Content of O&M Manual
1 Instructions….说明
1.1 General safety instructions….整体安全指南
1.2 User instructions ……… 用户说明
1.3 Technical Data … 技术数据
2 Description of system….系统描述
3 Operating Instruction…. 操作指南
3.1 Installation 安装
3.2 Prepairation for start up 试运行
4 Maintenance Instructions….维护指南
4.1 Maintenance, Clearances……… 维护,故障排除
4.2 Consumbles…………消耗品
5 Operation and maintenance of bare vacuum pump 泵头运行维护指南
6 Purchased Parts…… 外购件
7 Drawings, Lists, Diagrams, etc… 图纸,清册,图表
7.1 General arrangement drawing… 总装图
7.2 P&ID drawing…… 流程图
7.3 Foundation drawing……基础图
7.4 Terminal wiring diagram……接线端子图
7.5 Logic drawing…… 运行逻辑图
7.6 DCS IO list……DCS IO 清单
7.7 Instrument list…… 仪表清单
1. Instructions 说明
ο Must obey the regulations for maintenance period and for replacing parts.
该设备运行中存在危险电压,任何错误操作都可能导致人身伤亡及财产损失。
必须严格遵守本章及产品标签上有关说明。
ο 必须由有资格人员进行维修维护。
ο 维修维护前必须切断设备电源并接地。
ο 维修过程中只能用被批准认可的零部件。
ο 要严格遵守有关检修的周期及更换零部件的规定。
GENERAL 概述
MODEL NO.型号 2BW4 252
NO. OF STAGE 级数 1
PUMP RATED SPEED 泵额定转速 740 r/min
PERFORMANCE 性能
CAPACITY IN DRY AIR AT SUCTION PRESSURE 25.5 kg/h
OF 15 Kpa(a) AND CW.TEMPERATURE 43 ℃
进口压力 15 Kpa(a),冷却水温 43 ℃的抽干空
气量
DISCHARGE PRESSURE 排气压力 atm
ACCESSORIES 附件
MAIN MOTOR 主电机
TYPE 型号 HJN1 315S-8
Votage/Ph/frequency 电压/相数/频率 400V/3Ph/50Hz
Rated Power 额定功率 55kW
Rated Current 额定电流 108A
Ist/In 堵转电流/额定电流 7
HEAT EXCHANGER 换热器
a. TYPE 型号 FP 10
b. FLOW OF COOLING WATER 冷却水流量 18 m3/h
c. HEAT TRANSFER AREA 换热面积 5.44 m2
d. TOTAL HEAT LOAD 换热量 71.34Kw
2 Description of system 系 统 描 述
外形图 G320313
流程图 G320314
基础图 G320315
该闭环真空泵主要包括泵(010)和三相电机(030),分离器(080),换热器(130),
底盘,和管线。
压力开关(012)的作用是在预先规定的压力下打开系统入口蝶阀(161)。
吸气管路上配有冷却喷嘴,经过换热器冷却的工作液通过喷嘴进入泵口,与吸入泵
内的饱和气混合,使饱和气内的水蒸气迅速冷凝,并一起进入泵内。
真空泵运行过程中,来自凝汽器中的空气通过管线,蝶阀 (161) 以及止回阀 (163)
被吸入 NASH 泵(010)。
止回阀(163)用于防止泵突然停止时,空气返流回系统。
空气携带部分泵工作液,从泵通过排气管线排至分离器(080)。在分离器内,空气
与水分离。空气被压缩至大气压力, 通过法兰口 N2.2 排出系统。
分离器(080)配带磁浮子液位计(230),液位开关(231L,231N)和溢流管线。
通过法兰接口 N3.3 和电磁阀(221),新鲜水补充至分离器和泵内。
分离器内液位由液位计(230)指示,液位开关(231L, 231N)控制电磁阀的动作。
当液位低于低位置时,液位开关(231L)发出信号,打开电磁阀开始补水,直至液位达
到正常液位时,液位开关(231N)控制电磁阀关闭。
溢流管线用于溢流多余的水以保证系统内正常的液位。分离器的排空阀(241)用于彻
底排净分离器(080)的水。真空泵(010)通过排空阀(249)排净水.
工作液用于形成泵的水环。工作液通过管线,自分离器(080)流入换热器(130),
冷却后通过管线返回泵。在此过程中,压缩产生的热及随被抽气体带入的热被释放掉。
工作液温度及压力分别由管线上的温度计(440,420)和压力表(480)监测。
3 Operating Instruction 操 作 指 南
3.1 Installation 安装
The closed circuit vacuum pump is including all inner piping works and base frame showed in the
general arrangement drawing. The pump must be lifted by the 4 hanging rings welded on the base frame,
other hanging points, such as the inner piping etc., are not permitted. Rapid moving is avoided during
lifting and launching.
The foundation shall be made of concrete or steel construction. For the load capacity, the unit
weight must be considered.
After installation, the bolts must be re-tightened. Re-aligning motor and pump couplings to assure
the co-axial. Because there must be slight deviation during transportation. Wrong alignment will cause
uneven running and coupling damage. The clearance between the 2 coupling halves must be even, and
co-axial, the maximum permitted deviation is 0.1mm. The real deviation must be measured and recorded
twice per year.
After checking all the bolts in the right position and realignment, the bolts may be loosed, tightened
if necessary. No out tension from the piping connected with the pump is permitted, these piping works
must be properly supported or hanged.
For the vacuum pump, outside vibration and shock, such as that from the workshop, must be
removed.
When making installation and welding work around the pump, the pump must be protected. All
unconnected opens must be protected with caps, so as to prevent from outside contamination ( i.e. tools,
residual welding rod, welding residue, welding ball, dirt etc.) Especially when welding balls enter the
pump, parts in the pump shall be damaged.
Supply piping connected with the following flanges (see connection list for size) :
N1.1 Gas inlet of closed circuit vacuum pump
N2.2 Gas outlet of closed circuit vacuum pump
N3.3 Filling & replenishing of operating liquid
N4.6 Total drainage
N5.0 Cooling liquid supply
N6.0 Cooling liquid discharge
Before connection, all piping areas in the site must be cleaned, or add starting filters at pump inlet
connection, during first few weeks.
Local management department’s stipulations must be observed, when making electrical wiring and
connection.
该闭环真空泵配有如外形尺寸图所示的所有内部管线和底盘。只能通过焊接在底盘
框架边侧的 4 个吊环起吊设备,不允许通过内部管线或其它点起吊。提升和降落过程中,
应避免急速移动。
基础用混凝土或钢结构制作。其承载能力与机组重量相符。
机组安装好后,需重新调整并上紧螺栓。重新调整电机和泵,保证同轴,因运输过
程中可能会出现轻微的偏差。对中不正会导致不平稳运转而损坏联轴器。整个联轴器凸
缘圆周上间隙必须保持一致,并且同心,最大允许偏差 0.1mm. 实际偏差每年测量并记
录两次。
在检查所有螺栓连接点是否准确安装到位及调整维修后,螺栓可能松动,如有必要,
将其上紧。同泵相连的管路不应施予真空泵张力及应力,这些管线应作始当支撑或悬吊
以防止将其载荷传递给水环真空泵。
外部颤动和震动,如从厂房传给真空泵的,应加防震板消除。
在泵周围进行安装,焊接等工作时,一定要对泵作适当保护。所有尚未连接的接口
都应加盖保护,以防外部污染物(如工具、残余焊条、焊渣、焊球、灰尘等)进入泵中。
因为这些物质在泵运转时可能破坏泵内零部件。
供排管线将与以下法兰连接(尺寸见接口表):
N1.1 闭环真空泵气体入口
N2.2 闭环真空泵气体出口
N3.3 工作液供应、补充
N4.6 总排空
N5.0 冷却水入口
N6.0 冷却水出口
连接以前,工厂安装现场各管段都应清理,或在开车运行的头几周内在泵入口设置
过滤器。
所有电气接线及接口都应遵守地方管理部门的有关规章。
3.2 Prepairation for start up 试运行
3.2.1 Preparation
Check and assure all installation for pump is right, according to flow diagram and general
arrangement drawing.
