You are on page 1of 4

Installation Manual

for Ceiling Mounted Type Heat Recovery AHU

HJK-R Series

Attention:
Please read this manual carefully before installation.
Product Implementation Standard: GB/T 14294-2008

Beijing Holtop Air Conditioning Co., Ltd

(15BZ20000000B)
Version No.: AW202105
Contents

Safety Instructions 2

Operating Principles 2

Installation 3

Operation 3

Maintenance 4

Disclaimer 4

Safety Instructions

HJK-R series ceiling type fresh air AHU has been tested for being able to deliver excellent performances when it is
complying with its design standards. As the AHU may request to use of pressure devices, motor wiring, other relevant
AHU section devices etc, installation should be handled by qualified technicians and engineers.

Please strictly follow the instructions marked on AHU labels and installation manual, and be aware of below and other
applicable instructions:

• All installers must follow the instructions of relevant safety code.


• Be careful when transporting, lifting or installing, avoid personal injury and equipment damage.
• Do not enter into the AHU when the fan is working. Cut off the power, plug off the fuse and carry it along before
entering into the AHU.

Operating Principles

1. HJK-R series AHU is equipped with high efficient cross-flow heat exchanger, that designed and developed by
Holtop, is able to recover indoor air heat when outside air and return air go through the heat exchanger.

2. The air handling unit is without itself refrigeration/heating plant. All cooling and heating sources are provided by
the outside chilled/hot water which is powered and circulated by the water pump in the water coil. The fresh air
will first pass through the air to air heat exchanger, and then to water coil, and be sent into the room. When the
air passes the water coil, it will be treated by cooling/dehumidifying/heating etc.

3. The filters inside are able to filter the particles, in order to make the air more clean.

-2-
Installation

1. Check the AHU appearances carefully before installation.


2. Chilled(hot) water flows from the lower side to the upper side of water coil. The lower hole is the water inlet pipe
and the upper hole is the water return pipe. There are two pipes for condensation drainage under the AHU base
(Only 1 when it is with enthalpy air to air heat exchanger). For condensate draining, water seal is required for the
drain pipe. To consider AHU negative internal pressure, please make U shape connection as per the following
sketch-map. (See Diagram, “Condensate U shape pipe sketch map”)
3. All the air duct/water pipes connected to the AHU(except the condensate pipe) shall be with adjustable damper/
valve to control the airflow/water flow, and to cut off the air/water flow when maintenance. The cooling/heating
medium inlet/outlet pipe and air ducts outside the AHU shall be with good thermal insulation.
4. The AHU shall be installed flatly and steadily, not bearing any weight of the air duct. The AHU air inlet/outlet shall
connect to the air duct with flexible connection. The bottom base shall be perpendicular to the hanging rod. (See
Diagram, “AHU hanging rod installation”)
5. For the wiring works, open the wiring terminal box on the supply/exhaust fan section, find the wiring diagram
and complete the wiring, power on and start the fan to check if the fan wind wheel is rotating complying with the
instructional arrow sign on the fan case.
6. To protect the motor, appropriate thermal relay needs to connect with each fan power line separately in the
control box.
7. For maintenance purposes, reserve space no less than 500 mm for the left and right sides of AHU.

Nut

Gasket
120

AHU Base
60

Gasket
Spring Washer
Nut

Condensate U shape pipe sketch map AHU hanging rod installation

Operation

1. HJK-R series ceiling type heat recovery AHU is easy to operate. User only need to power on the fan and pump.
The recommended chilled water flow speed inside the coil is 0.5m/s ~ 2m/s, and 0.5m/s ~ 1m/s for hot water.
Please clean the water circuit and use air release valve to completely exhaust the air inside the coil.
2. When the ambient temperature is below 0˚C, and if the coil is without hot water supply, please drain all the water
inside the coil or the pipe, to prevent the coil/pipe from frost crack.
3. This unit is designed for inlet chilled water 7˚C, and inlet hot water 60˚C. The water shall be clean and its pressure
shall be no more than 1.2Mpa.
4. Before starting the fan, clear the pipes completely and leave no clog inside the pipe, check the pipeline and all
the valves’ working conditions.
5. Power on the AHU and adjust the air damper in the ventilation system, to keep the AHU fan motor operating
current does not exceed the nominal current under AHU rated airflow. Operation with airflow over the rated value
is not allowed. Please refer to the fan motor’s nominal current on the AHU label.
-3-
Maintenance

1. Clean the filters regularly. First wash the filters with soapy water, then rinse with clean water. Re-install filters into
AHU after it completely dry. If washing is inefficient, replace the filter material or the whole filter.

2. Total maintenance is required after 2 or 3 years of operation. Take the coil out, vacuum the dusts on the coil
surface, and wash the fins by compressed air or water.

3. Check the tightness and thermal insulation of the air/water piping, take action if there is any leakage.

Disclaimer

Any personal injury or equipment damage caused by improper installation or malpractice, we as the equipment supplier
shall not take any responsibility.

The sheet of hazardous substances and amount in the AHU

Hazardous Substances

AHU Polybrominated Polybrominated


Plumbum Hydrargyru Cadmium Chromium VI
Biphenyls Diphenyl Ethers
(Pb) (Hg) (Cd) (Cr(VI))
(PBB) (PBDE)
Injection molding parts (Outer panel) X O O O X X
Motor and relevant parts X O O X O O
Thermal relay O O O O O O
Metal structure parts (Metal plate,
X O O X O O
screws)
Wires (power wire, connection wire) O O O O O O
Steel pipe O O O O O O
Package (sponge, printing labels) X O O X O O

• This sheet is made as per regulations of SJ/T 11364.


• O: The amount of hazardous substance in all homogeneous materials of this part is less than the limitation of GB/T 26572.
• X: The amount of hazardous substance in at least one homogeneous material of this part is more than the limitation of GB/T 26572.

Beijing Holtop Air Conditioning Co., Ltd.


Production Base : No. 5 Yard, 7th Guanggu Street, Badaling Economic Development Zone,
Yanqing District, Beijing, China

International marketing center


Address: Room 2101, Headquarters Center Building No.25, Tian An Hi-Tech Ecological Park,
No. 555 Panyu Ave, Panyu District, Guangzhou, China

Tel: 0086-20-39388201 Fax: 0086-20-39388202


Website: www.holtop.com E-mail: info@holtop.com