HJK-R Series
Attention:
Please read this manual carefully before installation.
Product Implementation Standard: GB/T 14294-2008
(15BZ20000000B)
Version No.: AW202105
Contents
Safety Instructions 2
Operating Principles 2
Installation 3
Operation 3
Maintenance 4
Disclaimer 4
Safety Instructions
HJK-R series ceiling type fresh air AHU has been tested for being able to deliver excellent performances when it is
complying with its design standards. As the AHU may request to use of pressure devices, motor wiring, other relevant
AHU section devices etc, installation should be handled by qualified technicians and engineers.
Please strictly follow the instructions marked on AHU labels and installation manual, and be aware of below and other
applicable instructions:
Operating Principles
1. HJK-R series AHU is equipped with high efficient cross-flow heat exchanger, that designed and developed by
Holtop, is able to recover indoor air heat when outside air and return air go through the heat exchanger.
2. The air handling unit is without itself refrigeration/heating plant. All cooling and heating sources are provided by
the outside chilled/hot water which is powered and circulated by the water pump in the water coil. The fresh air
will first pass through the air to air heat exchanger, and then to water coil, and be sent into the room. When the
air passes the water coil, it will be treated by cooling/dehumidifying/heating etc.
3. The filters inside are able to filter the particles, in order to make the air more clean.
-2-
Installation
Nut
Gasket
120
AHU Base
60
Gasket
Spring Washer
Nut
Operation
1. HJK-R series ceiling type heat recovery AHU is easy to operate. User only need to power on the fan and pump.
The recommended chilled water flow speed inside the coil is 0.5m/s ~ 2m/s, and 0.5m/s ~ 1m/s for hot water.
Please clean the water circuit and use air release valve to completely exhaust the air inside the coil.
2. When the ambient temperature is below 0˚C, and if the coil is without hot water supply, please drain all the water
inside the coil or the pipe, to prevent the coil/pipe from frost crack.
3. This unit is designed for inlet chilled water 7˚C, and inlet hot water 60˚C. The water shall be clean and its pressure
shall be no more than 1.2Mpa.
4. Before starting the fan, clear the pipes completely and leave no clog inside the pipe, check the pipeline and all
the valves’ working conditions.
5. Power on the AHU and adjust the air damper in the ventilation system, to keep the AHU fan motor operating
current does not exceed the nominal current under AHU rated airflow. Operation with airflow over the rated value
is not allowed. Please refer to the fan motor’s nominal current on the AHU label.
-3-
Maintenance
1. Clean the filters regularly. First wash the filters with soapy water, then rinse with clean water. Re-install filters into
AHU after it completely dry. If washing is inefficient, replace the filter material or the whole filter.
2. Total maintenance is required after 2 or 3 years of operation. Take the coil out, vacuum the dusts on the coil
surface, and wash the fins by compressed air or water.
3. Check the tightness and thermal insulation of the air/water piping, take action if there is any leakage.
Disclaimer
Any personal injury or equipment damage caused by improper installation or malpractice, we as the equipment supplier
shall not take any responsibility.
Hazardous Substances