw-46250)
ueaszste)
w-4625(6)
Qw4625(6)
wesca7a
waa?
w.46073
Qw6281
wasn
Qw-a629
Qwessni2
Qwe6213
fweaes.1a)
netea)
aw-sa1(6)
‘we3tt@)
weeatte)
was.)
(questa)
‘aw3206)
w-46a2t0)
‘awas3.ata)
was3.ate)
weaaare
w-3.2i6)
‘w3.200)
Qweaser
qwase2
(ws
(562
(563
ase
wae
w565
quasar
qwsn2
east
esi2
eas)
“Tension — Reduced Seton — Pipe
“Tension — Reduced Seton Aerator Pipe a
“Tension — Reduced Seton — Turned Specens|
‘Tension — Fl Section ~ Smal Dsmeter Pipe
Sie Bend sovcesss . :
Face and Root Bends Transverse
Face and Root ends — Longin
Filet Walden Plate — Procedure
Filet Welds in Plate — Peformance
let Welds in Pipe — Peformance
Filet Welds in Pipe — Procedure
(Chemie alysis and Hardness Specnen Corrosion Resistant and iar. Faing Wald
‘Metal Overlay
(ceria Analysis Specimen, Hard-Facng Overy Hardness, and Macro Test Location
(foe Corrosion Resistant and Hard-Facing Weld Metal Overlay
Pipe Ben Specimen ~ Corrosion Resstant Wl Metal Overlay
Pte Bend Specimens — Corrosion Resistant Weld Netal Overlay
Pate Macro, Hardness and Chemial Analysis Specimens — Corrsion-Resistant and
ara-Facing Weld Metal Overlay
Resistance Seam Weld Test Gaupon
‘Sram Weld Secon Specimen Rernoval
Resistance Weld Nugget Section Test Specinens
Spot Welds in Shoes
‘Stam Weld Peel Test Specimen and Meo
Spot Welds in sheet
Nomenclature fo Temper Bead Welding : :
Measurement of Terper Bead Ovep
ates ~ bess Than in (19 mm) Thickness Procedore Guaiestion
Prats — Yin (19min) and Over Thickness and ARternate From fn 10) but
as Than Yn (19 mn} Thickness Procedure Guaifeation
Pats — Lanpteinal Procedure Quien.
Procere Qslfetion :
Procere Qualfetion
Note Toughnest Test Specimen Lacton
Plates — Less Than Yin (19 min) Thine Performance Qualification
Plates — Yin (19 min) and Over Thickness and Alternat Pow Yh (10 sn but
ass Than Jn (19 moe) Thickness Performance Qualiition
Pats — LangtinlPertormance Qualification
Performance Qualification
erformance Qualfeton
Pie NPS 10 (ON 250) Asura Performance Qualification :
[NPS 6 (DN 150) or NPS 8 (ON 200) Assembly Performance Qualification
Performance Qulifeaton
roedure Qualification Test Coupon and Test Specimen
Peformance Qualiletion Test Coupons and Tex: Specimens
‘est ig Dimensions.
Guided end Rl fg
Guidedend wrap Around ig
StudWeld Bend ig
Torque Testing Arangement for Stud Wels
Sugpested Type Tensile Tes igre fr Stud Wilds
But Joint
‘ternative Bu one : :
Flow Postons :
‘Tes Flow Posione
Tension — Reduced Seton fer But and Scart oats Plate
1
12
12
1
196
197
197
198
29
200
a
203
204
204
205
206
2
an
22
20
a2
an
aa
216
216
a7
27
28
29
no
m
mm
ns
ba
bs
26
ar
ar
arB-46210)
8462100)
gB-a621(6)
Qpa621()
4622(9
e6-463118)
(0)
a4622(9)
465200)
8463216
“Tension — Reced Seton fr But Lap, an Serf Joints — Pipe
‘Tension — Redced Seton for Lap and Rabbet fins — Pate
Tension — Fal Section for Lap, Sar, and xt Jlnts — Smal Diameter Pipe
Support Faure for Rediced Season Tension Specimens
‘ranoverse First and Seond Surface Bends — Plate and Pipe
Longitudinal First and Sacond Surface Bends — Pate
{ap Jn Pea Specimen
Lap Jot Seton Specimen ce 05-181)
‘Workmanship Coupons
Plater Procedare Qualfcaion
Plates Procedare Qualifeaton
Pats Procedre Qualieaton
Pats Procedure Qualifeaton
Pipe — Procedure Qulifation
Plates Performance Qualiaton
Plats Performance Qualifeation
pe Performance Qualification
(Guided-Bend ig
Guided Bend Rl ig
Guide Bend Wrap Around fig
Required Hinimam Melt Beed Sie
sing Positions
sing Test Psions
(rose Section of Upset Beads for Be Fed PE Pipe
‘Bend Tet Sporinen Removal, Configuration, and Testing
LHSTT Specimen Configuration and Dimensions
HSTTT Specimen Faure Examples
Wilding Varales Procedure Spectications (WPS) — Oryful Gas Welding (OFW)
Wilding Varales Procedure Speciextons (WS) — Oryful Gas Weng (OFW)
‘Wilding Variables Procedure Specifications (WPS) ~ Shielded Meta-Are Welding (SMAW)
‘Welding Varbles Procedure Specifications (WPS) — Shielded Metal-Ae Welding (SMAW)
WelangVarisbles Procedure Specfstions (WPS) — Ssbmerged-Are Weng (SAW)
Welaing Variables Procedure Sections (WPS) — Sahmerged-Are Welding (SAW)
Welding Varbls Procedure Speiiitons (WPS) — Gae Meta-Ae Welding (GMAW and
FeAW)
Welding Variables Procedar Speciatons (WPS) — Gas Meta Welding (GMAW and
caw) :
Welding Vatiales Procedure Spctiaions (WPS) — Gas Tagsten-Are Welding (¢TAW)
‘Welding Varoles Procedure Specifications (WPS) — Gas Tungsten Are Welding (ETAW)
Wilding Variables Procedure Speciation (WPS) — Plasma-re Welding (PAW)
‘Wilding Variables Procedare Speciation (WPS) — Plasma-Ae Welding (PAW)
‘Wielding Variables Procedure Speciestion (WPS) — Elecveslag Weng (ESW)
‘Welding Variables Procedure Specifestion (WPS) — Elecvslag Weng (SW)
Welaing Variables Procedure Specifestons (WPS) — Electrogas Welding (FGM)
‘Welding Variables Procedure Speiestons (WPS) — flecran Beam Welding (BV)
Welding Variables Procedure Specifintons(WPs) — Stud Welding
Welding Variable Procedure Specifications (WPS) ~ Inert and Continuous Drive Friction
Welding
Welding Varisies Procedure Spcticatons (WPS) —~ Reatance Welding
Welding Variables Procedure Spctiations (WPS) — Laser Seam Welding (8)
Wielding Varales Procedure Speciation (WPS) — Laser Beam Welding (8)
Welding Variables Procedure Speation (WPS) — Pash Welling
Wilding Variables Procedure Speciation (WPS) — Difuson Welding (OF)
‘Welding Variables Procedure Speciations — Friction Str Welding (FSW)
255
256
257
250
259
259
263
268
265
266
28
268
269
a0
2
26ws
W269
(QW-2601
u.2904
qu.ase
W353
was
w.355
Qw.3s6
was?
Qwsie
aw op-s22
was
iia
Qwest
Questa
Quasi
Questa
esata)
(wes2105)
wes23
wasza
wases
wasz6
Wass
gwssi9
iietca.z00)
‘Qietsa20tb)
uets2.0(6)
wea7s31
e252
6255
o25e
255
6256
8257
ease
psi
e512
64513
e454
64515
ease
gease2
geaee2
e222
ease
F882
r22
(gras23
Fors
‘F482
(F483
Welding Variables Procedure Speciation (WPS) — lyri Laser GMAW.
Welding Varbles Procedure Speciation (WPS) — lyri Pasma-CMAW
Welding Varable Procedure Speciation (WPS) — Hybrid Plasma. MAW
Welding Varable for Temper Bead Procedure Quslfeston ss ses.
Ory! Gas Welding (OF)
Shied Metal Are Weaing (SMAW)
Semiautomatic Submerged Welding SAW)
Seminstomate Gas Metal Arc Welding (CMAN)
Manual apd Semiautomatic Gas Tungsten-Are Welding (FAW)
Manan and Sematomatc Past Are Welding (PAW)
Welding Varbles
Ferrous/Nonferrous P-Numbers
Numbers
‘aNuttbers
(Groove-Weld Tension Tests and Transverse end Tate
(Groove Weld Tension Tests and Longitudinal Bend Teste
Fle Weld Teste
Filet Wells Qualified by Groove Weld Tests
‘Thickness of Weld Metal Qualified
Groove:eld ameter Lins
Small Diameter Flt Weld Test
File Weld Test,
Filet Qualfcaton by Groovecld ests
Procedure/Prformance Qualifestion Thine Limite and Tex Specimens for Har Facing
(Wear Resistant) and Corrosion Resistant Overy
Performance Qualieston — Postion and Diameter Limiatons :
‘Bear Seng Requires for Spat ov Prfetns Weld Sprints.
‘Shea Strength Requirements for Spot or Projection Weld Specimens
‘Shear Srength Requirements fr Spo or Projection Weld Specmens
Makeup of €quaons for Aqua Regia snd Lept' Exeh
‘Torch Brain (7)
Furnace Brazing (3)
Indueson Brazing 1)
Resistance frazng (RE)
Dip Brazing — Sat or Fx Bath (D8)
Dip Brazing — Molten Meta Bath (08)
Numbers
‘Tension Tess and Transverse end Teste — But and Sc Joins
‘Tension Tests and Longitudinal Bend Tests — Butt and Sar its —
‘Tenston Test and Pel Tests — LAP Jone :
‘Tenslon Tests and Section Tests — Rabe ins
Section Tests — Workmanship Capon Joins
Peel or Section Tests Blt, eat Lap, Rabbet joins =
Sten Tests — Workmanship Specimen Joints v=.
“Testing Speed Requirements :
Maximum Heater Pate Removal Time fr Pipes Pipe Fs
Fusing Variables Procedure Spciestion
‘Essel Variables Appcble to sing Michie Opertors
Pipe Fusing Diameter Limi
Standard Units for Use in Equons|
2a
282
a7
209
290483
rs
ges
(eas
(ies
wets
weds
waa
B48
8-483
8-484
npex
23
6
8
ao
an.
a0
304
305
26LIST OF SECTIONS
sections
1 ules for Construction of Power oles
Mater
1 Pave A— Ferrous Material Specifications
+ Pare — Nonferrous Materia Specifetons
+ Pare C— Speaftons for Welding Rodi Electrodes, ond ler Metals
+ Pare — Properties (Customary)
1 Pare — Properties (Neti)
IW Rules for Construction of Nuclear Facity Components
+ Sisecon NCA — General Requirement for Disson 3 and Divison 2
+ Appendices
+ Divain 1
~Subsation NB — Clas 1 Components
Subsetion NC-— Cast 2 Componente
Subssetion ND — Clas 3 Components
Subsection NE — Glee MC Components
= Subseton NF — Supports
= Subsston NG — Core Support Stuctures
« Subsacton NH — Gass 1 Components in Elevated Temperature Service
+ Divison 2 Code for Concrete Containment
+ Division 3 — Containment for Transporation and Storage of Spet Nuclear Fusl and High Level Raioatve
Material and Waste
+ Diison §— High Temperature Reactors
1 Rules for Construction of Heating Bates
Nondestructive Examination
1 Recommended Rules fo the Care and Operstion of Heating Bolles
Recommended Goines forthe Care of Power Baers
VIL Rules for Construction of Pressure Vessels
+ Driston 1
+ Division 2 — Aernative les
* Division 3 — Alternative Rules for Construction of High Pressure Vessels
IK Welding Brazing and Fusing Qusicstions
X her eoforced Plate Pressure Vessels
XI Rules for Iservie Inspection of Nuclear Power Plant Components
XL Rules fr Construction and Cominued Servic f eanspore TanksINTERPRETATIONS.
ASME issues writen ples to fnglries concerning iterpretation of tech aspacts ofthe Cade
Interpretations ofthe Code are posted in anary an july at tp estos aster inerpretations, Ray nterpre
tations Issued daring the previous to clendr eas ar nluded with the publication ofthe applicable Section a the
Code Interpretations of ection Il isslons 1 apd 2 and Section I Appendices are included with Subsection NCA.
‘CODE CASES
‘The Bier and Pressure Vessel Cade comumitees meet repularly to consider proposed ations and revisions tthe
‘code ant formulate Cses to ary the intent of exiting equizements or provide when the need Ls urgent ales
for maar constructions not covered by existing Code rules. Thase Cass that have been adopted wil appear in
the appropriate 2013 Code Cases book "Ballers and Pressure Vessels of "Nuclear Component Supplements wil be
Sent automaticaly to the purchasers ofthe Code Cases books upto the publleaton ofthe 2015 Codeoo FOREWORD
(This Foreword s provided a an id tothe utr an is ot part of the uf this Code)
‘In 1911, The American Society of Mechanical Engineers extalithed the Boller and Pressure Vessel Commie to For-
mult standard rales forthe onstruction af stam blr and other presse vessels. 2009, the Ber nd Presse
‘Vessel Commie was superseded by the tallowing committees
(a) Commtes on Power Boers (0)
(Committee on Marerals (0)
(6) Commitee on Consteuctin of Nuclear Facity Components (I)
(4) Commitae on Heng oiers (WV)
(6) Commttes on Nondestructive Examination (V)
(Commitee on Pressare Ves (Vl
(@) Commitee on Welding Brazing and Fusing OX)
(0) commutes on Fiber Reinforced Plast Prescure Vesa (X)
(0 Commitee on Nucear Inservice Inspection (0)
(Commitee on Transport Tanks ()
Where reference is mae othe Comite" in hs Foreword, each ofthese commits included indivi and
caletvey
‘Tho Commits fanetian fo extbloh ral of safety relating only to pratture integrity whlch govern the
‘onstruction of ler, pessre ves transport tanks, nd nleatcompnent andthe nerve nspeson of
lear component and transport tanks: The Comite alo lnteprets these rules when questions arse regarding their
Invent This Code doesnot address other safety sues eating to the construction of boiler pressure vestlstraepor
‘tanks, of nudear components, othe ieee inspection af clear components or transpor tank, Users of the Coe
Should refer tote pertinent odes, standards ts regulations o other relevant document ref sues ther than
those rating o pressure neg. Brept for Sections XI and Xan wth a few othe exceptions the ules do oto
practical necessity refect the eno and consequences of deterioration in rie related to specif service sor
‘sternal operating eneronments In formulating the rls, he Commitee conser the needs of ser manufacturers
and inspectors of pressure vessel The abjective af he rules isto afford reasonably certaln protection of life and prop
‘ry. and to provide a margin for deteroran in seve to give a easnably lon sae pero of sels. Avene
‘ent indesign and matrals and evidence of experience have been recognized,
‘This Code contains mandatory requirements specific prohibitions and nonmandatory guidance for construction at
‘ts and inservice inspection and esting activites. The Code dows not adres all aspets ofthese setvies and those
aspect that ae not spall addressed should na be considered probe, The Codes not handbook ad cannot
"place education experienc, and th use of engineering Judgnent The phase engineering spent ees ttechncal
Judgments made by inowledgeabeenginers experienced inthe aplication ote Code Enginsering judgments mst be
onsistent with Code pisophy, and such jadgmens must ever beused to overrule mandatory regiments or specie
roibions ofthe Code
‘The Commitee reognze that tls and techniques use for design and analy change as technology progresses and
‘apes engineers to use good jagment inthe appestion of tes tons. Te designers responsible fo comping wth
ode ules and demonstrating compliznce with Code equations when such equatons are mandatory The Code nether
requires nor prohibits the use of computers forthe design or analysis of cmponentsconstracted fo the equrements
the Code However, designers and engineers using computer programs for design or analy ar autoned tha hey
are responsible ral technical assumptions inerent i the program they use and the appleaton ofthese progr 2
thei deste,
Gita nt Foren sa nie term comeing mer sg cn. waitin peo ing‘The eules established bythe Commitee are nt to be interpreted as aproving recommending or endorsing ay po-
pricy or spect esi. o as lng n any way the manafctarer’eedmo choose any tethod wf design or any
orm of construction that conforms tothe Coe rules.