Before first start up, pump shaft must be turned by hand or other proper tools.
Check pump shaft rotary direction by switch on and off quickly, make sure that it is the same
direction as the arrow on the pump. Before this work, you must loose the stuffing gland, and tighten it
again.
Discharge port (N2.2) must be opened completely, and also open the shut-off valves for pressure
gauge and pressure switch , and the drain valves must be closed.
Working liquid must be supplied to N3.3, and cooling water to N5.0.
It’s very important that, clean the pump with clean water (soft water), before first start up, or
shutdown for more than 4 weeks after start up.
3.2.2 Filling the Pump
Fill the closed circuit pump from connection N3.3 (You can speed up the filling by opening the
bypass valve 242, if necessary), and then the water fill the pump through piping, heat exchanger (130),
and piping. Water level high up, and when the auto make-up valve stops filling, filling work finished.
The level in the separator is monitored by the level indication (230), check the level after about 5
minutes (now the balance reached).
3.2.3 Start up
When motor switched on, and cooling water valve and system inlet valve opened, vacuum pump is
running, and after water ring established in the pump, the system turns into working condition.
3.2.1 准备
应根据流程图和尺寸图进行检查以保证管路和真空泵在整个布局中的安装是正确
的。
在第一次启动泵前,一定要用手或其他合适工具盘动泵轴。
泵轴旋转方向要通过点动电机进行检测,以保证与泵上所标箭头方向一致。进行此
工作前,应先稍微松动填料压盖,然后再紧住。
排气口(N2.2)必须全开,另外压力表(012、480)和压力开关(471)的截止阀也
要打开,阀(241,244,245,249)一定要关闭。
工作液一定要供至 N3.3 接口,冷却水供至 N5.0 接口。
第一次试车前,开车后约 4 周及长时间停车后,真空泵应用洁净水(软水)进行清
洗, 这一点非常重要。
3.2.2 泵的注水
通过法兰接口 N3.3 向闭环真空系统内注入工作液(如果需要,打开(242)旁通阀,
可加速泵的灌注)。同时通过管线、换热器(130)及管线向真空泵充水.
当分离器内水位提高,电磁阀停止水的供应时,充水过程完成。分离器内的水位 可
通过液位计(230)监测,大约 5 分钟后重新检查水位(此时平衡已建立)
。
3.2.3 启动
启动电机(030),打开冷却水阀及系统进气阀, 真空泵即投入运行,当水环建立起
来后,系统进入工作状态。
3.2.4 停车
1)停真空泵(010)的驱动电机(030)。
2)关闭吸气入口阀门(161)以保证规定的启动状态。
3)关闭冷却水阀。
停车后,泵(010)和分离器(080)之间通过工作液管线(260、280)自动实现液
位平衡。当泵需要放液时,所有相关放液出口必须打开。
注意:如果要长时间停车(1 个月或更长时间),则必需将泵内水排空。
4 Maintenance Instruction 维 护 指 南
4.1.1 经常性的,至少每周一次
1).工作液温度 TI (440、420),温度升高表示换热器(130)受到污染,根据所附换热
器的维修说明清理。
2). 真空泵入口与凝汽器的压力差。该压差升高表明吸入管线上某处可能阻塞。
3). 分离器(080)的液位 LI(230), 液位显示在最高和最低标线之间,如果显示高于
最高值,表明溢水管线有问题。 如果低于最低值,表明补水电磁阀不起作用或没有水供
应。
4.1.2 至少每月一次
1). 工作液压力 PI(480),其显示应与 NASH 真空泵有关试验证书的数据相吻合。
2) 真空泵(010)和电机(030)的运转平稳性,超常的振动、噪音或轴承温度的升高
表明联轴器的对中不好。
3). 泵(010)的填料压盖处的状况:少量的水从填料函溢出以保证有足够的冷却。
细节参阅真空泵的使用说明书。
4.1.3 每年一次,大修
1). 排净系统内液体,并用干净水冲洗。
2). 检查所有阀门、各控制阀、开关及仪表,确保功能正确。
3). 检查所有过滤器(如果有),清理干净。
4). 检查换热器(130)状况。
4.2 Consumbles 消耗品
4.2.1 Lubricants information 润滑信息
4.2.2 packing 填料
The packing should be changed every 1 year.
填料需要 1 年更换一次。
5 Operation and maintenance
of bare vacuum pump
泵头运行维护指南
AGardner Denver Product
ELMO®-F Rl~i\:A~*
.-. \~L
:::!LJ ..1.
\
!I.L
r
""I r-
T ~
~
~
"'"
'---'
Contents §~:
General .fIlt
1.1 Safety-related terms 1.1 ~~*ift
1.2 General safety information 1.2liliJfl~m~
1.3 Transport 1.3 fi\~
1.4 Storage 1.4.:r¥
Description mlt
2.1 Mode of operation, mechanical design 2.1 I ft:1rJ:t:;•.mJlltii!i~
2.2 Operating liquid (general) 2.2 Ift:ti
2.3 Connections (general) 2.3111~
2.4 Shaft seal 2.4~~
2.5 Protection against cavitation 2.5 Et:t!RWt?
InstaUation $:.
3.1 Safety advice 3.1 ~~i1ItiJ(
3.2 Mounting 3.2~~
3.3 Connections, pipes 3.3 JfX~,1f§
3.4·~~
3.4 Final measures
3.5~
3.5 Commissioning
Operation iii\:
4.1 Safety advice 4.1 ~~iliJ(
4.2 Starting up, shutting down 4.2iS!iM'*
4.3 Prolonged shutdown periods 4.3*M~$
Maintenance ft.
5.1 Safety measures 5.1 ~~ntni
5.87}-MOO.$flf H
J.!gm
5.8 Drawings. parts list
Appendix
IIftjJt
6.1 Technical date
6.1 tt*~~
6.2 Supplementary instructions 6.2 l'ft1Jo1.!tHJ.!
WARNING Wfi
.& The machines with the relevant drive motors consist of .& ii(ii.@mT1t1f*Jtfm:ii.(JCJI.ik*~ap·
equipment for use in industrial systems including heavy current
lIitlk:T I fF*f1:,t-fJlJ~t£@JD;ff tfil-Mtflit,~ ~ a<Jitfi:
installations. Depending on the operating conditions, Particularly
tf~~lt Fjfi:tJCJA:!it-mtfYl Mf!Il~·
where dangerous media may be used, Improper handling could
lead to severe personal Injury or property damage.
Those responsible for safety of the Installation must therefore ~JIt,fA.ii.:1(~(JCJAM.~~Jn.~:
ensure that
• oniy qualified personnel are entrusted with work on the - f.lftilfJf.AJ.lUlfFii(ii.,
machines,
• these persons always have at their disposal the supplied -- .fFAM.t£.fFii(ii.fIit,~\@ifJl.l!iflitftjJII.IU1L
operating Instructions and other product documentation .-fjttJCJ{!m~IY!.:lnIlJt'E.xf!aiJf*4,ifii 1l~\~
when doing such work, and they undertake to follow any ilqti!~.R!"