“The Cormitee meets rou to consigerreisons ofthe rules, new rules as dictated by technological development.
coe Cases and request for interpretations Only the Commitee has the authority to provide ofa interpretations of
th Code Requests for revisions new rales, Code Cases or interpretations shal be addressed tothe Secretary in wring
dsl gi fl pacts ode to resi onsderton and ation (ee Submital of Tecnlal Ingres tothe
‘Baler and Pressure Vese Standards Commies), Proposnd revisions to the Cade resulting from Ingres wil be pre
ened to the Commitee for aproprate action The acton ofthe Committe becomes efecive only afer confirmation by
‘hall ofthe Committe and approvalby ASME. Proposed revisions othe Cade approved bythe Committe ae submited
to th American National Sard Inttte (ANGI and published 3 tp estoolsasme org/esconnect/publi/in-
ttxefntPublctevew-Revisions to vite comments fom Interested persons. After public review nd nal approval
bor ASME, revsone ae published at regular ineral in Ens ofthe Code
‘The Commitee does ot rule on whether a component shall or shall mot be constructed tothe provisions ofthe Code
‘Te scope of eth Seton has been established a en the components and parameters considered bythe Commitee
In formulating the Coe res,
‘Quesons asus rearing compliance of specif component withthe Code rules ae to be directed tothe ASME
‘erent Hlder (Manuactarer). nguirie concerning the interpretation ofthe Code are tobe dete tothe Commit
tee ASHE sto be noted shoul questions arse concerning improper se ofan ASME Cerifstion Mark.
When rquted by conte inthis Section the sngla shal be interpreted as tho plural and vce vers, and he fem:
Inne mascalne, or neuter ender sal be treated a such other gender a appropriate,STATEMENT OF POLICY ON THE USE OF THE CERTIFICATION
MARK AND CODE AUTHORIZATION IN ADVERTISING
ASME has established procedures to authorize qualified organizations to peor various activites in acordance with
the equrrients ofthe ASME Baler and Pressure Vesa Code el the smo the Society to provi recognition of or
‘ation so authorize, An organization holding authoraton to perform various actives nscordance wth her
"urements of the Code may sate this api inte advertising Iterature
(Organizations hat ae authored ous he Crtfcation Mark for marking ems or constructions tht hav ben on
stricted and inspected in compliance withthe ASME Boller abd Pessare Vessel Code ae sued Cette of Author.
zation. Its the alm ofthe Society to maint the standing of the Cereiestion Mark for the bene ofthe users the
enforcement arson andthe holders ofthe Certaton Mark who comp with all equrements
Based on thse objectives, the following polly hasbeen established on the usage in advertising of facsimies ofthe
Certieaton Mark, Certificates Authorization and relerence Cade contrcton, The American Set of Mechanical
Engineers doesnot “approve” eat rats ot “endorse” ay tem contro, rats tere shall bo sake
ents or plications that might so indcate An organization holding the Cetication Wark and/or a Certcate of
“Authorization may state In adverdsing Uteratre tht items, constrictions, o actives are bul (produced or Pet
formed) o activites conducted in accordance with the equtements ofthe ASME Boller and Pressure Vessel Cae>
or "meet the requirements ofthe ASME Baler and Pressure Vesel Code” An ASME corporat logo shall not be used
by any organization other han ASME
‘The Creation Mark shall be usd only for stamping and nameplates a specially provided inthe Code. However
‘seis may be sed for the purpose of fostering the we of such coastrton, Such usage may bey ah association or
society or by a olde of the Cerifeaton Mark who may also use the lacs in advercsing Co show that cary
spied items wl carry the Certieation Mark. General usages permite en when al of manulctres tems
Sr constricted under the aes,
STATEMENT OF POLICY ON THE USE OF ASME MARKING TO
IDENTIFY MANUFACTURED ITEMS
‘The ASME Bolle and Presure Vessel Code provides rules forthe construction of bles, pressure vessels and nuclear
components This laeludes requirements for materi, desig fabrication examination inspection and stamping ems
onstructed in accordance wih ll ofthe appable rules ofthe Coe are Wentfied with the ofa Cerifeation Mark
‘escrbed in the governing Section ofthe Cade.
‘Marking such as"ASME: ASME Standard or any other marking icing ASME" ofthe Certification Mark shall ot
be used on any item that is ot contacted in accordance with al of the apleble requiem nto the Code
tems shall not be deserved on ASME Data Report Forms nor on ilar forms referring to ASME tat ted imply that
all Cade requirements have Been met when, i fa, they hare not been Data Report Forms coven items net fall
fomplying with ASME reqlremens shoud ot refer t ASME or they should lly dental excepons tothe ASME
requirements«) SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER AND
PRESSURE VESSEL STANDARDS COMMITTEES
1 INTRODUCTION
{) The fatiowing information provides gutance a Coe wer for submating technical inquires tothe commits See
‘uldeine on he Approtal of New Materials Under the ASME Boer and Pressure Vessel Coden Section Parts Cand D
for addonl requirements or request nvoving ding new materialsto the Code Techn nquines incu requests
for revision radios to the Code rales routs for Cd Cases, and requests for Cove Interpretations, as described
‘lowe
1) Cade Revisions Coe revisions are considered to accommodate tehnaagcl developments, ress administra:
tive fequrements incorporate Cade Cases oro lan Ce tent
(2) Code Coes Code Cases represent sternatives or addons to existing Code rules, Code Casts are writen as 2
question and reply and ae sully intended to be Icorporated into the Code at late date When wed, Cd Cases
preseribe mandatory requirements in he same sense ar the text ofthe Code. However, users ae cautioned tht not
[i jredons or owners automaticaly accept Code Cares, The most commen appiations fr Code Cases are:
(4) to pert early implementation of an approved Code revision ised on an urgent need
(6) to permit the use of «new material or Code construction
(6) toeain experience with new materials or alterativ rules prio o incorporation recy ito the Code
(3) Cove nzerpretations Code laterpettons provide dariaton ofthe moaning of exiting rules inthe Code, ant
aro aso presente In question and reply fora lterpretations donot introduce new eequrements. In cases where
‘Tsang ete doesn ly corey te weaing tet wes intended and revision af he rare requted to support
Sm intrprettion anit lterpeetation wil be sued and the Code wil be revised.
(0) The Code rules, Code Cases, and Coe Interpretations established by the eommatees are not be considered as
approving recommending crying or endorsing any proprietary or specie desig ora iting in any way the fee
loot manulcturers constructor or owners to chaos any method of design or any frm oconstructon tat conforms
to the Cade rales.
6) ngues that do not comply wit these provisions or that do nat provide suicent information for a commitee's
ful understanding may esl nthe request Being eturmed to the Inquier with no action.
2. INQUIRY FORMAT
Submitals oa commie shall inde:
(a) Purpose. Spc oe ofthe flowing
{A evson of preset Code ues
‘new or addins Coe rules
(2) Cove case
(6) Coe interpretation
(0) Background. Frovdethe formation needed forthe committee's understanding ofthe inquiry being sure to
Inde eerence tothe alae Code Seton, Division, Editon, Aen (i appleabl), paragraphs, Hise, and
tables, Prefraly, provide a copy ofthe specie referenced portions ofthe Code
{Presentations Te ingier may esr or asked to attend a mocting ofthe commit to maka formal presets
sion orto answer questions rom the comme mamers with regard tothe nguy. Attendance ata committee meting
Shale at the expan ofthe ingirer The ngulre’s atendanceo kof atendance ata mectng shall ot be 3 basis or
[teptane or rie ofthe Ingy by the committee3 CODE REVISIONS OR ADDITIONS
Requests for Code revisions or additions shall provide the fllowing
() Proposed Revsionor Advan For resins, dent he rales ofthe Code that equire revision and subi copy
of the appropriate rues a they appear inthe Cade, marked wih the propsed ces, For adatons, provide te
Fecommended wording elerenced to the exiting Cade rues.
(0) Staton of Need. Provide bi explanation ofthe need forth reson oF ation
{Background information. Provide background information to support the eison adn tcuding any data or
‘changes in technology that form the bass forthe request tht wil allow the committee to adequately wvalvate the
proposed revision oration Sketches, ables, igure, and graphs should be submited appropriate When applicable,
entity any pertinent paragraph inthe Code that would beafted bythe revision or aden an dently paragraphs in
the Code that reference the paragraps that are tbe revised or added.
4 CODE CASES
Requests for Code Casts shal provide a Statement of Nod and Background Information simlrto tht defined 3(0)
and fo) respectively for Code revisions or addons The gency ofthe Code Case (eg, poet undervey ox iment
‘now procedure etc) mustbe defined and mast be confrmed thatthe request connection with equlpnent tat wi
‘bea the Cerestion Mark with the exeetion of Seton X aplcations. The proposed Cade Case shoud ently the
Code ection and Divison. and be writen a Question and a fepy in the sme frmata ening Code Cases Regis
for Code Cases should ls ini the appiabe Code Edons and Addenda (applicable) to which the proposed Code
(ase applies.
5. CODE INTERPRETATIONS
(o) Requests for Cote Interpretations sal provide the flowing
(2) Inqury. rovde 2 condensed and pecse question, omiting serfs backround information an when pos-
ila compere in sucha way thay ran py ah bel prose eee east Te quod
be tcincaly and eatoralycorect
(2) Reply. Provide proposed Reply that wil erty and concisely answer the Inguryqueston Preferably, the Rep
should be "yee or 00: wth bit prove if nested,
(3) Background ormacon Provide ay background information tht wil sit the committe in understanding
the proposed Inguiy and Rep.
(0) Requests or Code Interpretations must be lnited oan interpretation a parclrruiement nthe Cade oF a
Coe Case. The committe cannot conser contig fe request the following,
(2) a review of cautions design drawings, welling qulicatons,o descriptions of qupment or prs to deter
mine complince with Code reuiemets
{@) request for aesistance in performing any Code prescribed functions relating ut ot ined to, tral se
econ, designs eleulatons, fabrication, inspection, pressure testing, or isallation
(G9) a eequst seeking the rationale for Code requitements,
6 SUBMITTALS
Submits to and responses fom the comutees shal mest the following
(@) Submit Inquires rom Code users shall es English and preferably be subeted in typewrten form; however,
lege Randwriten ngs wil als be considered. Tey shall cade the name, des, telephone umber, fax Mut
be and ermal adress, avalable, of the inguiver and be mad othe following address
ASME Boiler and Pressure Vessel Commitee
Two Park Avene
Neve Yor, NY 100165990
‘Asan atemative, inquires may be submitted ia email to: Secretary BPV@asn or
(0) Response. The Secretary ofthe appropriate commie shal acknowledge receipt of each properly prepared ingly
and shall provide a writen response tthe inguter pon completion of te requested ation bythe commie)
PERSONNEL
ASME Boiler and Pressure Vessel Standards Committees,
Subgroups, and Working Groups
ny 20
ome te seer eer some cmmneacion
ete nemeige
ume, a. ENE ety Sipe
Ee Sar
om iS
BS a
= in
ie i
ononany MEMBERS (4 COMDTTE)
Re fan
Linas a oe
EES emen LE
ae a
ete nom Eo‘amin sae
Beek a ry Heer
Nene bmn oy er
acon Bran ce eer
At Cena cet
sa eete 1m onthe Herder
brace ‘haw cong nr
aes opm coy hee
hese Pricemeanrentoed
Eee Sararat noma
Debt 1 Seay tan Mr
‘one o rows noms (er)
Remamiie sce Pie
Soumatrieny Ya
eReton, RO sn
ho shade Fam
Stic pei age
Ther ‘ita tga
1S tee 2 eo wy Membr
‘sean Deen (291
Eten Sey DAC
rege here Cert Mame
Suto on Fabrtin Eaton)
te See teh
outa eehaapan
ee Rec
nese ins
urn rages (8)
TE te ea
Pieter
‘Sibu at Recovery Som Genet (2¥ 1)
Heme | yuet
= cog
aes aoe
Stern on Lecomte Boers 1)
Lae Cte
a"
Chm a
ise wae
eeepc ae 80
fee ee
Enemy Picea
some te 8
gino oo
A Byers Wolo
peg a
hear vou
Sh ane‘Tah coupon Moderion BPE Seton
ugar nema
hammer, | te
ee te
comer ono
a
im
oe RE
ier eae
= oe
rd aoe
ws i
ne we rete
ee Se
Sm HSEESo
steve
emo
[eee ye
bce Marr, Gn Meer
is germans
‘saben on Fron Spon (8M)
Hy i
te i
Et ae
ae Sh
Pied Eee
oo Ee aaa
thes =
‘Srp mental ter Specthatons (BYE)
perited wo ay
Tea oy pane
Sv. cer Ro siucer
Ae ey 1 a gate
Sn Natron hy (8)
ete ‘ten
bom Ete
Nt ctier Neg
Peon hee
the ae cue
Sia ear
ny wb ome
Tete tone
soup yea Propet (BP)
oan Eee
sw Songhua (2 1)
octane "ki
teh Sir Sy nem
jan ested
een gti crag
Ve ‘toner
Pee rt ns Moar
sian Seng of Wedment(BFY A PY
fen penne
now 1 P, Sieny Fe
Worn Croup Mati aaa (91
Ne sae eee
ae 1 tt Cea Met
Fitoase Ne ei tr
ed tReet ttene =
ee if
iS =
i iE
‘conrowe 9
pene, st
sce,
EES views
cies asl
bom {ether
pose a.
eek HA ae
i teen
eteaaa’ eee ee
_Segrup 0 Cantament Sites Spent Fl and gh ee
‘Waste osporPeapg (Ym)
ne REY
ine
‘Sgro Component Des (BP)
ease ehmeis
em A
free eine
Stic Porson
vo eed
ay keine
orig croup on Suppor (5098 1)
mae tr A Nore
Cinders Sey — a
ear 1 Sn
Es Cnr
en po ae Spor Sractarer 6-0) (BV)
Fg se
bat Pint fm Ment
Worn rtp o Den Meet (5.0) FY)
pro ndaanaa er
Himes,
AT feria phew
aa ee
i. TEL emmee
eee eae
ee Sceeeerercae
seen ate
ama
Seed a
tee SE emer
ite Seemerenelworn rp 08 png) (HV
at chr me
Eats Eton
Lie AN hm
peau an
tite eee
Sin ‘ia ay ne
Vora %1Sah conn Mba
ve Eee Ronn eer
rng rp o roi Matas a Des) (YH
meee aie
Soke Dr cc ater
Working rope ape 5) Ym
Batata ar eae
creme Sta
Noe Rito
Me Poe
worn rnp on ae) (BY
|: algan Sern Ke nad tT
ir inser
ekg rp on ate (80) (2
sie ety bie
ENS oe
weiter en
tetas ims
spc Warn rp on arometl Eas (80) (BP
Wy ce Lene
fen M2 em
tei Tia dg
oe om Gel Ramen (BV HA 36)
Smee, ge
ee a
ed Heer
itiece ie
Ekta Feit ee
Weng ron ute and Response) (PY)
ewer KAR
D Roam
Ssansane
ieee staad
=— on,
fei feed
Spc org en om Retry Inert (8 1
Sia semeny Rasen
Sg on Matera aban nd anton (YH)
tana en Fats
shows Ron
Sheree Wits
tance Pes
heer bE Sent
Seengt Sore
cere Hed aleSrey on Prem all (PY
wg
‘ect Cmmit on Stead ret Meee
er Ornone tan)
tana rs
sera Ey
feel Hee
in nteratonl Waking Grp (Y)
EAS
Fae
whe
sae tration Working rw BPI)
A a
im ea
ney ee
Tears ae
Bg Ea
Spi Were roo New Avene Lh ter ear Fat
‘Sm nes PY)
a Sona Dwsaaty
wee Tht cone Member
‘Sshrup o ng on Rew (Yt)
hier 10,Seenen
‘seeroup 0 Managment eure (2)
itn Lie
tahoe nwer
eer Reber
Westin Crapo ean Meetgs (8)
HiSm, EES
sneer
nes ns
iS oe
HS ier
co EeWorking rp Retrch and Deropmet
nla ar Kus
Shee Stine
tac ern
pore sai
Bae Nira
Ramen ig
Nae Ub Pee str
Westin Cowon Neder amino an Pan OPE
was
emer
Be tee
oe Po
i ae
Worn ou on Hh emperor (8
ene ce Ratt
‘sreap orp ae Components (Yt)
fae, hoe
i i.
ie ir
Ameo Re hemi
Pens DB Wesnay
‘sap son sere Des (BV)
ws Oe sm
Diep omer
Ek icme om
sina gh Temperate Resor (YB)
Koen” Peel”
ekg rp on ih Temper gd add Rater (PY
‘i
aa Ae
ie en
ESS, come
Ss si
ens ant pnt ty
Tabet Glee
Working rope Meh Tomprtr Fw Enso (BF 1)
ekg pon Awa Son tr (BH)
worn roy 0 nat Hed (B11)
eae Cie ‘stmt
Ne DivineWehing upon mp ate ad Ngee PY
son Fog Seng (9)
Otel oar satan
veer tamer
Behe Eten
Worn rap 0 roma Ft ration Mes
eat
os i
i ed
ieee wren
‘sebommite on Bg (YH)
EL hang Sees EA Monty
peel WeDo
few en
nee Tear
Utne be
Seca ech Crop 2 HOPE es Component (VB)
Tite osm
Sec wea
omen fie
Spec Wort en on Compr odin api
Salen
eponoe ern
= co
siggy ete Tempera ostrtion Pt)
se pan on Ltr
heey Sm
Teen ure
Steam on ener eon (F¥ 1)
‘pon Saree Ch me
Tee Dy
sangre
om a as comurr on canceeT comPORDES FOR
‘can so (oP 3).
comes
oc on
ey ESZeremvamee
oy ikon
he 1S ety te
ne eee
nes =
i eee
pes “Lae
eto bt 139
oe Si
ao Je
ee sii
vee ooecmae
ie 1 ty
Worn Grow on Mtr Fb an rman PY 20)
teste Frese
Ae omen
hing po Mornin 3)
Se Loy
hot wat‘anorree on Hearne BOUERS BP my
cate ‘heros
bre ee
som rei
pe perce
J 2 arb
Btn Fen
he rme ny tae
either 0 gf ry
Sup on Crean Operation of Heigl (BP 1)
‘strony on arm Bes FU)
Tm bom SO aa
sebeap on Matera (N)
Vestn Eime
Pion
subgroup on Water Hees (BV)
tnt emi nacre
Peta Beat
‘group Welded oes (BP 8)
stmt om Paste
hit Ey Wels
einem 9 ire mbt Mtr
‘cones o¥ NonDesrTIE EXANATION (BV)
Pema wena
Secmmtentsarsertoy Moter
ei stece ey
Lhe GG se
a epee dngae
heey (OF intn Ny ae
Eto Post nary tor
twine ‘Pesan, rey ener
Soar on Cre Huan fern! uations
“teste (|
Sai CW tae
Ct Foie
cd Ete cart
_sahoup on Sriae Bam Met (BP)
res ra
foe a
Rasa i
en
a ne
is 4
i. oe
Aas ee
Peay Fase
ee, ieee
Working rap 0 es nin (6) (BP)
Sen he ir wie
Wat rp on Radorghy SAN) (HY
STi Norte
Tete pouteWestin row rnc (6) (BP)
KAP ie Ww ke
[i che out
Oran ABM
Sia Fy se
Worn ou on ied Was aon Teng (0 (HV
men cae Gove
Pete hee sen
Die Pe
Fenty sey
Same Teer
omrre on rasssine Wess)
Unie were
Ri er ote
Sitcscsefserey Cte
Titeiee Soren Een
tee Sen
Let Brenan
ce mee
rea ‘eae me
‘cern oma de
een Nee ene te
Seas Shue
trier 2 rs De
Hit ‘ee any star
rn 0 gn (9)
Ri ber Sem
[ede meee Eb Ray
toe ery ses"
repo ape
fen thn ge
eto eho
ie ‘cee
tina Ein cremt
ioe 1. Coranng Nene
pia ‘cha rant
ong rope Des aa (YN)
Fino Sete Sane
Ae ten chase
Sitlionay Eten
‘spo Feat on pectin (9)
0 Rte Oe
Pt Sl
Opa ager
be ee
Bn arepung Membr
pt coreg set
WS ee ter
ce cng Mener
Stn on Cee Reeremens (BP Vi)
eres
hist ter
ioe tesco
tre a
Leen cas
ere hice te
iw peat be
soon 020 (8D
st tain Re ets
‘Sehoup on Hen Taser Epon (8)
Eines reece SMa
Koma
Aico
waa pg
SMa Caron one
53 ec Rory MrSato oni rare Ves
Eton er hr Eh weg
AP hak Sperwany E.R
tek eg
Ehime Eom
er {oma age
reece Rats Sone
Teter ener
eto tr ty or
ao ie ey ee
Sot on Matera
Fearon rx Epes
bcwmetchSoruwy
Aommene yams aie
inner Eee cron
sate a anette
Daina! Mme
‘soup Toh (U4 9
1 eye ee
[ma
Spi Waring Goa om Rte Fang it BEY)
ean etme
Shere mer
"wa oa Dein BU ED
iced
ak cap on Mate
pn
tae) hee
“at croup mp ane Vert (YY)
i
ee pe
He oe
fag inicio
conrrEE OF WHLDING RANG, AND SHE (BP
Beet, SES
ieee, BS
Lt Ee.
is ci
ro Heme
a iene
no oes
= ia
nese 8
yemeee tere
rs Hote
subgroup era Reems BP)
eee EW Wont
AS Nee Baneaera 4
Ne ce
Wise
SU Seo
Pesan
vc, nae
soup Ferormnce ufctn(9¥ 5)
sss
a roe
owe nt
nee
ios S=
fed fa
ilies =
sugreup o Procdere Queen BP 8)
steers Engen
sen tee wpe
1 to SA Spee
Win Pear
Tene Pert
as
on The
2EEeCramy Hee
aa ee
is i
eS i
Hem, ite
‘ona O¥ NHCEAR SEO MSPETION (A
Even nace FEDS
EiSctaricmey Eto
Besse ahem
can rhe.
Hae sewn
Boe pean
Eke tive
eae tes
Be Rlae Tan none
ieee Hage
4 Seay te
teeta Tianen
Heche ie me
baa Eo Sa inca eer
see eee ay ee
scan Cmte
ech ee
Shgeearien en
RCO fem
ne thie
Sato on Eaton Standards (S65 (BVA)
eran ee
as Fe
pees a
om Sone
ieee Eo
poe Es
ong rope Hew auton 5 (BY)
a
hgmey Eke
i= fio
Pittome si
ie He
ie. ieee
io ayWehing ropa Operating Mae rar (5) BV)
ioe El
= a
Working roo pe aw Eatin 55) (YH)
oyemane ren
ERIS, ee
ia oc
Hg io
sh oo
tem ie
seco tan 96890
Cr
Shey oe
Working rp o arn Qaio an surteVul nd
‘ly Crven ami (80H (BPA).
inte wenn
Se cies tie
poe mea
fete Se
orn upon rca Queton and Vlamei
“haninaen GoM) PY)
Guts hr tar
Sn Doce 2A Tagpen
Peter Stiuit
Subgroup ep Belcment ie (S84) (BP
Etre semen Ee
Rtg Pegs
ce Ewan
Rena Wate
Worn Croup 0 Weng a Spc Repu Process (688)
as
qe eae
Hee Be
ie aed
reeset het
seat
= Hd
“ae croup on ep y Eaton ber Compote
‘wa
ygesor EN
ie
Waking rom sg sn ra SEU) (PY)
"aon tem
vie tna
Ete ese
Satan on Water Cone Systems (8965) PY)
ek Say BLamne
rec siocti
Heo veka
btw Tes
aoe wpe“wp on ih Sng Nt Aly ses (6.5 Y x)
Poon Sie
Reve Came
Ce Bae kek
Worn Cronyn Cotemen (CS (BVA)
be satan nae
Wiest sary eRe
osc A aneecue
seers Ea etre
Roe Sc bm Aerte
‘Waking pon gpm sn componente
(sens (er a)
Lore oar kw
"earner ome
ret iu
Rhegmoune Cte
hn rap rere Tsing (ECS (9)
ne, |
on a
“or ie
kc oro Compu epction ae etn
(wcrn wv
Taegan Sereey May
Soa smn
oe Paras
dle ory
Wahi ro Rare a SWS) PY)
NA ne ar ew
STamene ey Se
ena Be tmnt
Etter Rae
ham teen
fara nomen
Moose Bir
hat PCF
ce Ps ging nage (FY)
Wet oo neque (BF)
x shme Oe tems
[tone See a
PI By presi
Syn ony on ead nary Hagen
Po sem
mre on THARSPORT aS PY
Moma Libeampcy
Kian" Kaa
be Saas
Eiest sce
‘soup on an an saa (I
Ae Vac a Nira
ReMi Seman Nan
Pei naa
rs [he Cronin ene
0 am oy or‘Sunpoop oF npn, and Contin Seve
era
Part Sern Epes
widens Sena
Teg Reon neagnamter
‘sure on era Reurnees (HP )
ice itm
i eave
eet erearerenie
‘Spay Nsamanatry Append (BV)
Sir ery cy Meter
Porte 1 td Gnu honor
Niche everscuniyrafed
e SNe ot
"sso (ene
LET NEST
Hee eee
He ieee
iar ee
ioe oy
HE Faia
‘cone on wieEARcETMCATION (XC)
ee St Ces
Eee reny Shree Atte
itn hte thee
EA wee [Cong sere
hanes Fos tone
Sia TUL Me tree
‘osu SAFETY VALE REQUIREMENTS (SE
Comin supsormy Eaton
Scot Bite
ikem th
At rie
‘Snr ee Roques (PSI)
aA s0uiat dor ied
Fess: bene
soup o Teng OPH
eetes We
bee Moka
1. Tene Avior Group 0/165 ety lle aes
Ckowan supsery tte
Com rine3 INTRODUCTION
‘Te followings provided as able inwoduction to Seton IX, apd cannot be considered as substitute forthe aca
review ofthe document However, ths nroduton Is ntended to ive the reader eter understanding ofthe purpose
nd ongniation of Section DC
Section IX ofthe ASHE Boller and Pressure Vessel Cde relates othe quaifation of welders welding operators bra
2er, rating operators, and fusing machine operators andthe procedures employed in welding. brazing o ase sing
Inatcordsnce withthe ASME Wollr and PrestureVestl Code an the ASME B21 Cade or PressrePping fe sch, this
snacve document subject constant review interpretation and improvement to recognize new developments and re
‘Sareh data Section isa document referenced forthe qualiftin of mater oning processes by various construction
des sch a Sectin | I 1, Vil Xl et. These particular constracton odes apply to spel types of abrieation and
‘nay impose sditonl requirements or exemptions wo Seton 1 quliteatons. Qualification In acordance with Section
Teno gurante tht procedures and perfrmance qualifications wil be acceptable wo 2 particular constuction code.
‘Section Lk does not cntaln rules for producton jing ar does t contain rales to cover al factors fetng prod
ton materia joining properties under al cumstances Where such factors re determined by the organization oe
Imari jing properties, the argantaation shall adres thse factor Inthe Procedure Speciation tense thatthe
regied properties are achieved nthe production mater aning process
‘The purpose ofthe Procedure Speciation andthe Procedure Qualfction Record (POR) sto ensure the materia join
Ing process proposed for construction i capable of producing jis having the required mechanical properties forthe
Intended aplication. Personnel perfrming the material jing procedure qualification test shall be sufeienty skiled
“The purpose of the procedure uaifestion est to establish the mechanical properties ofthe jit produced by the ma
terial joining process and no the sl of he personnel using the matral iting process. In adn, specal considera
tio seen when thes esting We requ hy tbe Section the ace Te tghnecesplometary eset
‘aris do nt apply unless relereneed Wy the constuction codes,
"Te purpose of Performance Qualeaton ito determine the aby ofthe person sing a materia ining proce to
produce Sound aint In Operator Performance Qualia, the basic enteio st determine the abit ofthe operator
{to propery operate the equipment to produce a sound joint.
In developing Section IK each materia joining proces hati included was reviewed with regard to those factors
(calle variables) which have an eet upon the materia jlning operation as applied to procedure or performance
tena
‘The user af Section I shoul be aware of how Section IX erganae, tis vided lat four Pats: general requlre-
ments, ding brazing, nd plastic sing Each Par addressing 2 mater oiig process then ide ino Artes.