General
1.1 Safety-related terms
.i'I!
1.1 ti;.ftiji
The signal tenns DANGER, WARNING, CAUTION and NOTE
*~~~~(JCJg§*~:~~~~fi*~lliT~
are used in these instructions to point out particular dangers or
~re;~~ .¥~ 1~~}}IJf!.(JCJ~~*,1I(J(.:
unusual information which must be particularly noted:
DANGER Indicates that death andlor substantial property ~ mjdt.~ *lIitt€t~ tJCJBtfjmtJl1i,tf~~*AM. mt:
damage will result If proper precautions are not taken. ,"'Yl .*a<JMf!Il~·
WARNING Indicates that severe personal Injury andlor n mii1.~*lIitt€t~(JCJBtfjmtJl1i,tf~~~Fita<JA
substantial property damage will result If proper precautions are :!i-mtf'"'Yl it*(JCJMf!Il~.
not taken.
CAUTION Indicates that personal InJury or property damage will n mjdt.~*lIitft~ (JCJBtfjmtJl1i,tf~~ltA:!im~
result If proper precautions are not taken. ®'!it mf!Il~·
NOTE indicates special technical product Information which
~ m.~;ffiiJ.ijf~~.fF AM. ft.tJCJml(JCJf"!6
may not be particularly obvious to qualified personnel and
tt;.ftIl'iJ• •~:IJn !?A.M·
therefore needs to be highlighted.
It Is equally imperative, however, to comply with other notes on ' fliJ flit, ~ T fj ll:lIUli\t.,ilqt Jt'E;ff X M~,:1(~,.fi:,
transport, assembly, operation and maintenance not particularly
ffUJm. ti;ff1Jp I?At-fJU••tJCJ f!• •:tJilittt *.11 (t£~
emphasized, and with technical data (In the operating
.m~tm4S,f!aiJf*4 ~'"t£ii. ~ :!it J:)tf!;Ii!:4~1itii:~a<J,
instructions, product documentation and on the machine itself) to
avoid faults which. in turn, might directly or indirectly result In
fa ~'Effl&~1i:.!itI'iJ.~ltF.tJCJ A:!it-mtf®'jjJ M
severe personal injury or property damage. f!1l~·
Qualified personnel are pers0ns who, on account of their training, IjjjAM ~m~~®tz;I;ltJYf§:(JCJmiJU,~JJj,fXJf~1t~
experience and instruction and their knowledge of relevant sumdards, ;ItP.JfrMn t'J<J;ftI *f;F1Bht(l*!IH11,.1&J:OOlSJjmMti~ .1f:£f
specifications, accident prevention regulations and operating
~nOOt'J<J~~,~.~~Ir~~t'J<JA~~iiJ.1f~~
conditions. have been authorized by those responsible for the safety
of the plant to carry out the ,necessary work and who are able to
*,1tt~~JJlI.:~IH:j~,*liJfmI:±HlR<J1it1l&'11NR.R<JA1Q.
recognize and avoid possible dangers.
The machines described here are parts of installations for industrial :(£)X!!J9r11ti ~89ti*:!!:I .Y.k.I&ffl tintg Jfle<J~.R~1ffS)t, 'E ~
applications and are designed in accordance with generally accepted :(£iBlffl I~~ il R<J~iiIiU:~it Tfij AltR<J .
engineering practice.
& DANGER Owing to their functional characteristics, such &fQ¥.i /F~t'f<JI&JfMfti:ji!R<Jtl1f2t1¥~;f~~ ~~
equipment may cause serious personal injury or material damage ~~ A1l.t :if'itftilfR<J-=f7lf1. :m~~~F!tR<J A!tm~9.X
when improperly used, wrongly operated, insufficiently serviced, or
Mrz:m~·jt~:(£~ffl9.X fttjirf~ m, r.6 Bi*"~ Ilftfl-MJ:e<J'I'lt
in the event of unauthorized interventions by unqualified personnel.
lR. "fJ!:!!:im.llt·
This is particularly true of machines which involve the use or
transport of high temperatures or pressure differences or of hazardous
media.
.& WARNING It is presumed that basic: planning work & .i!f tEJIt~jE,ii"~fi~~*tt:llJ'&Ni1i
concerning the installation and all work regarding transport, *Tii*~M~,~~,.iit$,~1fJl!l.1Jjj~IfF~1il
assembly,commissioning, maintenanc:e and repair will be done by
qualified personnel or checked by responsible skilled personnel.
In doing so, partic:ular note must be taken of the following: :hJltrjjPJi?lJ4tjIJ*it~,@it14.fj:
• tb technical data and information c:onc:erning permissible
-1ft*~IJJ=tsL~hfl.*Tf'=8iJ l=;J)]{, -IT1R
Jf*4.fl&R4t
use (assembly, c:onnec:tion, ambient and operating c:onditions)
;m~'brz:8iJx{lj:ft(J.ftilf~m 1i9(~~,it ••I fFJf :Jj
contained, among other things, in the catalog, order
;m.fF*{lj:)~*flli;mJf*4·
documents, operating instruc:tlons, data plate and other
prouduct documentation,
• the general erection and safety requlatioDs,
• the local, plant~specific: specifications and requirements,
• the proper use of tools, hOisting gear and transport devlc:es,
- IA,l1m:ii*;m M~:HA~IHlIl~m,
- A:!1t~tr~"ft(J~m,
tE.:if'liJfm:'-J4if+PIfmli9~~,.fF9.X!l.1t(Si'..1jtm~.
2
event of a lack of product-related information. clarification must ;R.F'~~$j.B9tif~"F .1Z'®lblll.'lJ.iilB9ftif!f~±-mi!$n
be obtained via the appropriate Gardner Denver Nash - sales ~~UJj~lH~i3ilY.J. :::F:i:t,lN-~ti:IY.Ji!t*~~l!l~?tlfti!!.
office. Please always indicate the machine type and serial number.
NOTE: For general work such as checking incoming deliveries .m: ~3!!l~~it(~:S:1f~.tDtitfq$):l!.!!:!;l-NtIfl:~"&
machines for prolonged periods of time, foundation testing, fitting ~lE~~B9l£-zv~" '!%!'1tif!f~±::tc~i3ilY.J. :l!~::tc~
of couplings, installation and alignment of machines etc. • further i3i IY.J IiI bl1ti f!f~ ± mi!i $ n ~'3!iJ.
sales offices
NOTE: Attention is drawn to the fact that the contents of .m: ~tE~iJil3)}.::fHIlF'~Wi$j.~8'9P1~Fr-tm?tWtJJJ!!j[
instructio'l manuals and product documentation shall not become ii!:::F1m i&~llt B ff:.(£ 8'9 #J. tv~. * ~ :tIl1f. At rilJ B9 7! $ ;R.
legal relationship. The sales contract, which also contains the %jijJ.iil~JiUrB9iit$3(:9}. :l!.@1rI~H.E!:Oj!:*f4wt~1mrn
complete and solely valid warranty stipulations. contains the entire iJil3)}.::f:)l!lF'~Wi*4@;frf! .m:::F1m~1::fl'JB9llRfM.
.it
Refer also to section 4.3 "Prolonged shutdown periods" . Ii'iJll;jift#4.3i1"*Wl~*".
Description
2.1 Mode of operation, mechanical design 2.1 I fF:1i3t,mittflfll
ELMO® - F vacuum pumps (referred to below as machines) are ELMO ®-F .~* (I?AJafCif**Hi~;.!¥1~~JF i&t*).±.~
single-stage liquid-ring machines and are used to transport gases and mTtm~-m;T:k~.ffiffJ~,,*;ffl.~.
vapors, predominantly for intake pressures below atmospheric
pressure.