‘The Aces foreach mister ong process deal wth the flowing:
{a general requitements specially applicable tothe material joning process (Arie | Weng. Arle XI Brsaing
sind Ata XX Plastic Fusing)
{@) procedure qualifeton (Arle I Welding Artie It Bratng and Artie Xl Plastic Fusing)
{@)perormance qualicatons (tice ll Welding. Arle XI Brazing. and Article XX Plastic using)
{data (Arce 1 Welding, Arti XIV rasng and Arle XIV Pls Pasig)
{@) sandard welding procedure specications (are V Weng)
‘Thso artes contain general references and guides that apply procedure and performance quaifeations such as
pasitions typ and purpose of various mechanial ets, acceptance erie and the appa of ection TK which
previously appeared inthe Preamble athe 1980 Edin of Section tthe Preamble has since bee deleted) The general
Fequlrement artees reference the data articles for specie deals ofthe testing equpment and removal oe means
tet specens.
PROCEDURE QUALIFICATIONS
ach materi ining process hat hasbeen evaluated and adopted by Seton I iste separately withthe essential
‘and onasertl variables 3 hy apy o tat prtaar process In fener the Procedure Specessons ae required
‘olistall essential and nonessential varables foreach process that sielded under tat particular procure species
tn. When a essental variable mst be changed beyond the range qalfled andthe change snot neta reson 9correcta err requalifation of the procedure specication i required fa anges made na nonessential variable
the procedure noe only be revised or amended to ares the nonessential arable change, When toughness testing
"eqired for Welding Procedure Specicaan (WPS) quliicaton by the construction code the supplementary essential
‘tables become adltonal essential variables, an a change in these variables requires qualification ofthe proedare
specication
In action to covering various process, thee ar lo rules for procedure qualification of corosiom resistant weld
neta overay and hard-acng weld metal oer.
Begining th the 2000 Addenda the use of Standard Welding Procedure Specifications (SWPSS) was permite
‘Arte provides the requirements and lntatons that gover the wee ofthese documents The SWPSS approved for
tse ae ted in Mandatory Append E-
Inthe 2004 Fan, rls fr temper bead welding were added.
‘Wal the incorporation ofthe new Creep Strength Enbanced Fert CSE alls inthe 1986 Eton, using the exist
Jing -Nutber grouping to spc PIT parameters can lead to aratons thet treatments that may signlcantly de
trade the mechani properties of thet alleys. CSEF alloys area fay offerte steels whose creep strength i
Enhanced bythe een os prcee condition of microstructure, spetilly martensite or bane which i stabilized
‘Gorn tempering by contol precptation of temper-resstant carbides carbo-itdes, or other sable phases
Inthe 2007 Editon ofthe Cae, only PN SB, Group 2 tee metas met this dfrion and were approved for Code
‘onstruction Looking forwards numberof SEP alloys are aleay ne in Code Cass and drawing near Incorpors-
ttn. To facltate addressing thei spell rsuirments, No. 158 through PN 15 have Bees established for CSEF
alleys.
‘In the 2013 Fao, Pat G6 General Rogurements and Part QF Pac Pasig were added
PERFORMANCE QUALIFICATIONS
“These artes it separately the various processes with he essen variables that apply tthe performance qualia
lon ofeach proces. The performance qualiestins are limited by essential variables.
"The performance qualifistion artes have numerous paragraphs deserbing general applicable variables for all pro-
ceases QW-380, Q8-950 and QF-960 Ist adiinal essential variables that are applicable for specie processes. The
{Qu-350variabies do ot apply to welding operators. QW-360lsts the addtional essential variables for welding
Generally a welder or welding operator maybe qualified ty mechanical bending ests, or volumetric NDEofatestcou-
on or teil production weld: Brats of brazing operators and ising machine operators may nt be quai by
‘olueti NDE
WELDING, BRAZING, AND FUSING DATA
‘The dat articles nce the variables grouped nt categories sch 3 joints, base materials ad ler materials pos
tions prebeat/postoreld het reatment, ga elec characterises and tecique They ae referenced ftom other a
tiles as they aply to each proces
‘These articles at rently misused by selecting variables that donot aply to a partculr process Variables oly
apply as referenced forthe apllable proces n Arce It or Il for welding, Arie Xl oF XII or brazing and
Article XA or KR for plastic sing The ure of Section i should not apply ny variable that ot referenced for that
process.
"These artes lo icldeasinment of weg ad braningP-Numbers to pariuar base materials and F-Numbers|
to filer materi Arce IV sls ince A‘Narber ables for reference by the Code we.
Begining wth the 194 Addenda, welding -Nambars brazing P-Numbers, and nonmandatory SNumlbers were con
soliated into one table dented as QW/Q8-422. Both the QB-422 table (rang Numbers) and Appendix C able
{G-Numbers) were deed The new Table QW/QH-422 wa vided into ferous abd nonferous Secon, Metals were
{sted n numerical one by material specication number ai users e locating the appropriate grouping number
‘an abbrevited isting of meal grouped by P-Numbers,Nonmandstory AppenisD, has bee indo for users stil
‘vshingt act groupings of metals by welding P’Nmber.
Inthe 2009 Addenda, Number base meal listed nthe QW/Q8-£22 table were reassigned as Numbers and the
‘Sumber isuags and references were deleted
"The QW-451 and QB-451 tables for procedure qualification thickness requirements andthe QW-452 and QB-452 tables
for performance qalfcaton thicknese re given nd may be used ony a ference by oter paragraphs. Generally, he
pproprite eset variables reference these tablesRevislons tothe 2980 Eton of Section introduced new defntons fr poston and added ale weld orientation
sketch ta complementthegroove-vel rentation sketch The new revision o positon inates hata welder ques a
‘the 16, 2,36 et, poston and then qualified to wed, in production in the FV, Ho postons as appropiate
‘QW-AGLS ea revised table that summarizes thee new alifcatons,
‘he data artes also ie shetahes of coupon orientations, removal of test specimens and test ig clmensions, These
ar referenced by Artis |X, and
‘QW-170 describes etching processes and reagents,
‘hin Pare Qi of general definitions appicable to Section X-adopted mate
er sight rom othe welding documents
Nonmandatary Form for dcameatng procedure an performance quaications re provided fr the aid of hase who
‘ont wish to design tei wn forms Any form(s) that addres al epplcable requirements of Section Day be wae
joining processes These maySUMMARY OF CHANGES
“The 2013 Bition of his Code contains revisions in adn tothe 2010 Eaion with 2011 Addenda
‘Aer publication of the 2013 Baton, Ersta tothe BP Cade maybe posted onthe ASME Web se to provide comections
to incorrectly pulsed ms oro core typographical or ramimatial errors inthe BPV Code. Suh Eratashll be
teed onthe dite pasted
Information regurng Special Notices an Eras published on tho ASME Web site under the BPVC Resources page at
tp om asne orgy standards pblestons/opveresources.
“Changes gven below are denied onthe pages bya margin not, (13) placed next to the afc area
“The Record Numbers sted below ate explained in more deta n“List of Changes in Record Number Ores following his
Summary of Changes
Pax vec ange (ed Nant)
over and The Page Section tle and subtle revised (12-1134)
x st of Sections Revised (12.749)
a Foreword Revised in ts emt (09-760)
~ Submittal of Technical Revised (12.1661)
Inquiries tothe Boller
and Pressure Vessel
‘Standards Commitees
a Personnel Updated
ext Introduction Revised in ts envy (12383)
au Cross-Referencing and Added
‘Sst Changes inthe
Roller and Pressure
Vessel Code
2 Part a6 Adds (12983, 12-1956)
u w-io0 Revised (12-159, 12383)
20 qwania22 (2) subparagraph (0,2) revised (11-1697)
(2) Fgure QW-192:22-2(0)(4) aed (Formerly, Append 1
a qwasi2a Subparagraph 2 revised (12389)
n qwasi22 Subparagraph (3 revised (12-983)
2 wag Revised (112142)
By aweioe Rveed (11-1145)
26 Appendte Iatration designated as Figure QW-191.12.2(0\(4) and placed
‘iter QW-19L122(01@) (1.1697)
2 qw-2004 st paragraph, second paragraph of subpar (band subpara. (8)
revised (125383)
2 qw-2002 Revised (12383)
= qweot Revised in ts enirty (12385)Pe
a
a
st
s7
50
ot
66
n
Pn
%6
”
”
ag
”
2
8s
8%
@
88
28
90
wea
qw2z0
wat
‘able qw-261
Table Qw.26t
Table qw.264
Table qw.267
Table qw.268,
Table qw.269
‘Table QW-2681
w2905
w-s00
Qwsi0
Qwsans
qwszan
‘Teble QW.356
‘Table W.357
wet
ewsez
qw-so2
‘qw-40330
w-4oast
qw-40423
qw-40430
w-soase
wos
wears
w-soas
ange fed Man}
th paragraph revised (12383)
Add (0-298)
Ades (11-996)
Rows for QW-408 revised (11507)
Revised (12406 112028)
Revised (122025)
‘Added (08-265)
‘Ade (09-298)
‘Added (11996)
‘Added (11996)
‘Subparagaph (6) revised (10-31-2052)
(1) QW-300.2 and QW-300:3 redesignated as Q6-106.2 and
6106.3, especialy (12-83)
(@)In QW.3012, st settence revised and ast paragraph deleted
(12383)
(@)QW.3013 revised (12383)
{@)In QW-3022, seventh line revised (11-1000)
{Gln QW-3033 fis line revised (12389)
{(6)QW-3041() and QU-30.1() revised (11-1008)
In QW-3102 and QW-31033, "manufactarer" revised to read
organisation” (22285, 121903)
(2) Third tn of subpar. (2 esd (11-1000)
{@)in suparas.(b) and (0), “manufacturer” revised to read
“rgztzaton” (1283, 121903)
Subparagraps(a(2) and (32) revsed (12-308, 121905)
Entry for “Bre of Variables” revised fr QW.40423 and Legend
‘sed editorial (12.28)
‘Entry foe “Bie of Variables" eed for QW-404:23 (12328)
(2) QW-361.14) revised (05.258)
(2) Qw-361.20) revised (1-956)
‘Tie revised (09296)
(qw402.27 through QW-40230 added (19-265, 0.296)
ed (0-265)
Added (09.290)
Revised (101589)
Revised (11-1469)
‘de (09-298)
First iine of subpara. (revised (12383)
Deleted 11-2028)
‘Added (00-265)Poe
92
9s
96
166
166
178
190
192
209
20
mm
ne
230
232
a
qweio
‘ebte w.ats
qwazo
‘Table QW/QB-422
awszas
wa
Table qw-a32
‘Tele wate
Table Wes
Table Wasi
gure QW-46110
qwaaee
gure QW-462.1(8)
Table Qw462.10(0)
‘able QW-462.2000)
‘able qw-462.10(0)
gure W-466.
wart
wa90
gusto
qwsto
B10
eats
hone ed ant)
(241069 deleted (1.2028)
(2) aW.st0-73 through QW410.76 added (08265)
(3) QW-810.7 through Q-41030 ade (09256)
(3) QWA1081 trough 41034 added (11996)
try under “Brie of Variables" revised for QW-40423 (12-238)
Seventh paragraph sed (12-1794)
(a) Revised (09-237, 09-1775, 10-1926, 11-191, 11-622, 11:65,
11-677, 1-876, 11-996, 11999, 11122, 1.1151, 111275,
11972, 1-1943, 11-2027, 12-481, 12.713, 12740, 12-1367,
1251383, 12.1774 12-1954, 121955)
(2) Corrected by erat (11-130, 1-729, 12-1905, 121506 12-2090)
Inset table revised (122167)
‘Add (10-1463)
(4) Fo, 23, S450 rows for AWS Classincation ERASHS UNS No,
‘Av43 and AWS Clssfiestion 4943 UNS No, A94943 added
21332)
(ay For No, 43, SFA-S:4, AWS Classification ERNICYFe-18 UNS
NO6O43 row aed (12152)
Revise (101742)
Note (6) added (11-1146)
General Note ade (12-65)
ad (0.265)
First sentence revised (12383)
General Note () added (12226)
Revised (101774)
Revised (101774)
Revised (101774)
For both Customary an SI Units tales, second row of Material
Column revise (102022)
Revised (121569)
(2) Redesignated as Q6-109 (12383)
[@) Definitions fr control method (FSW); contol metho, fore
(SW; control method postion (FSW); contro! method travel
(FSW); metal transfer mode (gas metal-ore welding):
Sroanteetion: welding, hybrid welding, hybrid, process
‘aparation; and welding, hybrid, process sequence added
(00-265, 09.296, 102104, 11-2031, 12383)
(ay Figores QU/QH-492.1 and QW/QB-492.2 cedest
(QE109.21 and Q610922, respectively (12503)
Revised (12383)
Revised (12383)
Revise in ts entety (12-159, 1238)
Revised (11-1175)mm
an
a4
200
8.300
eanos
Figure 98-4624
Part oF
Mandatory Append A
Form Qui-iga
Form Qu-93
Form quite
Form QW. 4848
Form Qu485
Form 98-483
Form Qu-4at
Nonmandatory Appendix
Mandatory Append E
1500
Nonmandatory Appendix
«
are amber)
{2)im Q8-2001 and Q8-2002, manutacturer or contractor” revised
te rend “organation” (12283)
(2) First line of 08-2002 revised (12383)
(9). Q0-201 revised nts entety (12-289)
(ln 98-2021 Tas sentence os paragraph revised (12.282)
(2)98.3002 and 08.3003 deleted (12-303)
(@) 8.3012, q8-3013, and Q5-303.4 renee (12.985)
Revised (111537)
General Note revised (11-1175)
[Added (11-568, 11568, 11570, 1-571, 12-188, 12-385, 12-1904
122292)
Deleted (22-2643)
Revised (12583, 11-1468)
Revised (12383)
Revised (12583)
Revised (12385)
Revised (12308)
Revised (12583)
Revised (12-383)
(Ap Revised (09-257, 09-1775, 10-1926, 11-191, 1-622, 11-677,
11-876, 11-998, 11999, 1.1122, 1-118, 12-12%%, 11578,
111943, 11-2027, 12-401, 12.713, 121967, 12-1393, 121508,
121774 121950)
(2) Corected by erat (11-2201, 12-1506)
WPS replaced with SWPS throught (11248)
First paragraph revised (12383)
ded 12-568)
NOTE: Volume 62 ofthe Interpretations to Seton If he ASME Holler and Pressure Vesa Cadefllows the ast page of|
SextonLUST OF CHANGES IN BC ORDER
Record Number
265
wa
09.298
09-760
wars
1046s
1051509
301741
soa774
401926
02021
102104
iis
31507
11568
nse
11570
ns71
622
11653
1.677
a7
11876
11996
11998
11999
on
‘Added new Table QW.266 and para, QW-402.27, QW-A02Z8, QW-40229, QW-#03.30,
{Qwes10.73, QW-41074, W.-410.75, and QW-410.76; ded new fnons for conto method
{FS control method, free (SW), contra metho, postin FSW). cntrol method rae (FS)
find welding fton str (SW) in QW 492.