An impeller rotates in a cylindrical casing which is arranged off- ~¥U$..tffJllt~1iH.,;m3e~tEmDtt:~*,,*r*J)1filJ{£;1t
center with respect to the shaft (see Figures 2.] a to 2.1 d). Rotation ~$ti;IJ(~1II2.1a¥IJ2.1d)·nt*Bas$tiiJJ~Ifi=~tE*"*p;j
3
of the impeller causes the operating liquid to form a rotating liquid m.mt- ~:z;IJB9friJiF ,illIiF tE Pt*&;B9j1};j1- nt JtZJei]!$;fJ.
ring in the casing which oscillates in and out like a piston in the
tElI&'" ~~, ~J;f~wri&1iJpt~~«!i, '"i*jBH1:II ilJ:S9
pockets between the blades. On the intake side, it rises off the
impeller hub and the fed gas enters the enlarged volume axially
11&'" r:I~)P]l1tA*I*.J; t£:f.l~"'1lllM{lIiF 3l.Ji~~l!Int~
*&;...~i*1Jlffi~1t)l;tlIMl.ili:.t.I¥.J1'l~'" r:l1Jl~)P] f.I~ til·
through the intake port. On the discharge side, the liquid ring
approaches the hub again and forces out the compressed gas axially
through the discharge port.
NOTE: The product is suitable for transportation of dry and humid .~: ~iJj[~ffl T:Jm ~-=f1lB<J sl ~iIfJ B<J ~1*,ffii 3GtE; ~
gases without dangerous effects and for operating liquids; which are
'tw <R.~~, it ilfItl!7h1~.I tFill;f!lFJr1m~'"1*£3GfJ;, xJ(if
not inflammable, explosible poisonous or aggressive. Machines for
t!k'Ii.~~~~~MiB9·FJr~fflT~~~~,!i}1I,:fl.,.i!k
flammable, explosive poisonous or aggressive media are supplied in
'lifrl!ftB91ittE.t~~A)iffl~ B9¥;J<: iE!ffl~ :.16\~*Jl1{
accordance with customer specifications. The relevant safety
precautions, must in this case, be taken by the user.
if:fJ J.r.Z a<J~~Dil?Jjnr:&i·
--\H.
.. . . ._
+
Fig. 2.1 a: Sectional view 2BEI I 01 ("Single-flow" system; see Figure Fig. 2.1 b; Sectional view 2BEI 102...2BEI 153("Double-flow"
5.8a for details) system; see Figure 5.8 a for details)
.w..m
00 2. 1a: fflJt!.\!. II:J ( .. "'ijfijl!&ll~~" ~¥;i;J\t.1*~"'W S.8a) 002.1 b:!tJt!f.00 2BE 1 102 ...2BE 1 153("~.I!~Hlf~"~t1iJ;J\t.·tUIl
1l.m.m 5 .8b)
1. Liquid ring!nlff>
2. Casing! ~~
3. Impellerl JJt*E
4. Intake portll!&""C 1:1
Fig. 2.1 c: Sectional view: 2BEI 202...2BEI 253 ("Double-flow" Fig.2.l d: Schematic section through the compression chamber
system; see Figure 5.8 c for details)
IE 2.1 d: im.nffitm
JJ2~{j<J lljiJj!Jl
m2.lc: ff\J1!t1l:J2BE1 202...2BEI 253 ("UIlIH~~~"~~;*1*!\!J'W
lU115. 8b)
Water or other liquids are used as operating as operating liquid. *9.lt it'E~f*1JlfflfFItF~,
Operating liquid is continuously discharged together with the .ItFlllli \ii.l ~1IB'"f*~~!lMJt1'l~ tiHF~ f*. ffil lltlllJf &\~
compressed gas. Therefore, the liquid ring must be replenished :I1'$T:Jmf~ :;C~f!ifB9I4?t;p.IfF~·
4
In addition to its actual function of producing the liquid ring, the ~ T ff& Jl!l;7]cJ;F iX -Jl*:wfi~9bI tFftjf1fm:titff~~
operating liquid also has the task of dissipating the heat developed by
i*1!Jff=~~~t*~3StIlt~*"mllitzrB]I'aJ~~tFffl;flll
compression and seals the gap between the impeller and the port
*.~.ItF~~IiJ~~IlWl!t~ ~1l\!.
plates and, if necessary, cools the inner parts of the shaft seal.
This is why use should be made of operating liquid that is cool as
possible (e. g. water at I SoC).
When selecting the operating liquid, pay attention to the fact that the 31$ItF~~~M,~~.$1flWFI¥J~,f*4~,~.!:jPJT~1!Il
material of parts in contact with the liquid must be suitable. ~ItFtilltli!~·
The operating liquid must be devoid of solids such as sand as
ItF~/Ftm*1fff:{liJII1*~J.lfi:,~J~llitT~,:aJjlU*~~
otherwise extreme wear will occur in the machine. Suitable filters or
Fm:.~·~n*ItF~/F~,~,@i~~il-m~i:ttlMnlttt
strainers must be fitted if the operating liquid contains impurities.
9*.
See Section 6.1.3 "Technical Data" for details of the feed pressure I'r1=MjJ~rm::it£6.1.3$1t "~*~~".
and the volume flow of operating liquids.
(@• •t1t!tW(~!-l"'l5\;)
2BEI 101)
3) optionally arranged on opposite side on A26 3) Jtt{Lf!JJ.PJ~~T§3-ilA26:t1:
Detailed infonnation on specific media, pipes and fittings is provided "f I!ii ~ tI:1 t'l'9:Ji*=r-;tIt.®fl-[9l, ~1i&lit IlfWt~A~gmll($;
below (see Section 3.3 for further information on connections and ~~~1i&~~Jit.~!UlllfR~.!ii!. 3.3=ms1t).
5
piping).
2.3.] Non-return valves: 2.3.1 mJl:1I!I
A non-return valve (CI2) designed to offer as little resistance to flow ~l.l:IliJ(CI2)~1mt1*B<Jmj]M/j\M:ij:,t?;~~:tEjtf'~'IJ:..
as possible should be fitted in the intake pipe to prevent gas or ~w"Jl:1iI{fJl::iE~fIit,*BiM~1*~I~~~@]*.p.
operating liquid from flowing back into the pump whenever operation
is interrupted.
To avoid operating trouble, do not fit any gate valves or non-return 13:l11k.:ljf1=J:IW~iWi,;f:~:{E*~?:t~Bzra}3t~I1jiJniiJ
The machine must be fed with constantly cooling operating liquid to *PiJ~'®l/FttlTf"1E~nPI-f'F~.PA:f"~J!if!~i*-f9~~ff:I
replace the amount of liquid forced out with the gas on the discharge 1¥.I~~~?:tnl1*.
side.
In the liquid separator, the working fluid expelled from the machine .:tEt;:*?:t~.fi.p.fEJffi~~1*-jjg:fl.l1tFl±ifl9I~iIU!t5J
together with the compressed gas is separated from the gas and ~11~~.
dissipated.
See Section 3.3 "Connections. pipes "for further information. Please A1*~il.w..3.3$?t "~~,1fJm".1l0JtHIlf~9r$If1::~
inquire about requirements for any necessary external operating liquid tiJF.iWifiJ fPJ:ff ~Htf,~.
circuit.