‘Rdded S4367 9cr-iMo plate at Grade 9. and Grade 9 CL 2 wo Table QW/QB 422 and Ap-
penx
‘aded 220, 267, and QW:360 to incorporate hybrid laser welding
‘Added on introactry sbi darying the purpose and limitations ofthe Foreword. Revised
tistry paragraph to recogni the reaignment of the BP ito several BPs Deleted the parse
trapl on tolerances Made editorial changes to recognize the new commie structure, Deleted
‘ards addressing governing ade edtons Deleted paragraph concerning ata. Deleted the
fsreaph dealing with wha the cole conser fn the foralation of these rls
Revised QW/QH-422 and Nonmandatory Append D.
Revised QW2905 and igure 8 QM-462.12,
Reve 424 toad anew para. QW-1242 as sown nthe proposal
Revsed QW-40423 tad aricaton
Replced lines with numer values Reduce sigan figures tothe fr most lments,
{nd two for Added Note (2) to acy sateat of nonlsted elements
Revised Tables QW-4621(3), 0), and (c) 0 change the units from ig 0 "N>
Revised SA/CSA-G4021 Grades 4 and SOW material in QW/QB-422 and Appendix D,
Revised Table QU-4664 to update P-Nember.
‘Add te defnton of "raster made” for MAW to QW-492,
rat corti Se Summary of Changes for de
‘Assigned P Numbers to SA-4D4 in QW/QB-4Z2 and Append,
Revised QW-4098 and QW-409.10
Incorporated new Article QF-100
Inconporated new Ariel QF-200
‘ncorported new Arle QF 300, Revised proposal nudes QF-300- Article redesignat from
‘Ox to GF, rewrote QF-900.2 tobe the same a QW-3002 (welding rqulroments), revised
(QF-30224}1) changed QK-463 to QF-463(a),eevsed QF-3022(a)@) = changed QKAX to
(de-4630) tevsed QF 3022 deleted QF-202.2b] and removed FT. Added QF-408 (2nd Col
ti) abd Pipe Matera (Ir Colum) in Table QF-360,
Incorporated new Article QF-10.
Assigned welding and bring P-Numbers (0-8 Grp 4 and 102) along with 80 15608 Group
(62) (aN /QH-422 and Appendix D) to (10) of he speciation referenced by Table 3 ofthe
ode Case, P Numbers were not assigned fe SA-193 (Botng) and SAT94 (Nut)
Deleted carrent reference to $4240 UNS 31050 Type SIOMoLN fom QW/QH 422 as shown in
the propos le and added the dal reference for 240 UNS 31050 Type 320MOLN with lt
inate tensile strengths af 78 and le to QN/QH 422 as shown in the proposal fl.
‘Asgned welding and brazing P Numbers (-10H, Grp. 1, and 102) along with 30 15608 Group
(ox) (QW /Q8-422 and Appendix D) othe (6) spcteatinsrefernced bythe Code Case
Enata correction See Summary of Changes for deals.
Deleted 84-695 fom Table QW/QB-422 and Appendix D.
‘ded QW-221 and Table QU?-458 to ncorprae hybrid plasma GMAW. Revised text nd tables
to incorporate bat comments and input from Nasvile 2012 meecngs Observed tha pars
‘ah QW2S%. sould be revised (Se Project Manager notes, below)
Revised QW/Q8-422 and Normandatory Appendix D
[ssaned proposed Welding and brazing P-Numbers (210M, Grp. 1 and 102) along with 1S0
{5608 Group (101) (QW/Q8-422 and Appendix D) to the (3) spetcstons referenced by the
Cade case.Record Number
Tr008
saa
1s
ise
1st
19s
111463
111587
11as72
m6?
m9
m2m7
312028
20m
312062
nau
12201
88
mais
2330
12303
12408
12481
12564
98
wae
121305
121352
121367
121393
12506
12156
1268
warm
chan
ievised QW-3022, QW 3061, QW-305:, and QU-321.3(a) wo improve consistency and appy
‘more gical requirements fr volumetric examination when sed for welder and welding opera
‘or perormance qualfestion,
‘ded GB 713 Grades Q370R and 15CeMOR to QW/QH-422 and Appendix D
Proposed ational acceptance eters for visual examination of performance coupons.
Revised QW.481L
Revised A213 and 4312 he and pipe alos numbers Table QW/QU422 and Appendix.
Revised QB-1814 and Figure Q-4024,
Rowse Append Eto updated references.
oad Table QW/QU-422 and Nonmandatry Appendix D
Revised QW-404.30 and QW 402
Rewsed Q5-4105,
Revised Table QW/Q8-422 and Nonmandatory Append D
rata correction, ee Summary of Changes for details
‘Added ASTM A859 a 54859 and assigned a P.No. to Table QW/QE-422 and Append
‘Added SHYNF A 36215 Grad PAHO Nj to QW/QH-422 and Appendix D
Revised QW-264 and QW-2641, and deleted QW-40813 and QW-410.,
‘ded defintions to QW/Q5-492
‘Ades paragraph to QW-209 Se,
Revised QW 1981
‘rata correction See Summary of Changes for deta
‘Added Genel Note to Table QU-481.4
‘Added ERNICHFeL4 to QH432,
Revised Scope paragraphs QW-I01, QB-101, and QF-101
‘Add Note) QU462.13).
Revised QU356, QW-357, and QW:
Add Part QG, General Requirements Revised the Introduction, Par OW. and Part QB ta slin-
Inate edundancy with Part. Added a dfniton forthe term ongunaatin Globally revised
Seton Eto replace the terms menyjacturer contacto, semble ntl ad fabricator wth
the em gonzon.
Era correction, See Summary of Changes for deals
‘Added SA533 Type BC 2 to Appendix, and added SA 533 Type Cl 1 & 20 Table QW/
(guatzz
‘ded Nonmandatary Append on Guidance on Invoking SCX Requirements.
Revised Table QW/Q8-422 and Appendix D to Include a numberof ASTM specications. The
‘changes tobe voted on the recreation ballot te a flows:
* changed "NO8637" to "NOBBGT™ on pages 10, 12, 16,17, 23,24, and 35
+ eanged “pipe eo “ibe for A799 $2205 on page 31
deleted the addition of-101. 1. A182.S32205" on page 2 because isalendy sted
reo
Adad 10 15608 Group numbers for SA/G8713 QS7OR and SA/GB713 15CrMOR materia to
Table qwygs-a22
Added using” ote of Section X Code Book
Errata correction. Se Summary of Changes for details.
Adopted AWS A5.10/85.106:2012 (180 18273:2006 MOD) in Modifestion to QW-A32 to at
‘lays tothe Fumber table
‘Added ad revised API SL. grades in QW/QB-422 and Append D
Revised ene Table QW /Q8-422 and Append. Replaced al Sh" with"A/SA" an all SB-"
th "B/SB Deleted redundant ASTM Aand Beper no's, Replaced ASTM Aad B spec os With
"ASA and “B/SB- for materials sted in Section Il art and Par
rata erection See Summary of Changes fr details,
Revsed W471
Deleted Appendix A and added the rogirements tothe font mater:
‘ded A/SA 350 L¥6 C2 material to Table QW/Q8-422 and Appendix Dasa No 1 Group 3
rmter
a)
Record Number coangs
ima
121993
1251955
121956
122090
22167
122202
iesed Teh paragraph of QU-20,
Revised QW-222 (01) a (2)
Revised Part QF to incorporate Pat OG
‘Added UNS numbers in Table QW/QB 422 to SA'53 Type f, SA-196 (SA283GrA) and
(Sazesce8), SA135 A and B, A139 A, SA-178 D,Sh-182 FSVCb and F92, SA-336 F3VCD,
[5351 CRON. SA 369 FOND, ANSI CPE2ON, SA-SO8 3VCH, ASAI 3VC, SA-542B Ch. da, 8361
‘WP Alda 3008, and BS47Alld 3003 Delsted and replaced material grades wih UNS mum-
bers in AppencteDfor 8361 and 8547.
Revised Table QW/QH22 hy deleting tele strengths fom AS.
Revise QG1063 and QC-106°0.
Eat erection: See Summary of Changes for deal
nat correction, See Summary of Changes for deta
nat correction See Summary’ of Changes for etal.as) CROSS-REFERENCING AND STYLISTIC CHANGES IN THE BOILER
AND PRESSURE VESSEL CODE
‘Tere have ben structural and style changes wo BPVC, tring wth the 2011 Addenda shoul! be noted toad
vgating the contents. The allowing is an overview ofthe change
‘Subparagraph Breakdowns/Nested Lists Hierarchy
+ irstlee breakdowns ae designated as), () (6) ty a nthe past.
+ Socnd-evel breakdowns are dsigrated a (1), (2) (3) ee a in he pas.
+ Thirteel breakdowns are now designated ae (9), (0), (cee
+ Fourthiovel breakdowns are now designated ae (4), (2) (4) ete
+ itelvel breaaowns ae nw designated 5 (0) (0) (2)
* Soevel breakdowns are now designated ae (4) (02), et
Footnotes,
‘With the exception of those inca nthe fon mater roman numbered pes) all footnotes are treated as en
notes. The endnotes are referenced in numeric ater and appears the end ofeach BPVC section subsection
‘Submittal of Technical inquiries to the Boller and Pressure Vessel Standards Committees
Submit of Technica Inquiries othe Boller and Preacr Vs Standards Commitee hasbeen moved to the front
‘mates This information now appears In al Baler Code Seevons (excep fr Code Case books).
Cross-References
"Riso intention to extabishcros-eerence ink unctionality nthe curentedton and moving forward. T fata
this cross eerece stl has changed Cros-fernces within. a subsection or subatele wllnot include the designate
entitr ofthat subsection subartie eamples low
*(Sub}Porgraph Cros-eferences The cross-references to subparagraph breakdowns wl follow the hearty ofthe
Aesigaters under which the breakdown appear.
ubpararaph a) appear in (ell) and referenced in X3(0() it wil be referenced a ().
subparagraph (2) appear in Kiet) bu referenced sn X1(0(2) wl be referenced as (23).
~ lf subparasaph (2) appears in K1(Q)1) but eferenced Sn X61), wl be eferenced se (AN)
= if subparagsaph (2) appear in XAe)L) but referenced in X2(0}2) wl be rlereneed as LUCIA).
+ BquatonCrseheferences The cross-references to equations wil ello the sate logic Fr example, (1)
appears in X1(a() bat referenced in X10), wil be reterenced ase (A(1(2) Hea (1 appears in X10)
(A) buts ference in a diferent subsetion/subarice paragraph wl be referenced ase NACI)
enPART QG
GENERAL REQUIREMENTS
06-100 SCoPE
(a) This Section contains requirements forthe quale
cation of wader, welding operators, razr, rating op
‘ators pls fsing machine operator, andthe mata
Jomning processes they use daring welding brazing 2nd
‘sing operations forthe construction of components un.
(Gerth rales ofthe ASME Boller and Pressure Vessel Code,
the ASME BD Codes or Pressure Piping and the Codes,
Standards and speciation that reference ths Secon.
$e Secon i vided lo Four parts
(0 Part QG contains general requirements forall
materajening processes.
(2) Part QW contains requirement for welding
{G) Pare QR contains requirments for brazing
(4) Pre QF contains requirement for last using.
(0) Whenever the refereeing Code, tandardo pec
In this Sto, he requirments ofthe referencing Code,
Standard or specification sal ake precedence over the
elements of his Section.
{o) Some ofthe more common terms relating to mate-
ria Joining processes are defined in Q6109. Whenever
the word pipe” i use, ube” sal als be appleabe.
(QG-101 PROCEDURE SPECIFICATION
A procere speciation writen document provid
ing diction tothe person apelying the mater joining
process Deal for the preparation and quafeation of
Procedure specifications for weléing (WP), brazing
{PS and fasng (FPS) are ven in the respective Parts
‘dressing thore processes. rocedure spcistion sed
ty an organization (ee QG-109.2) having responsi
foropeatonal contol of ter ating processes shall
fave ben isle by tha organization o shal bea stan
(ord procedure specfiention acoptable under te rules of
‘the aplieable Pare fo the ening process to be wed
Procedure speifiations addres the conditions (i
chung anges f any) under which the mater ining
proces mst be perfomned. These condos are cefered
{om this Section ae "varbles When a procedure speci
‘ons prepared bythe organization, shall adress
‘minimum the specie essen and nonessential var
“bles that are aplesle to the materia jonng process
{Tobe used in production, When the referencing Ce sa
far, or apecfeaton requires toughness qulieatin of
‘the material joining procedure, the appa supplemen
tary estenil variables shall also Be addressed in the
procedure specication.
Procedure speciation writen and quali i accor
tance with the rules ofthis Seton and personel whose
performance has been qualified to use the procedure
Speleation in acordance with these rules may be used
to construct components that comply with the requle
tents of the ASME Boiler and Pressure Vessel Code or
the ASME B31 Codes fr Pressure Piping
However oer Sections ofthe Cade state the rues ur
der which Section I requirements are mandatory. In
‘whole o in par and may give additonal requirement,
"The eaderiavised to tae these provisions it consi
‘aton when using hs Seton,
(06-102 PROCEDURE QUALIFICATION RECORD
‘The purpose of quaifping the procedure speieston is
to demonstrate thatthe jing process proposed or on
“ruction Is eapble of producing Jotts having the re
Auired mechanical properties forthe intended
Spplietion.Qualifestion of the procedure specification
lemonsrates the mechanial proper ofthe ont made
Using oiing proces, and not the kil ofthe person
‘ing the jong process.
"The procedure qualifeation record (PQ) documents
what occured daring the production ofa procedure qu
Iieation tes coupon and the ess af testing that cou
on. As a minimum, the PQR shall document the
seit procedure qualification test variables applied
thring production of the tt ont, and the results of the
‘equied teste When toughness testing s required for
‘uaifeaton ofthe procedure specication, the aplcable
{Supplementary essential varables shal be recorded for
‘ach process. The organization shall cers the PQR by 2
Slenaure or other meane ae deseribed n the organ
tion's Qualty Control Sytem, The PR shal be accessible
to the Authorized Inspector. A procedure speciation
nay be supported by one or more PQR(), and one
POR may be used to support one or more procedure
spetestons).(06-103. PERFORMANCE QUALIFICATION
The purpose of quaiyng the person who wil use a
Inning proces Is to demonstrate tat persons ably
Produce a sound joint when using a procedure
Speciation,
6-104 PERFORMANCE QUALIFICATION
RECORD
‘The performance qualifestion record document what
‘occurred during the production of test eaupon by ape
son using one or more Joning processes following an
‘rgonizatons procedure speciation hs 2 minim,
the ecord shall document the esential variables foreach
proces used to produce the est coupon, the ranges of
‘aribles quaied, and the results ofthe rquied testing
andor nondestructive examinations. The organization
Shall cera performance qualiention record by asia.
{ure of other means as described inthe organization's
‘Quality Cont system and shall make the performance
(qualification record accessible tothe Authorized
Inspector.
06-105 VARIABLES
Q6-105.1 Essential Variables. Essent varbles are
‘ondions in which a change as daseribed inthe specie
‘arabes, considered to aflect he mechanical proper
the Jone Before wing «procedure apectcton whose
‘ssel variables have been revised and fall outsde tet
‘qualed range, the procedure specification must be
Foquaife, Procedure qualieaton records maybe cha
od when a procedure qualfestion text supporting the
‘hang hs ben completed, or when an edral revision
[smnecessary to correct an error a permed by the rules
ofthe Par apple to the mei ling process
06-1052 Supplementary Essential Variable. Sup
plementary essen varable recondition im which
ange wil afc the toughness properties ofthe Jon,
heat affected zone, oF base material. Supplementary
sonal variables become adtonl essential variable
In situations where procedare qualifications require
toughness testing. When procedure qualifestion does
not equi the adison of toughness esting supplemen
tary esential variable are not apple See Q-401.3.
(06-105.3 Nonessential Variables. Nonestelvar-
ables are contions in which change a decribed inthe
Specie varables, snot considered to fet the mechan
ica properties ofthe Joint. A procedure specication
‘may be eatoraly revised to change a noneseti vat
be ofall ouside a ts previously sted range, but docs
‘ot require regulation of the procedure speciation
QG-105.4 Special Process Variables. special process
variables are conditions that apply only to special
Drocesses that are desrbed inthe Part tit sddreses
those proceses When these specal roceaes ae we,
‘only the applicable speil process variables sll ppl,
‘change In these proces varales shall equ rua
Aestion ofthe procedore speieston,
Q6-105.5 Applicability. the applicable essential,
supplementary essential, nonessential, and special
process variables fora speci ining process ae given
Inthe Part addressing that jonng proces,
(06-106 ORGANIZATIONAL RESPONSIBILITY
6-106.1 Procedure Qualifiatons. Each organi.
tions responsible for condcting the teste required by
this Section to qualify he procedures that are used in
‘the constuction of components under the rules ofthe
(Codes, standards, and spoifiation tat relerence this
Section
{Bach organization responsible forthe supervision
and conrl of persons using materia oiing processes
forthe production of ts joints for procedure quali.
‘on The persons producing et on forthe gualifstion
of procedures shal be either direct exployes or shal be
personally engaged by contract for material joining
(6) Production of qualifction tes joints under the
supervision and cone of another rganiaton ot pt
Inte, However, is permited to sbontact ay ral
tf the work necessary for preparing the materials to be
Joined the subsequent work for preparing ts specimens
From te comple ot vind epee ot nom
destructive examination and mechanical tests, provided
the organization acepts all respons fr ny such
work
{che efective operational conta of procedure gus
leans fortwo or more empanis of iferent ares
‘exists under the same corporate ownership, the compe
‘is involved shal deserbe i her Quay Couto Sy
tem/Quaity Assurance Program the operational control
of procedure qualfcatone In this case, separate proce:
ure qualitations ae nt eequired provided all other
quirement ofthis Seton are met.
Q6-106.2 Performance Qualifeations. Ech organ-
tation is responsible forthe supervision and contol of
material joining performed by persons for whotn they
ave operational responsbliy and contro The organisa
tion shall conduct the ests required by tls Section to
{ual the performance of tose persons with echoing
proces they wl use forthe construction of components
Under the ules af the Codes standards an specations
‘hat reference this Section. The responsibility cannot be
“alegated to another organization
(a Each onanzation i responsible forthe supervision
an control of persons using materi oning processes
for the production of test jaints for performance
‘qaifexton
(@) The performance qualification test shall be
performed following ether a quale procedure speif-
(ation ora standaré procedure speciation acceptableunder the rules ofthe applicable Part for the joining pro-
ess The Pat addversing any specie ing process may
xempt a potion ofthe procedure spetfiaton from
being towed during producton of the performance qu
Iain test coupon
{c) Production of est joints under the supervision and
control of another oraniatin not pete. is pe
ited to subcontract any orl a the work necessary for
preparing the materi ob one in the test it and
fhe subsequent wor for preparing test specimens fom
the completed test it andthe performance of nondes
tractive examination and mechanical tess, provided the
tgantation accept fl respons for any such work.
{d) The performance quleation test may be term
rad a any stag, whenever It becomes apparent to the
Supervisor conditing the tests thatthe person being
tested does nothave the requted hilt produce ssi
tory results
{e) When a procedure qualifction test coupon has
bes tested ad ound acoptbl, the person who pre
pred the test coupon i also qualified forthe owing
rocess used within the rngee specified fr performance
‘uals for he sppeable proces)
1) Persons who are succesfully qualified shall be
assigned an identi number, ete, or symbol by the
ania hich hall be set deny their work.
{gf efecive operational contra of perfomance quar
tants under the tne corporate ownership the compa
tle involved shall describe to thelr Quality Control
Speen Quality Assurance Program the operational con-
trl of performance qualiteations In hs exe, equal
tion of persone working whi the companies of such an
forgniation ae ot rue, provided all other requ
nents of the Section are met
Q6-106.3 Simultaneous Performance Qualifca-
tions Orgunastions may parspate nan asscation to
olectively qualify the perlormance of one or more
persons for materia oining processes simultaneous
When simukaneaus performance qualifcations are com
thcte. each parlipsting organization shal be repre
ented during the preparation of the Joint test by a8
mpoyee with designated responsi for performance
‘ualietions
{e) The procedure speleaton tobe followed during
simultaneous performance qualifications stall becom:
pared by the participating organizations, and shall be
Hetil fora estental varbls exept as otherwise
provided in the Prt aresing the specie ning meth
fi The quali thickness ranges need ot be identical
tisha be adequate to permit the completion ofthe test.
10) Alternatively, the partipatng organizations shall
agree upon the use of single procedure speciation
Forwhic ach parpoting ongnizaton has asupperting
PR or bas accepted responsiy for using e standard
procedre speciation i accordance wih applable Part,
forth oining metho, whose acceptable range of vari
tbls i consistent with those te allowed during the
performance qualification. When singe procedure sped
tion is tobe followed, ach patcpting organization
shall review and accep tht procedure speiication.
1) Each participating organization's representative
stall positively identify the persan whose performance
{sto be tested and sal very the markings on the test
Coupon correspond tothe person’ dentiication; and
Sfallalso verily ha the postonal orientation marings
tn th tent coupon reflect the test poston of the coupon
5 required to identify che location of test specimen
removal
1d) Each organizations representative shall perform a
‘visual examination ofeach completed test coupon and
‘ach test specimen to determine ts acceptably Aten
fey afer sual examination, when the test coupons)
prepared and texted by an independent abratry hat a+
oratory’ pore may be weed a the bast or accepting
the test results, When the tert coupoa() i examined by
‘Volumetric exainaion the examining ogalaatons re
ort may be used asthe bass for aceptance ofthe test
foupen
1 Each organizational representative shall prepare
and cera a performance qualfiation record for exch
person quale,
“When the person changes employers between par
tg rata eli sataton sal
tren maintain by previous employers ince bs quali
‘ton date a required by the appeal Pato he joln-
Ingmetod. Evidence of aces supporting performance
{Qualifieation continulty may be obtained from any
Ihemerof the assciation, even ithe member Was not
{ purtiapent inthe smutaneos welder quaiations
(a) la person has had thet performance qualfeation
withdrawn for specif reasons, the employing oan
thon shal notify al ether partipatng organization that
the person's qalifestion(s) has been rvoked, The r=
maining partcpating organizations shall determine
‘hetero not hey wl uphold or withdraw the perfor
Inanee gualifaton for tat person in accordance with
this Section
(0) When a person's performance quliiations are re
reed in aeorance wth the provisions of he pla
ar forthe joining method the esting procedures shall
{alo the rls of his paragraph Each renewing organ
"atin sal be represented by an employee with desig
rated eespontiity for performance guaiiation.
(06-107 OWNERSHIP TRANSFERS
Organizations may malatan effective operational con
trol of POs, procedure specifications apd performance
‘helifenton records under diferent ownership than ex
[Sted during the orignal procedure guaification. When
fn organization or some pat thereof is acquired by &
ew owner(s) the PQRS, procedure speciation, andperformance qualification records may remin valid for
Use by the new owner(s) without requaifiation: and
the new owner(s) PORS, procedure specication, and
performance qualifiation records become val for use
bythe acquired organization, povided al ofthe following
requirements have been met
(o) The nev owners takes responsibly forthe proce
dure speciteasons and performance qualification econ
(@) The procedure specications and performance gun.
eaton records have ben revised t elec the nae of
the new owner)
{The Quality Control System/Quality Assurance
Program documents the original source of the POR,
procedure specifications, an performance qualifiation
Fecords as bang fom the original qliping organization.
(06-108 QUALIFICATIONS MADE To PREVIOUS
EDITIONS
Jolingprocedares, procedure ualfeations and per-
formance qulfistons tha Were made in aecordance
ith Editions and Addenda of ths Seaton as fa back =
the 1962 Eaton may be used in any construction for
hich the current Eaton has been specie,
Toining procedures, procedure qualifications and pet=
formance qualieatons tht were made in accordance
with Batons and Addenda of tis Seton prt tothe
1962 Eton may be ured in any construction for whieh
the current Eaition ha boon specified provided the
Fequlremens of the 1962 Eaon or nate eion have
been met
Procedure specications PQS, and performance qa
‘eatin records meeting the above requirements dant
require amendment to Include ay variables required by
later Editions and Addenda, except ax specified In
(QW-120.Qualication of new procedure specfstons
for joining processes, and performance qualfietions for
persons aplyng them stall bein accordance wt the
Siren Elton of Section 8,
QG-109 DEFINITIONS
(QG-109.1 GENERAL
Definitions ofthe more common terms relating to
‘materi ning processes are defined in Q1092 Thete
sre term listed that are spec to ASME Section I and
‘re not presey defied in AWS A20 Several defntons
ave been modified sight rom AWS A3.0 soa to better
define the continent assed in ASME Seton 1.
06-108.2 DEFINITIONS
are seam weld: a seam weld made by an arc welding
ore spot wel 2 spot wold made by an are welding process.
ar strike: any inadvertent comity resuking fom an
are, consisting of any localized remelted metal,
Ieataffected metal or change i the surface profile of
any metal objoct. The ae maybe eatsed by are welding
‘ecrodes, mapnet ispetion pros or rayed elect
bie
are welding 2 group of welding process wherein cals:
cece is proce by beating with am aro ats, wth or
without the applieaton of pressure, and with of without
he eof filer metal
braze a. pertalning tothe conton of brazements
er brazing. porto any subsequent thermal mechan
fal or chemical teatinents
seed a} percaning to the conaton of weld meta,
Welded joints, and weldments after welding but prior to
Any subsequent thermal, mechanical, or chemical
‘bckgouping: the removal f weld metal and base metal
From the weld root side of welded joint faite comm
‘let isin and complee joint penetration upon subse-
‘quent welding fam that side
backhand welding’ welding technique fn whch the weld-
Ing toreh or gun is directed opposite tothe progress of
swing
backing 2 mater placed at the rot ofa weft forthe
purpose of supporting molten weld metal oat actate
Fomplete jin penetration The material may or ay not
fase the jolt Se alo renner.
backing gas a 35, suchas argon elim, nitrogen, oF
reactive gas, which employed to exe oxygen fom
the root Side opposite fom the welding ede) of weld
Joins
‘bse metal: the metal a allay that welded, brazed, of
-bead-up cycle: part of the but-fasing process to ensure
compete ontatt between the heater surfs and ee pipe
ns The bead-p je bein en ntl cata the
pie ends to the heater Is made at bt fasing pesture
“ntl a indication of mates observed around the Pipe
‘remeron,
bond ine Crain and thermal spring tho cros ection
the interface beeween braze or thermal spay depose
the substrate,
braze joint produced by heting an arembly to sutabe
temperatures and by wig ile metal having» gud
shove B40°F (450°C) and below the solide ofthe base
Imstrials. The filer metal le distributed between the
ose ited surfaces ofthe oit by cpliry acon.
brazen: one who performs ¢ manual er semiautomatic
‘braing operation,bracing» group of metal oining processes which pro-
thee eolecence of materia by beating thor to sta
bie temperature, and by eng a Mller metal having a
Tigidassbove 840°F (450°) and below the solidus of
the base material, The ile mets lstbuted between
the closely ted surfaces ofthe jit by cally action.
brazing operator: one who operates machine o automate
bring pment.
brazing temperature: he temperature to whic the base
‘etal sented to enable the ler etal wot the base
etal) and form razed jon.
ring temperature ronge the trnperatre range within
hcg ean be conducted
brazing, automatic: braving with equipment which
performs the bracing operation without constant observ
lon and adjstnnt by a brazing operator. The eguipment
tay or may not perform the long and unloading ofthe
work
bracing block (brazing process that uses eat rom
ated blocks applied the oi. This san abslete oF
seldom used process.
brazing, dip (DB): brating process in which the heat
Feauie farms bya malen emia or etal bath
‘When emeten heal ath rude bath may aca
‘hus en a molen metal bath suse, the bath provides
the fer mea
brazing, furnace (F8) brazing process in which the
workpieces are placed ina furnace and heated tothe
brazing temperstre
brazing, induction (1) a bratng process that uses heat
ftom the resistance ofthe workplees to Induced lcs
rang, machin: brazing eth equipment which performs
the braving operation under the constant observation and
fonttl of brazing opera. Te eulpment may of May
‘ot perform the loading and unloading ofthe work.
bracing manuel breaing operation performed and com
trolled completely by band, Se also automate brazing
Sd machine rang.