2.3.6 Internal operating liquid guidance variants 2.3.6 JIiJ$I ff:tIl~~~lt
As standard, the machines are designed for internal partial circulation f1::jJ-ff.f;fiffE.~iM,*~itJiltPiJ$$?:t I fF~1mJFfmW
of the operating liquid (see Table 6.1.3 for the operating liquid :tt(IfFnlrnt::I:]!.6.1.3 .pB11*:m).
volume flow).
("increased operating liquid volume floW", designation "F64"), the ;f,~m "F64" ),l!fIit:m~B<J p;jmsli*~:rL~ffl-~~:ijf~1!.
corresponding internal connection holes are sealed by one plug each i!~,tWt)t r, I fFlti¥iiE.~ 6.1.3 ~ 9=t 1Yf~ tI.1B~~fff.
6
In this case, twice the operating liquid volume flow specified in Table
6.1.3 is required.
The machines can be converted later on. To convert to an increased
operating liquid volume flow, on the drive and non-drive ends the
*iiJ:itt~T~[rf~1*·1g~1Jn I fFfilmtit. ;'G#~~g~JlIIiIfJI
~~~K.;IJYWJiHt:fl~~OO(j{J?r.t:£~ (.!ii!.OO2.3b ), .fIj:ffl~.p
face plugs on the end shields on the discharge side (see Figure 2.3b)
J§Jf~j~~ 7.10~8.10 t>HtJtJSm~~t:rL·z.nM9i£9Hli
must be removed and the threaded holes behind them must each be
~~7.02:i!,lG8.02.
sealed with one plug 7.10 or 8.10 as detailed in the table. The outer
plugs Part 7.02 or Part 8.02 must then be screwed in again.
The type designation on the rating plate specifies which shaft seal is fif,JIIll.l.B<Jm!~«fyj\B~~tl::I Y~lW~m!.
fitted:
Typeim!
2BE1...· ... 3
2BEI. ..•... 4
On types 2BEI 20. And 28El 25., the shafts have replaceable wearing m!~ 2BEI 20.~ 2BE125·~~~!Wi~lffSw..l.~frcJJ!~
sleeves at the sealing points. B<JiJij.~~.
&. WARNING When operating with hazardous gases or
& .fi' ~MItl1fi!f~f*9lex.1fi!ftflf*1gIf1=ta~.J.i}I
operating liquids, make sure, by suitably arranging the shaft seal
~~JJft ~ fICJ"'Nmlt<iJU1l91-1'Pt>U1" iU1Uit), ex. §1j .I1: !Sf
(e. g. mechanical seal with separate cooling), that leakage of the
~~IiHilJl~iiJfil,M:i\t.pt.~f*~Ift:taHiftm.·
gases or operating liquids is prevented in the event of unforeseen
failure of the sealing function.
7
Stuffing box packings: :fl*4ii:fl*4:
Stuffing box packings are sealed and cooled by sealing liquid. When ±j\~mJ:ti~EEWMtt-\!~~:tm.~JJi~-+ii&iJll1J~§fIt'-''l~IS
the stuffing boxes are properly adjusted, part ofthe sealing liquid flows
JtW~~Vit:A*(:fg,ifij§j-~Jt91UfF~ "~ttiNtt"7iitflJ*'~.
into the compression chamber of the machine and the other part is
If cotton packings are used (see spare parts list), They are durable at a
:tm15!!J'H*J:ti*4(9i!.¥{lj:m.),ffiMT*!t~~Ift~,;Ft.jj
pH value of the sealing or operating liquid amounting to between
JflPHtil~:tE6®8Z.rjjj.
approx. 6 and 8.
To drain seeping liquid, there is one connection each for a pipe (E30)
;9.f.1FtI:l~lita,:tE;I;}l~~r::til't9$7¥JI~J:fl-'1f1lj: (E30)
on the bearing cases underneath the stuffing boxes.
If*~.
When using self-flushing, the sealing liquid is taken from the rotating
!31tP$ft;j,$M~* g I fFtp1ifi~ag1flJ.f,1t:lm.xt~~..tBtl
operating liquid ring during operation and is applied directly to the
iffjjlA~-m~:J;t(*4fl1.
stuffing boxe.s via passages in the end shields.
When using self-flushing, the types 2BEI 20. And 2BEI 25. also have
g1tPt;t:JJ1,~~ 2BEl 20;f02BEl 25.ag*,fiiJB;ffl-1-:J:~1Ja
a relief hole that increases the volume flow and return surplus sealing
Mtt1f~:i::t:l;*~i{ll8@J ¥ll*q:tIW~:bu1l.
liquid to the machine.
*
~~".
Refer to the affiliated dimension drawing or installation diagram of the
t-t:IA~i?Ei,-m~M:l"1fWtJE~ 7 ,J$.'if1f'JifJL#~tJfPJ D~
suppJy pipe suffices for each stuffing box, even if there are several
possibilities of connection.
ii·
Later conversion from separate to self flushing or from self flushing to
M.9I-i'Pi)'G¥lJ EI i'PBtM M. g {lf1i)'G¥IJ~"i'Pi)'Glf~iiJJ1!fj~~·
separate flushing is possible. In doing so, among other thins, the
;9 J1t,;J!!;2P mftz.- ¥tJi!:Im. :i1~ffi:$:Jl:.9.X; J! ~:!#it-+ flI, 1t ¥f
connection holes to the interior of the machine are sealed or opened by
request).
8
compression chalr.ber and m",1' cause damage to Impellers, port
plates and plate-type valves.
To avoid such damag~, the machine can be supplied wltb ~iI~iX~Bli!f,i!~1i~1!It~tp mtim (~"F80" 1JIlflJIT
anticavitation protectinn (add "F80" to the order designation). 1R ~i!3J:).
If this possibility was not already clarified during the course of project
planning the machine must be checked in this respect after initial
jj~1.. i1J :!la~$p;f,:tt~)(;j" lIt:iljJr~1lt· aN! if a<) :ft il16, :JtJt.~
commissioning. The occurrence of cavitation can be recognized by an
!8I~;a:~.t-F~jti!19 ttl $,$J:Y!ffi;jf'-=(.t:l!.$f{ a<) :& 1: .i1tllt,
increased noise level, particularly a rattling ~ clattering sound. The
*&'@Hlt.~t:l!.1*tp nrfji,2!3~,~&,@i:tEtiE1~$IJ~jf}fm
machine must be fitted in such cases with anti cavitation protection in
agreement with the manufacturer's responsible sales office. If the ..tllHl !l91AilJ'"f llHr· ~p 1!1!~~,1l~:~tt.i~aN!if* 113 ff:fr:,
above-mentioned noises occu' even when protection is fitted, the jj~1..it&,@i IfiJ *,Jllfffj.1{J.lf*~, ~ tiE i1lJf.jF~mfji·
supplied:
# with non-return valves screwed in. During operation and after # i!fi1i }fUt(~17 ~If*~!19 :IM!.ll:~. I fFM 1'aJ ~,.:.m z j§',
shutdown, small amounts of operating liquid may come out of these &:fI:I fFl« ~M.~ ®!iiJ nrp VIi 1±l. 2!31111*jl.:ffJSt:l!.'j1, ~
valves. When using caustic or flammable liquids or liquids hazardous fl.itt9Jt Mffi.:ff~ B>t,~.®?1!t~lll&,@imt~ft~a<J~~
to health, such leakage must be J:assed through suitable piping or must
# with the drilled holes sealed with plugs. These plugs must be
# i!fi1iJf] f'f:l;if~1t!l9~1~·~®tt:l;if&:'~fWJ;E,*~~{lf:
removed and replaced by piping.
f"t~·
'"f9lJ1!l£ilJ fJt~~:
b) pipe leading to the separator w~th entry above the liquid level.
b) iI rliJ 1=(;7./<.?j-~~ll9~1lf:,jt 7f JJ i£l«iM ZJ:·
a) 3l1l1b)rp!l91lrflf
b) pipe leading to another pipe, or to a vessel, that keeps the inert gas
Installation
1(.