Broring existance (RB) brain proces that uses heat
ffom the resistance t electric cureet flow Ina cea of
hich th workpieces are a part.
brazing, semiautomatic: brazing with equipment which
Contos onl the bratng filer metal fed. The arance
‘ofthe brani i manually contol
brsing torch (7B) a brazing process that ses est rom
ue oe Mame
up of bse metairestoraton of base metal thickness
‘hiss the aplcton of weld material toa base metal 0
{sto cestore the design thickness and/or structural
Integrity. This buld-up may be wih chamisy different
Rom the Base metal chemistry which hasbeen qualified
vin standard butt welded test eoupon. Also, may be
baled base metal repair or buldup.
ut joint: a jin between two members aligned aprox
rata hese plane,
but fusing ele: pressure-time dagram for a defined
fusing temperature, representing the entire bute sing
operation
ut sing pressure: the sum of he theoreti but fusing
pressure pus the drag pressure This the gauge pres:
Sure wed by the butefusing operator onthe Dutfesng
‘machine to join the pipe ends
utring: he addon of material by welding on on or
both fates of oi, port the preparation ef the joint
{for final welding fr te purpose of providing suitable
tration wold deposit for the subsequent completion of
the ine
clad brazing sheet: a metal host on which one or both
Sdes are cad with aang ler meal,
clecence the growing together or growth Int oe body
‘ofthe materia Being Jone.
complet fasion sion which has ccureed over teenie
base material suraces intended for welding and between
sll layers and beads
composite 3 material consisting of two or more discrete
Iaterfats with each material retaining Its physieal
deny.
consumable insert: filer metal tat placed a he joint
oot before welding and is intended to be completely
fuse the roo to become prt ofthe weld
contact ube: a eve which transfers current a cntin-
ous eeetrode
contol method (FSW) the manner of monitoring and
ontraling the postion ofthe rotating too with respect
to the weld jit during the fetion st welding process
orl metho, fore (FSW contrl method that uses a
fore set point uch a lange free or travel foee to
onto! the tol postion, Under the force contol method,
the ange depth or travel spond can vary wnthin 3 pec
fed ange, during welding
control metod, poston (SW) a contro method that wes
‘Set plang poston eats ts the plate surface contra
the tol positon Under the postion control method, the
Plunge free can vary, thins specified range, during
welding.
control meth, trove (SW) conta method that uses
Set travel speed to control the tool postion. Under the
travel contrel method. he travel fore ean vary, within
‘peed range, uring welding.ntl specimen: a seion rom the base materi tested
tw detormine its tensile strength forthe purpose of
‘comparing the tense strength ofthe buted jon.
ool time o¢ but fsing pressure: the minimum me that
the butefusing pressute stall be maintained between
the pipe aces while the pipe joint nats Tis a function
of he wal thickness
farmer joint a joint between two members located
approximately a ght angle to eachother inthe for
fant
‘coupon: se et coupon
‘rac: afacturetyp discontinuity charactried by
Sharp tip and high Fauo of eng and width to opening
Asplacement
ervey strength enhanced ec aloe (SEF) 2 ay ob
ferrite steels whose creep temperate strength is
taaneed Wy th eration aa precise conton a ico
Structure specially martensite or bine, which tabi
lied daring tempering by controled precipitation of
tempertesstant carbides, carbons, or other stable
and/or metable phases,
data acquisition record: dete, permanent record of
the times and pressures Used athe fsing proces sng
‘withthe eter sua tempera, emplaye infra
tion, ising machine information, pipe Information date,
a ie foreach tn made
foc a contin or dscontinues that by nature
‘sccumulated eet for example, ttl crac length) ren
ter a par or product unable to meet minimum applicable
ceptane standards or spetfeaons This term desig.
hates reject See alsa continu and flo
direct current electrode negative (DEEN) te arangement
of rec curent are welding eas in which the elecrode
Isthe negate pole and he workpiss the postive pole
ofthe welding sre
Aree cure electrode postive (DCEP) the arangement
of rect cures are welding lead which the electrode
[the postive poe andthe worplece the negative ple
ofthe welding are
\Ascontnay an interruption ofthe typical structure fa
materi such a5 2 ak of homogenty nitsmechanal,
Ietallugal o physical characteristics, dlecontnuty
Iso neces e defect See alo defect ad low.
loubl-weded jit jit that welded rom bth ses
lube wed lp join: jin which the verapped
flgeso he members tobe ened are welded slong the
‘lees o both members
rag presure: the pressure requeed a overcome the drag
Feslstance and fietonal resistance in the bute using
Iachine and keep the carriage moving att slowest
Speed.
drag rsitencefrce-opposing movement ofthe movable
lamp duet the weg ofthe pipe.
voll the tne ducing which the energy source pauses at
‘any pola in each esiiion
letrods, or wing: a component of he welding cet
‘Ovough which currents conduced
letras, bare alee metal electrode that hasbeen peo-
“ice a5 a wie stp or Dar ethno casting or covering
bother than that incidental to its manufacture oF
preservation
stood carbon: noniler mater etre we
Welding and eating, consisting of a carbon or graphite
Tod, which may bo eoatd with copper or other materi
eto compost generic tem af miompenet fi
ler metal electrodes in various physi for, sch as
sranded wires tubes and eavrod lect,
tectrodeconered a compose fer metal eectrode con
Sisting ofa core ofa bare electrode or metalcore ele
trode to which a covering suficlent to provide a slag
layer onthe weld metal his been applied The covering
may contain matras proving seh funtion shld
Ing trom the atmosphere deoxation, andar tabla
tion, and can serve asa Source of metallic additions to
the weld
tetro lacrslg welding filer metal component of
the welding cel through which current Is conducted
between te electrode guiding member and he molten
slap
lectrodeemisve:a filler metal electrode conssng of &
‘core ofa bare electrode or a composite electrode t which
4 very light oating has ben aplied to produce a stable
tecrode,uscored: a composite flr metal electrode
Consisting ofa metal tube oF ether ball configuration
‘onfaning ngredlent to provide sich into shield
Ing atmosphere, deoudation, ae tabilzation, and slag
formation lying mater ray be Incl is the coe,
Extra shielding may or may not be sed
letodetghy cote: filer metal electrode consisting
‘of amet wie with ight costing applied subsequent
the drawing operation primal fo tabling the ae
)letode, metafile of noniler meta lctrode used.
In are weling an eating that consists ofa metal wire
freod that has been manufactured by any method and
thats eter bare or vere
electrode, metal-ored: a composte ler meta electrode
onsstng ofa metal tbe or other hollow conlgration
‘nani alloying ingredients Minor amounts of ingredi-
nt providing such tons as are stabiation and Mx
ing of oxides may be included. External shielding gs may
ormay not be use,
cleo resistance welding: the prt of rsistance wel
{ng machine through which the welding euerat apd in
ost eases force are apple iret to the workpiece.
‘The lectoge ray bei he form of roating wheel ro
tating al bar, ner pate clamp, chic, or modes
tion there,
dectrode, rondd composite er metal trode con
‘Sting of stranded wires which may meckanally enclose
Inateral to improve properties stabze the arr pro
vide helding
ecto tanger a nofller metal electrode used i are
welding are eating and pasta spraying, made prin
pally of tungsten
face feo: the applton ffiler metal tothe ae se ofa
some
Jere wunbr an atitary,standardined value desig
tngthe fer coment ofan austenite Staines steel weld
trea shouldbe used i lace of percent frie or vo
Teme perce ee on x rect aneto-one replacement
oss, Sev the tes edition of AWS 442, Standard Proce
Adres for allating Magnetic Instuments to Measare
the Dela erite Content of Austen Stainless Stel Weld
Mera
filler meta: the tal or lloy tobe added in making &
‘wed brazed or soldered fit.
{ler meal brsing: he metal orally used 3 fle me
{alin brazing which basa iuldas above B40" (450°)
$d below the solids of the base etal
filer tl powder: ler metal in patel for,
filler meta supplemental: in eletrosig welding or ina
freking proces in which here fs an are between ane ot
hore consumable electrodes sed the workpece, a pow
‘er slid or composite mater tat Is nroguced into
the weld ther than the consumable elecode().
{ile weld 2 weld of spproxmatly angular eros se
tor oinng to srfacesapprosimately at ight anges
fo ech oer Ina lp jt tee Jt corer int
flow: an undesirable scotty. Se aso det.
us (woling/braing: 2 material used to dissolve, pre-
‘ret rfc the removal of exldes o other undest=
{ble srtace substances Ie may acto stabilize the ae,
Shied the molten pool, and may may not valve shield
ing aa by dacompostion,
‘ux cover etal bath dip braving and dip soldering
‘Royer af molten th verte moten ier meta bath
fi ative (SAW): 2M rom which the amount of ele
tients deposited in the weld metal dependent upon
the welding parameters, plmarlly ae woage
fal (SAW): 2x whieh peowdes ying elements
{nthe weld metal depot,
fs, evra (SAW): fx which wil notes asigicant
fhonge inthe weld metal composition when there I
Tange change in he are vltage
Jreband welding: 2 weldg technique in which the wed
ing torch or gun is dieeeted toward the progress of
welding
frequency: the completed number of eles which the 0
Siating bead makes in {minor other specified time
{frictional resistance (nthe butt-fusing machine
force-opposng movement diet friction i the mechan-
ism of the asng machine
uel gas: 2 gas such a acetylene, natural gs, hyrogen,
Propane, stabilized methylactylene prapadiene, and
ther fel normally ed wh oxygen none ofthe os)
fel poceses a for heating.
fused spray dest (ermal spraying) sl Sing her-
pl spray dept which subsequent beat to rales
ence within eel aod wih te subsets
asin: the coalescence of two plastic members by the
obination of eantoled heating and the application of
resure approximately normal to the interface between
‘hem
fusing gauge preset bya gauge pressure tobe
thserved bythe fing machine operator when fsing PE
pine ends. This s the sum othe theoretical Fsing pes
ure pls he drag pressure
{fusing machine operator person atned and qualified to
‘ryt singe poletylene (PE pipes and/or Retings
‘eg fsing procedure
{fisng procedure: document providing in detall he re-
{uted vals forthe but sng process o assure re
etait inthe bute fesingprocedre (PS o FPS)
fusion (sion welding: the meng together filer metal
{nd bse metal oo ase metal only to produce a Weld
fis face» surface ofthe base metal that wil be eed
turing weldingsion tie non-standard term for wad itrtce,
27 backing: 8 backing go.
blur tres orc welding typeof metal transfer in
Which mote filler metals trasferred ross hea in
Tage droplets,
arvove wel: wed made ina groove formed within asin
Sle member o nth groove between two members abe
Joined The standard types of groove weld are floes
a) square groove weld
(0) single Vee groove wea
(6) single devel groove weld
(@) single U groove weld
(@) single} groove weld
(single Aae-bvel groove weld
(@) single fare-Vee groove weld
(0) double-ee groove weld
() double-beve groove weld
double groove weld
(4) double} groove weld
(0) doubler bevel groove weld
(in). doube reves groove welt
ot sak eee the portion af the procedure where heats
allowed o sak into the ppes or engs ter the ead-up
{cles complete The hea stalk eye opine by reducing
tho pressure to hat required to maintain conse wit the
eater surface wthoue fore. The pipe ends continue
eating us the miimum het sol time scmplated
for he pps wall beng joined onthe nao bead see
Is ata per the standard procedure
hoa sook time: the time required to complete the hest
soak eye.
eater removal (well) time: peri of time from the
separation fhe pp o tng en fromthe beter au
face, removal a th heater ant ose ofthe carriage to
rng the molten pipe oe fiting ends together,
ator temperature: measured temperature onthe sce
othe eater were the peo ting cross section makes
seat-afcted zne: hat portion ofthe base metal whch
has not been melted, bt whose mechania! properties
ormicosvuctures have ben altered by the heat of wide
Ing or cating
Instantoneous power or eneray: As used for waveform
controled welding he determination of power or energy
sng the produto eurrent and voltage measurements
toad at rapid intervals which capture brie changes in
‘he welding waveform.
zr pressure: the amount ore pe pipe joint ares
‘required t9 make an approved but sing Jon. This
‘sed to cleulte the sing machine gauge pres, The
Interfacial pressure Is ten expressed as 2 range
[evample 60 pe to 90 ps (400 KPa to 600 kPa), and
the common practice I 0 use the mid-range (example
75 ps (S05 Pa) when making hee cleltons
Incerpass temperature: the highest temperate inthe
‘wel joie immediately prior to welding. or inthe cae
‘of multiple pass weds, the highest temperate inthe sc:
tion ofthe previously deposed weld meal, immediately
‘before the ext pss started,
Jolin: the junction of members orth edges of members
‘which re tobe fined o have been ine
Joint penetration: the distance the weld metal extends
from the weld face ino a joint, exclusive of weld
relforcerent.
eyo wlan: a ehnigue in which a concetrted het
source penetrates partially or completly through a wore
ec, forming bole (keyhole) athe leading edge ofthe
‘wed poo AS the heat sure progresses, he molten meta
Alsi behind the ole to form the wel bead.
{apo jnt between two ovrapping members in par-
allel planes
lap ar overtop the dance measured between the edges
of wo plates when overlapping frm the jolt.
layer stratum of wed metal consisting fone or more
‘ead. See Figures QG-1092.1 and Q6-10922.
‘ower transformation temperature: the temperature at
‘which austenite begins to form during heating
_macroexaminton the proces of obervng 2 pecnen
rose-section by te unalded eye, or aa specified lw
‘magnieation, with o without the use of moothing and
ching
net bend siete with ofa Bead formed a the interface
Between the pipe end and the hester surface during the
heating ee
mln: a technique of welding in which the intensity of
foncetated heat source is 0 adjusted that a wed pase
fan be produced from filer metal added to the lesing
edge of the molen el mt
to eransor ode (gas metaar welding: he manner
In which molten meal raves rom the end of» cons
able electrode tothe workpiece, See also shrt-cicuting
transfer (gas metakare welding); pulsed power welding,
lobar transfer (are welding); pulsed spray welding,
fad ery transfer ore wen).
nage: the volume of weld metal formed na spat san
(or projecion wld
ongniztion: 35 usd in tls Section, a organization i 8
‘manufacturer, contractor, assembler, aller, or rome
ter singe oF combined ety having eeponsiby for
operational contro of the mater ening methods usedInthe construction of components in accordance with the
fees, standards, abd speciation which reference hs
Seton
ocilnon: fr a machine or automate process, an alter:
tating motion elaine tothe drt of avo welling
‘rang or thermal pry dvi Se also weave Bead
very: non-standard term, uted in Section for surtt
‘ing Se also hard fcing and corosionresiant oer.
vray, corrasion resistant weld metal deposition of one
‘eam layer of weld metal to the surface of base ma
terial in an effort to improve the corrosion resistance
properties of th surface, This would be apled a evel
hove the minum desig thickness as nonstructural
fomponent ofthe overall wal thickness.
vray, hrdfcing weld metal depeston fone or more
layers of weld metal othe suraceofamateral inane.
to improve the wea restance properties ofthe sure.