3.1 Safety advice 3.1 :ti:t:}f!i)l.
.& WARNING Special attention must be paid to the .&tftr ~\~~iljttlt*i#.1!ij 451.2'$71' rp ag iTiJH ~
general safety information and requirements detailed in Section 1.2 :t:m~,"~*, ~$7t!iti*l'JCJffitfjHJt.~JH'"#~ 1t~
of these operating Instructions with regard to the permitted use of ~ti*~~~m.~l'JCJ~~~m~1i*·~'$7trpl'JCJtt
9
compressors and the specialized knowledge required for planning ;it$Jj.&:&~T*iJMJJ4SjfUM:tm-ijtijlJ.piJCJJt'Eif:l¥Jjii
observed strictly along with tbe other details given in these and the
supplementary instructions.
The macbines may only be connected to tbe piping systems of an :tEfiEffIr fA 'ft A Iii];itiJCJ1flll r ,~ii..iiI J1~~ilJ JaUIl
installation and commissioned, including switching on for the first
ii• .piJCJlfJ& ~ft..t~$,~$1!!~:tE~~~ff.p I¥J~
time witbin tbe framework of installation activities, In diligent
?K~$.
agreement with tbe responsible plant personnel.
CAUTION: Temperatures of more than 70°C may occur on parts ff;l:: ~jjt~3ili~jjt.7H.&l1fiiJm:Ci 70°C(~ilt)·f§
of housings (bearings).Contact with these must be prevented
J1t;f'M ~ iX.@!=$-ttl• •·FnJ f(i,X1&1ftU3iJCJ$.{lf:,m ~n
Equally, parts sensitive to high temperatures, for example normal
ft:iilff!l:iil tt!.B~{lf:m;f'M~z.M,~ !illIX1iX@l$.
pipes or electrical components, must not come into contact with or
f!I:~~fi~:IP·
be secured to such parts of housings.
Drive type: ~~~~:
For normal speeds, the machines are driven by directly coupled motors X-rT~1fE~Jm,i&t4kiiJa:t I'f!mA~¥giYJ,*f~~Jm,iiJEl3'{g
or, in special cases, via gearings, V-belts or variable speed drives. *B~. V~1t11!t iiJ~Jm~4k~iYJ.A1*~Jmm;IE, .!it!. 6.1.3
Refer to the table in Section 6.1.3 "Technical data" for details of speed $7}- "ifott!J&~".p (f9~m.
ranges.
Mounting type: lI~ljjt:
For functional reasons, the machines must only be installed with their Jgiij!YEitlE1K'I fF, *~4jjVitjl]fJr *~(.!:§ E!!:fJtB3 B<J
feet pointing downwards (corresponding to 83 for motors). *~~J:.t;fH~ ).
When using a V-belt drive, position the belt pulley so that force is
Drive elements:
!J!~jG{lf::
10
assemblies carefully with the aid of shims to prevent distortion of the
~~IIJ1Ht3!1lt ~*~:jf.
machine casing, noisy running or damage to the bearings.
Jammed impeller:
uttt-F{t:
If the impeller is jammed, adopt the following measures:
pt~-Fit!J;f,if*]{l(fmmnftj;
• Undo the securing screws of the guide bearing, remove the -- tIF~~{ft~~·tMtml.~t~§JEiM!iHl.!J:f ,1T1f5.E f$L~*
11
by noise suppression.
3.3 Connections, pipes 3.3 ~~,1fJ&
.& WARNING Installation must be carried out in accordance .& .~ ~B9:ti~t~Mfftiy;tirmJ!.i*~liil9rJ1j
with the binding plant installation plan prepared with the specific ll:Wi:lt:tJ,fri] flit-&~iI'i.T~Jll&P)l~B sp (j(J -jt~ 31(.
details of the plant in mind and also in conformity with the general
requirements stated in the operating instructions.
Examples of expedient arrangements of pipes and fittings and
specific conditions are also listed in Section 2.3 "Connections" and
2.3.:St"~~"sp,.lii~~1mW.~.·wr1i1f{lf'&IIfiJiil{lf,
must be additionally observed. With regard to the materials and
;J':t#*,"®R~~,~jB!Ei*f*ltEf:h~mJJt1it(Si'.,&:'~l!~
dimensions, all pipes and fittings must be adapted to the respective
BimftMt~~·:tE~m*i~~~B9l(5!jiB;f,~fiij$j:iiiifij
pressure and temperature conditions and must be suitable for tbe
type of medium used. The manufacturer should be contacted If ~}kl~}1ff·
3.4 ~~
3.4 final measures
After completing installation, all pipes, particularly tbose on the intake 1C~%ZS, JYf:fi1fBa, *f§Jlj~p'&A1Jfq1fBa~4jHl}Jfffi~
side, must be cleaned thoroughly because foreign matter such as
~=P»,I?A~l1::w~,*~,~~Z~~!fm1*:lltA*fkJ·
12
welding beads, scale or rust flakes etc. must be prevented from entering
the machine.
• the machine's bearings are still lubricated adeqately (See -- ~jHi!ll*WJm lE?H..!i6 "~*WJ.,~f)
"Lubricating the bearings")
• the assembly (machine and drive motor) is properly installed and
aligned
• the drive elements are adjusted correctly depending on their nature -- ~g;IJ ftflf.:ttHi'E in a1J '~J.9{i]aJ"'P.IE iJfl, ..§.1(~;1C~ (oJ .f.J
and have been fitted without axial thrust (e.g. belt prestress of belt (17IHlu~~~gi9J l¥.lfJitlLn ;~!ftlIU(j(J12 (.i];f!1~ fiiJJJ"n)·
drives; radial and axial alignment of coupligs)
• all fixing bolts and connection elements are tightened firmly -- wr:ff'!llmtlf.t~l\Xtfl:7C.{lf.~iS'1'iJ~
• the impeller can be turned without rubbing -- pt~~z;/J ]G• •
• rotating parts are properly protected against (e.g. coupling -- ~~1lIHlf.I!ti~fi!Il.~t? iEfJffl( "WIjj(IH1~~:Ht?.!l ).
covers).
• the drive motor is assigned and connected correctly (rating, speed, --l:@.m~~.~m.IE1ifIi ( :;I'J$, ~lt, ~(.i] ).
direction of rotation).
NOTE: The direction of rotation may only be checked with the .~: It!.m ~jP1R:fftEP.Jr[!ic~jgill*J~iiif,iJ~iEf!ffJ,£L~
machine coupled when the operating liquid in the machine casing is *.;I-!?i9WJnt3tiHfj'l1il:5t ~~:i![(..!i63.5.1ms*"®~m~-1i");
adjusted correctly and the stuffing boxes are adequately moist (see
~E'lfflm ~i;~f!;j. §l~f!;j~fHIHr1fWMnU~$1J~,~~
section 3.5.1 "Preparation for start-up") or, when using mechanical
mWJm:flJl\f;M·
seals, the sealing liquid valves have been opened briefly
• the pipe installations and fittings are arranged correctly in -- '1f{lf..&ffl JiIl14=~~.lEiJfl1t[f(1-€iIr3t~i.t~U,..§.3t~
accordance with the plant installation plan and been fitted without
EM' 4' ~~rc~!lfI ~B9m~§ln ~u fEn·
mechanical stress and pressure tested.
• any installed heat exchangers have been bled and/or any installed -- P.Jr:tt~~~~:$~/~ ~1:E~:ftISfi~ili:fi
booster pumps are operable.
•
.. any adjacent separator is installed at the right height and has the
,prescribed fittings.
CAUTION: The above Hst does not claim to be complete. it%!: ..tlliNfJlJ* 131t?F~ii1,~JltEtzt{UI:mEtzIWI!f:t:bn
Further checks may be necessary. according to the affiliated ljil!f:llit tlUI%=;t1W Al*}}ljjjmtSl.,.ilt-tPlW~~·
supplementary instructions or may be additionally required
depending on special plant-specific c:onditioDs.
CAUTION: If explosion-hazard substances are used as medium or it%!: jlhqeNf~.IW~l*litI *tIl:A-:fflHFtt,JJfS~~
operating liquid, the complete system (machine, piping and 1-~tIt(Ii,1fJ1fflt71- llfB),tEEtzJfluu ~IHJfJfH1ftt~ u: i$
separator) must be flushed with Inert gas prior to use and must fjl;, Iiij flitlt1- ~tttif£4Jf JI(tft:!c~~*.
meet the safety requirements.
NOTE: The normal scope of delivery only ever embraces the machine !li~: {jt~ M:mJR-§m*~ § ~(i9::ffjf~D,~nz.~ffJ
itself (without additional components such as fittings, valves and gate ffl{4=)·
valves etc.).
The arrangement of components shown in Figure 3.5 a (pressure *:7C.1.lf(.ffi.jJi.t.rAt:i:i.t~~ n~)t..li~{E~3.5ar:p ~M:1fIj
13
gauge, volume flowmeter and valves etc.) is given by way of example ~~~!tI:l:1,'~ilJ:bIlQA~1fQAla~:tt~~>.tt.
and can be altered to suit installation requirements.
-
014 Volume flow meter! lilt.tt
030 Drain pipe for discharged operating liquid! ~_fiOO1liif
OSO Pipe for draining and flushing! jj{~i!tfllt+tJ\:'I'
OSI Valve! IIIJtl
OS6 Funnel or level gauge! 84!il1li1l£tt Fig. 3.5a: Connection example (equivalent diagram)
EtO Feed pipe for sealing liquid (separate flushing)! ~jflll~ta-'lf(~I-t+tJI;) 1113.5a: i!.ffi:fJt(~\i'lJJjj{JJlm)
Ell Valve! Iltltl
El3 Pressure gaugel fi.:h*
El4 Volume flow meterl il-ait
E30 Drain pipe for seeping liquid orthe sbaft seall "'O•• mI...
I) arranged on the non-driven end on the intake side 1) ~.T~F1@i9J.I!I~1)!!
2) arranged on the driven end on the discharge side (not applicable to 2) :tt• .:p1@ZjJJtM»I~~ ft(2BE 1 101 3GIltlLf)
Type2BEl IOJ)
3) optional arrangement on the opposite side with A26
The normally connected machine (see Figure 3.5a) is commissioned as iI*~tfl!tp~Ii(Jtm3.5a)jm""F~i9J~$:
described below:
This section applies to an empty or dry machine (i.e. when ~1$*.RlaJiETjI~5!~Jt;; T"~*(te.:~t@:fJJ~~i9J~
commissioning for the first time or when resuming operation after -'JJI!z.Jl§":P,1t :t£.fFtp*l:t-.tfiij~*z.Jl§":i:f;IT~ZjJJa1).
connected correctly.
AU valves and gate valves are closed. There should be no gate valve or PJf:ff~ i1~pjiJilfJ$;@:*PfJas·:t£~~~ 1)!J.if'JiE:ffpjiJilfJ®l!!
- Adjust the operating liquid; to do this, open the operating liquid •• iJj"'IfFltl;;/9I1tn7fIfFltl!lJJi1Dl1~IOtp;jl.
-- Adjust the sealing liquid for shaft seals with stuffing boxes: .- i)IJ"'Jl*4Bi§~~as!;~ltl:
# when using self-flushing, the sealing liquid is branched off # §ftP~lJ;j· *#ltltE~ZjJJz.Jl§"m~ZjJJa<J7.lcJ;f\§ZjJJ~~·
automatically by the rotating water ring after switching on. Stuffing ~*4ff~.if'~fff':t.~;.if'.~a1~~fn;f'k1f(illlir.1i!.5.4
box glands must not be tightened too firmly; loosen them in cases of 1$*)
# when using separate flushing, open the sealing liquid valves # 9rftP~lJ;j.n7f*!tltlilfJ n Ell ~m~ij!{t-+·zJl§",*1!f
Ell to moisten the packings. Check that enough liquid seeps out to ;f!::&:ff JE.'$B9~tpjj;;~~~-!*~tltil:l:1;~O*flPf,i)IJ"''f::
14
cool the packings later and correct the setting if necessary. Feed frJB<J~~.f;M~fjt~BijJ~iti.6Tllft=cBijJ~O.l ~IJO.3bar.
pressure approx. 0.1 to 0.3 bar above the compression pressure.
• For mechanical seals:
Open the sealing liquid valve Ell briefly to moisten the ~1J;j'9!1IE3TJff;M~~jH1E!I~m¥1flm ~f;M
mechanical seat
•• Switch on the drive motor and then immediately open the operating -- ®i:Wrt!mZ~1Ll:!p1r7fIf1:~~jJnDII'
liquid v~lve 011.
•• Regulate the operating liquid valve 011 as.follows: -- :!tll"fViJ"iJI f1:f{l1fJJ n DII :
a) Method involving volume flow measurement: a) mtjtB9I~:l:Vij"iJ1J~:
Open the operating liquid valve 011 until the volume flow meter
1T:1f I tFf{l1?JJ f1DII1i~mt:l:itDI4m$jll~l~B9mt::I:·
D14 indicates the desired volume flow. Refer to the table in Section
I tFf{{vn:jtJ\i:{tR:T J!& SCBin .;!tx11iY:1:~,.w.6.1.3~1t 9::t a<J
6.1.3 for details of the operating liquid volume flow depending on the
equal:
Adjust the operating liquid valve OJI so that the pressure gauge D13
:e:®i:WB;j,iffll"iJIf1:f{lWJI'l DII.¥...ffijJi.tt¥.Jmjft~jig~1.0
indicates an absolute pressure of approx. 1.0 bar during start-up. Once
bar ~~1BijJ.- .§.ltjlJ I f1:~:2jf,..ffijJi.t1l!mjft ili-l'
the operation intake pressure has been reached, a different value may
1:t:<~Tpn'$If1:~It'kil1J:ttB9BijJM:.
be indicated on the pressure gauge OB depending on the internal
Refer to Section 6.1.4 and the affiliated supplementary operating 1f ~£IB"iJj!.6.1.4$?t:fMtl ~ m:b~ ~f1:-m 1Y3.
15
instructions for details of settings.
m
faJ!Wi B;j ra] ~~tlU *:
# m~3fMi,~~1fft-llIi(IfFlli~Wttlli)~'$illWt<%,;)ll
sealing liquids) and of components (particularly bearings and the shaft
~4lll~~4lllM~)B9mJl\EI:¥m~~JIJ-~,JE~~'1H~
seal etc.) until the steady-state point is reached and also take a note of
M-ic.~·
them.