‘This would be applied ata level above the minimum
Aesign thickness a 9 nonstroctaral component of the
‘veal wal kes
passage progression ofa welding surfacing opera
tion along joint weld depot or subseat. Theresa of
2 pus sa weld bead rly.
pass cover final or cap passes) onthe face of weld
pass wack past core minor surface aberrations and
[rprepare the surace or nondstortive testing
pes et: destructive method of testing that mechanically
Separates ap joint by peting
peeing the mechanical working of meta using impact
Bows
performance qualification: he demonstration fa welde’s
Grrweting operator's ably to produce wld meeting
prescribed standards
plese: hose materia Kod in Table QF-42.
plug weld a weld made ns eeu oF other geome
fay shaped ole (ike alot weld) in one member of 3
lip te pint ining that meraber to theater. The wal
‘the le mayor ay not be praia the ole maybe
aril or completly led with weld metal. (lt
‘welded hae or sot weld should not be construed as con:
Forming to this defintion)
polarity, reverse the arangement of ret current are
Welding Fade ith the work a the negative poe and
the secre asthe postive pol ofthe welding ac 357
‘ony for direc current lero postive
poor stright the arrangement of direct cuvent are
‘edi led in which the works the poste pole and
the ler the negative ple othe weding ar a 5)
ony for direct curen lectrode negative
potethyene (PE: pljlein composed of polymers of
‘tylene-
posta eat reatnen any heat treatment subsequent
to being
prtheving: the application of heat to an assembly ater
‘welding braing soldering thermal spraying or thermal
cing
posted heo easement any heat treatment subsequent
toweling
poseweld hydrogen bakeot holding a completed or par
tally completed weld at elevated temperature below
‘30% (4256) for the proce oflowing hydrogen ia
son fam the wel
powder: ler metal powder,
reheat curent: an imple or series of impulses that
occurs prior and separated om te welding cue.
preheat maintenance: practice of maintaining the mln
tum specified prebeat temperature, or some speed
ger teperatare for sme rogue tine nerval after
‘welding or themal spraying Heise or unl post weld
Tat reste nited
reheat tamperotre the minimum tomperatre inthe
‘Wed joie preparation mmadatly peor to the welding
‘rin the case of lil pass weld, the minimum em
pert nthe scion of the previously deposited weld
‘eal neditely prior to welding
prebating: he aplcton of heat othe base metal imme
‘itl before a welding or cutng operation to acleve#
‘Speiled minimum probes temperstare
pulsed power welding! an are welding proces variation in
‘ich the welding power sure s programmed fo cycle
between lw an hgh power Teves
rabbet joint: typical design is indicated in
Figures Q8-#62.1(2), QB-462'4, 0B-463.1(6), and
ques.)
retainer nenconsunble material metalic or nonmetal
(ihc sued to contain or shape molten weld metal See
Sr backing.
seal weld any weld desged primary to provide a spec:
fe degre of wahess agaist Teaage
seam weld: continuous weld made between or upon
‘verlaping members in which coalescence may Start
fn oar on the fang surfaces, may have proceed
ftom the surface of ane member. The continuous weld
nay costo single weld bead or 3 sees of overlap
ing pot weld Seu als resstance welshorreuling transfer (gae meta-or welding): metal
‘wane a which molten metal from a consumable ec-
‘odes deposited daring repeated shortcuts, Se al
lobular ans aoa prey ons.
ingleseled on: al welded from one sie only
single weled lap jon np join in which te vertapped
flues of the members tobe oie are welded slong he
flge of one member en
slog inclusion: nonmetallic solid material entrapped in
‘weld metal or Between weld mata and bse mel
Specimens ts pcinen
Spot wel: a weld made between oF upon overlapping
embers in which coalescence may start and occu ot
‘he fying surfaces or may proceed fom the outer surface
fone member. The weld cress section (plan view) i=
!nproximatlyeelr.
spray eansfor (a welding meta anor in which ma
tenmetal fom a consumable electrodes propedal
‘cos the ar in sal droplets
‘spray fuse ther sprayng ecg which the de-
sts ebeated wo fce the particles and form ametallur
‘eal bond withthe substrate
Standard Welding Procure Speciation (SW: weld
ing procedure specication. pushed by the American
Welding Society, that is made avaiable for production
‘eding by companies o nid without frter qua
eatin, and that may be sed in Code pplstons in a
cordance with the restrions nd limiatons of rile V.
stringer beads 3 wld bead Formed without appreciable
‘weaving
surface temper bad rnforeing ler: asec of topo
bead welding in which ane oF mar ayers of wel metal
reapplied on o above the surace ayers fa component
8andare used o modi the properties of previously depos:
ited weld motl or the beatalfected zone. Sorte Iyer
may cover asurace oF only the perimeter ofthe weld
sarfcig: he application by welding bralng or thermal
spraying of ayers) of materi to asutace to aban de
Shred properties or dimensions, opposed to eaking 2
Jott
tee oie (7: 3 joint between two members located ap
proximately aright angles to eah other n the orm ofa
{emper bead welding: awe bead paced at spe cs
‘nn oat the surface of weld forthe purpose oat
Ing the metals propertes ofthe beat afeted 2002
for previously deposited weld metal. The besd may be
Shove, fish with or below he surrovnding base meta
Surface. If above the hase metal surface, the beads may
over all or only part ofthe weld depose and may ot
nay not be removed following welding
test coupon: 2 weld or braze assembly for procedure ot
peeformance qualifetion testing. The coupon may be
Sy product rem pate, pp, ube ete nd maybe let
‘wed overlay deposed weld metal ee
tes coupon fing: 2 buted laste ts jon hat is
made to qualify a butefsig procedure o operator
‘est specimen sample of ter coupon for speci test
‘Thespecimen may bea bend tet tensln test ipa test
homie ana, macrotest ete specimen may be 3
fomplee test coupon, far example ralograpi texting
or small diameter ip tension testing
‘heoratia fing pressure: the pipe area multiplied by the
Interfacial pressure amd divided by the atl effective
Piston rea ofthe ute sing machine,
thermal euting (70 group of eng processes that
vers or removes metal by load melting brain oF
‘aporang ofthe workpieces.
‘roa cual fof fle the shorts aiatance rom he root
(of let wld to ts ace
roa, ftv (of fl te minum distance fom the
fillet face, mins any convey tothe weld root. Inthe
‘ase o filet welds combined witha groove wel the Weld
‘ot ofthe groove weld shall be sed
thro, theoretic! (fle) the distance fom the bein-
‘ing of theft ret perpendicular tothe hypatns of
the lagest ihe tangle that can be Inseribed within te
‘rosssection ofa filet weld. This dimension bared 00,
‘he assumption thatthe rot opening i equal to 2a
underut: a roowe mele int the base tl adjacent to
the weld te or wold root and Ie unfled by weld meta.
upper tansformation temperature: the temperature at
‘whlch transformation ofthe fer to sustenie le com
Peed uring heating
sabi a measure of the lative ease of pplication ofa
ler metal to make sound weld or braze [ent
reform controled welding: A welding racess mois:
tion ofthe vlage and/or curren wate shape to contra
‘haracteristis suchas droplet shape, penetration, wet-
‘ang, ead shape or transfer mode(s,
weove bead for 3 manual oF semiautomatle process,
Weld bead formed sing weaving See also slain
waving: 2 wong techaigue in which the energy source
IGoxcllte transversely as 8 progresses along the weld
path
wel loan coalescence of meal or nonmetal pro
ced ether by heating the materi to the eldng tem
perature with oF without the application of presse
by the apptieaon af pressure alone and with or without
the ae of filer materi.eid boa: weld depot esting fom a pass. Se aso
[Ringer bod and weave bead
eld fc: the exposed surtace ofa weld onthe sie from
(which welding was done
eld infos the inerfae between the weld metal and
base met fusion wel
weld meta metal na fusion weld consisting of ht por
lon ofthe base metal and filler metal melted during
‘walang
veld reinforcement: weld metal onthe face oF rot of
froove weld in excess of the metal necessary forthe
Specied weld sx
weld sie for equal filet welds the eg lengths of the
Target isosceles right rangle which canbe inscribed
‘win the fet weld cess section
weld ie; or equ eg le welds tel lengthsaf the
Targest right tangle which canbe inscribed within the
filet weld ros soto,
eld sine: groove weld the depth of chamfering plus any
penetration beyond the chartering. resuting inthe
Strength carting dimension of he weld
wed etogenous a fuslon weld made without ler met
welder one who performs manual or semiautomatic
welding
welding operator: one who operates machine or automatic
welding equipment.
lng. or stud (SW) an arc welding process that uses 20
Bre between a metal stud or similar part and the other
Srorpnce. The proces ised without le met th
Sriwthou shielding pa or fox, with or tout partial
‘hsding from a era or graphite ferele surrounding
thestud and wih te apleation of pressure ae hey
Ing srtses ae sueenl hated.
welding, automatic welding with equipment which er
forme the welding operation without sjustment ofthe
nro by 3 welding operator. The equlpment may
‘nay not perfor the lading and unloading o the work.
See also machine wena.
welding, consumable guide electrasag: an elctroslag
‘welding proces vation which le etal supplied
Ippan electrode and te puding member
welding difeson (DFW): a solid-state welding process
producing weld between mail layers ofsbeet plat
bathe appiation of mechanical pressre at elevated tem
perstur with no macrosope deformation or ete me
‘on ofthe work pees Asolié ler mea maybe inserted
betwoon the ying sacs.
welding, electragas(EGW) an are wsing proces that
tees amare between continuous Mer metal electrode
tnd the weld pool, employing approximately vertical
‘alin progresson wit etainers to confine the weld
teal. The process used with o without an externally
‘Supplied sllding ga and withouthe aplication of res
Sure Shleldng forge with sold or metal-ored electo-
dese abained from gs or gas ture shllding for
‘se with Nut-cored electrodes may or may note obtained
from an early supplied gato gas mature
welding, electron beam (EBW}: welding process that
Droduccs coalescnce with a concentated beam com-
posed priniarlly of high velockyeecrons, impinging on
the joint The proces e used without shelding gos and
‘without he aplication of pressure.
welding, electro (ESW: 4 welding process producing
Cealescece of metal with mote lg Which mls the
ler metal a the srfaces of the work tobe welded. The
‘molten weld pools shieed by this lag which moves
long the fl ros section ofthe jin Welding bro
[reses The process is inte by an ar which heats
the sing Thea i then extinguished ad the conductive
Slag is inane in olen condition by eitance
to electric current passing betwen the electrode and
the wore See elecroslag welding electrode and eons
se ple oectrosiag weld.
welding facored ore (FCA: a gas mtaare welding
process that ses an arc between acontnaos filer met
lctrode sd the welé pool. The process i wed with
helding gp fom ax contained within the tbulr eke
trode, wth or without adiina shielding fom an exter-
nally supplied gas, and without the application of
pressure
lng, riction (FAW): Sli state welding process that
oduct eld unde eampressive ores cota of work
ces rotating or moving relative to one anther to pro
{dice heat ae plastialy displace material from the
fying src.
eli, riction stir (SWp variation orton welding
productng a wel by the ction heating and partie mater
Fl lplacement used by aap eating ol teaver
Sing the we fe
welding icon, Inertia ond continuous deve: processes
Ud types ton welding (sold stat weg process)
‘wher coalescences produced afer beating obtained
Tom mechanically induced sliding motion between ru
bing surfaces held together ander pres. fnera weld
Ingutives al ofthe Knee energy stored im 3 reveling
Aywboe spindle system. Continuous dive triton weld-
Ing tiizes the eneray provided by 2 continoous drive
source sich ara leet or hyautie motor.welding gas mea-ore (GMAW): an ar welding proces
{hat uses a ae between continuous ler meal elec
‘woe abd the weld poo The process ruse with sed
{ng fram an externally supplied gos and without the
appleaton of pressure
eldng, es metas pled ray (GMAW-P): avariton
the gus metal-ae welding proces whch the poe is
bed resulting in tansfe f the meal across the arn
‘Spray mode. Sex ao pls power welding
welding gas metab-reshorecircuting ar (GMAW"S) 3
‘alton ofthe gas metre welding process in which
the consumable electrode ls deposited during repeated
‘hort cite Se alo shoring trans,
elng. ges trgston ar (CTAW): an arc welding process
‘hich produces coatscence of tale by heating them
than are Between a tungsten (nonconsumable elee-
‘roe and the work Shing obtained fom a ae oF
ss mixture, Pressure may or may not be weed and ile
‘etal may or may not be use. (This process has sme
{mes been called IG welding nonprefered term).
wel gos ungstn-re pulsed are (TAM: a varion
th as tngatn-are welding proces in vehich the cur-
ents pulse. Se aso ped powering.
welding, hy welding in which two or more welding
Drocertes ar usu inthe sane weld poo
wel bvi proces separation: the distance between
‘ch welding proces as speed in the WPS.
woking hybrid, process aquence the ode ofeach weld
Ing process wih respect othe direcon of ave.
welding Induction (14: a welding proces that produces
foalesceno of metas by the est tained rom reitance
ff the workpieces to the flow of duced high requency
‘welding curren witha without the aplication of pres
Sure. The elect ofthe high-frequency welding cotrent
toconcentate the welding beat tthe dered Toston
welding, laser beom (LBU): welding process which
produces coalescence of material wth the heat obtained
From the application of aconcentated coherent ight beam
fnpnging upon the members to be jined
welding, machine: welding with equipment tht has con
‘Woe tat an be adjusted by the welding operator, 3
usted under the welding operator's direction response
to changes inthe welding conditions. The torch gn of
‘leerode holder Is beld bya mechanical doce See aso
eldng, eam
welding, manu welding wherein the entire welding op
‘rations prfrted and conta by hand.
welding, aul gas (OF) group of welding processes
thich produces coalescence by heating mater than
Ciel gas Mame or flames, with or without the applica
thon of pressure, and withar without thus of filer meta
welding, plasma-are (PAW: an are welding process which
Produces coalescence of metal by heating them with 3
fonstricted are between an electrode andthe workpiece
(transfered arco he electrode andthe constricting
oznle(nontranaerred ac). Sheldig is abained fom
the hot fonized gs sung fot the trch orice which
maybe supplemented by an aula source of being
‘as Shielding gas may be an ine gat oF a miture of
ase, Presse may of may ot be use an filer metal
ay or may not be supple.
welding, projection (PW) a resistance welding process
that produces ealescence bythe nest obtained from the
resistance of the fw of welding cure. The relting
‘Wold are localized a predetermined points by projec
tons, embossments,or intersections, The mele tobe
Joted lap over eachother
Welding, resistance (RW): group of welding processes
that produces coalescence ofthe fang srlces with the
‘neat obtained from resistance ofthe workpieces tothe
flow ofthe wong cuenta cuit which the work
lces aoa part and bythe application of presse,
welding resistance seam (RSEW): resistance welding
proces that produces wel tthe fying surfaces of
verlaped pares progresively along length of aot
‘The wel maybe made with velapping weld uggs 2
continuous weld nugaetor by forging the Jon
flow ofthe welding cent
welding, resstonce spo (RSW) a resistance welding pro
ess that prdcesa wld a he ayng surfaces sent
Uy theheat obtained fom resistance ta the aw of welding
trent hough he worpnes rom electrode that serve
to concentrate the welding current and pressure tthe
welding, resistance stud a resistance welding process
Wherein coalescence ts produced bythe heat obtained
feom resistance to elec current atthe interface be-
tween the stud andthe workpiece, unl the surfaces
bond are propery heated when they ae brought o-
phar onder pressure
welding, siutomati ar: ae welding with equipment
‘whic contol only the filer metal fe The advance of
‘the welding is manually conta
welding, shielded meta-ore(SMAW): an are welding
proces with an are between 2 covered electrode and
{he weld poo. The proces i sed th shlelding from
‘the deconpastion ofthe electrode covering without the
application of pressure and with filer metal from the
slecrode
welding, stud genera term for the joining of metal std
(or similar pare toa workpiece. Welding may be accom
plished by ae resitaen reton or oter stable ro.
ss wit oF without exter ga hing