Operation
tiff
4.1 :t(~.ilL
4.1 Safety advice
.& WARNING Special attention must be paid to Section l.2 of Wtr *iJtlJJ·:IH$ 1.2~Jt~\@PJlmlt\fj'Is:.,~~ft~
these operating instructions, which contains general requirements ~lf*~.fffD.U~~~~~~*wr.~ifJ~n~~
16
with regard to the specialized knowledge needed to operate and
~-lfi~*.
Refer to the details given in Section 3.5.3 with regard to draining in the *T~1£.~L;;fl*fJ;j14f~B9Af*;mll1£ 3.5.3 $:7tCP
If possible, report or mark activities carried out and, if necessary. take :!lQ*lI~,ft~it.~~ trH!i',1£'I:~~~lE~S;J~~'E
them into account when commiSSioning again.
111~l!llt~·
Maintenance
5.1 Safety measures 5.1 :f(~m~
&. WARNING Attention must be paid to Section 1.2 with ,&tfl!r *ifMJJ~1.21$:7t'fMJ1rllit'£:1t~~miJl~fff
regard to the speciallzed knowledge required. §.mfUlt.
Machines that carry hazardous media or are operated with such
~I[M~~~ft~9lI~~1f~~~~*~~SI~
operating liquids require special on-site precautionary measures in
conformity with the safety regulations of the industry in question.
:tc~m91!l MJ4tJlI$:Ij:tc~m§tj1i~·
Prior to any work on the machine or the pipe system, make sure jUIl'lf.~~:tEfl.z..fi.~\m.1¥:
that
• the intended action will not result in a malfunction of the - J!If!f.lJJ:fl~!t.~~ X1~~f=~~ titki:W:,
system,
• the drive motor is switched off and safeguarded against -It!m:J!*fljMJ,*1¥ii£Jt:::t'fj1tfi:9r~i5/l,
17
reactivation,
• tbe corresponding pipe systems are depressurized and aiso -tft~1f.~iJf~%ffiJJ.Il;ff~tr m~,
safeguarded,
• tbe transported or applied media tbemselves will not pose any - U.~.@i.~(r(J1tB1:t£tr7f1fJ&~iJffl;J",.iFfIIi~~
risk when opening the pipe systems or any necessary tEM1ttJ.tfllN.~g:,:e!il~~~7.{ffiiJ~,~(r(J~:3!BH~1j
safeguarding measures are known and are taken into account. ffttill1f:lmi?A;;ttlti.
If the machine has a belt drive, the belt's pretension should be checked ~oJla~;Jg&:.ftfi91,.mz~~~&:~!W:rk~~liUl,~lliiJfi,WJ
and, if applicable, corrected after 5 hours of operation following initial :Mt®;f.JljjJ"II>j.lS~l!tff-?xiJJ~.I?J,.J5!1-)lJ W:I~l!I:rriJJ~.
inspection on the machine after around 150 hours of operation to check :il,:t~Jttj{ f3 ~1l'"F:
that
18
• the specified technical data is kept to (power consumption and -. 1X*ltilff-Et~*(:;IJ$;fnm.1t~),
temperatures etc.).
further checks may be necessary depending on the affiliated tt<J1Sft:IJn!lft:iR.I!Jl(MjlJ,m ftt1MM)!i2 «UI*f~I 11=:J!4l.:li
provided no shorter intervals are required for cleaning the compression ~~~ecJril'(; ~liil¥lit:i:.t~flfjg~t)\;J!.IWJ::.t'~1fHiIf1it,*Jll,JE
chamber or strainers and filters, maintenance intervals under ~~~jHlfrlW£tf~ J:JJ1li1SJ7film¥l!lfjg~huEX mitt iIlla<JI!
It is recommended to flush out any foreign bodies that have collected l!i~4ijMi~~a<J!f;jWJfl:Pt)\;~,*~~;(E~JiF ~B<J:Jf!/m,fJU
in the liquid ring at appropriate intervals, e.g. by briefly opening the ~llm!f;jrH]1T7f14F:mt'itJi&..t~IliiJI'lIiX; mf1itIB]1T7f~F~{;t~.
plugs.
If extreme lime deposits occur in certain operating conditions, the ~1l*;(E;Jtt~1lfF*flf""F:ff:i:.t:!i~7./<.:I1fi~~,~~1;. *4ftIWi
machine must be flushed at appropriate intervals with a suitable solvent - ~IJ;jWlit~'* t)\;-tX,,*i7tIJ;j;tam -~ ti~ a<Jrtf1flJ,*
Any strainers or filters installed in the pipes must also be cleaned or JYT:ff~~13:'itB&1:~iJMm;fni1~flill~\@'i JJ.tff jj!ijNWf
replaced regularly. a<Jmt)\;EX J!~.
The next cleaning intervals must be defined according to ""F -lXlWmt)\;,mjM~\ffi~LHm~-1X~i:i1~tp *~fec
contamination found in the machine's compression chamber or the ~~'itB&1:~~~:M:~~IW~~~~*~~·
19
strainers or filters of pipe during the course of the first inspection.
& WARNING Use personal protective equipment (e.g. & tf1r ~mBi~"ti*litt1\;IJ;f,!l-Ii!.A::!it~f1~.
protective goggles, breathing mask etc.) and appropriate dust (iIl~.,I:I1Tl~~)"Hf!.m1K~fI~t:Hii•.
exhausting gear when cleaning with compressed air.
If chemical cleaning agents are used the warnings and instructions {tm{t~ .t1\;"IJ;f,~@itt.~ ~~~:Jl*4 rp fJ9"~
of the ;elevant safety information sheet must be observed (see
;f:Rm~·{t ~"M:~~1:§J!)f.mU*l~~R,*fjJU~Il*4
Section B 1.1). Chemical agents must be compatible with the
1titJMl·
materials used, especially plastics.
position of the stJ,lffing box housing. Then remove old pa"king residues. :'iEIB~*41Ni1i8jjt*ftK.~.llt,.M~Qil.i§tI1~fEPr*.
and clean the packing area. To do this, it is best to undo the stuffing ~1tdlTJ.t(*4fJ1,.iS..j;ll*4:PFii~::trB].M1t(.llt"Ul.90o.~fJ1,
box housing also. Insert new packing rings with joints each offset by ~MiiA.~tt1~:(£J.t(*4Pi!B97HIem:1f~$IJWPIiiJ.
900 . In doing so, make sure that sealing water distribution in the
packing is not influenced detrimentally.
20
Stuffing-box packing data for types 2BEI 10. 15. 20. 25.
2BEI
Overall length of rings per machine 2.2m 3.lm 4.2m 5.8m
"
Cross-section of packing rings IOmmxlOmm I 4mmxl 4mm
3 4
SHELL/Alvania G3
MOBIL/Mobilux 3
RENOLIT DURAPLEX EPJ
*) Lubrication intervals must be halved when using other greases. In cases of .) M1~ffl itt::ffl1fft Dlilllt,jfiJ 1ft }ij Wl!l6\@i~,*,1zn;ff~ fa5J ,iW l:j *l if[~
doubt, consult the manufacture of the machine. ~~.
overgreasing of bearing inserts, bearing caps are not filled with grease.
Jt..t/F~j;fU*WJittftli .
When assembling, make sure that the axial shaft sealing rings (V-rings)
~~Bt,JHif81¥~ raJ~1tliF (V~liF)~~JEfiIU, 1tWJm
21
are installed correctly for proper function and that the sliding surfaces
are greased:
• In the case of the outer shaft sealing rings, the correct axial ·-1E~~~h~fS*jjjf-p;j'.V§!!jf- '~li1.!3~*1if\!;~fiIll
pOsition of the V-ring has been reached when the bearing cap face ~Fflaj-JJ'-Dii..tp;j'.~1YJ V§!!jf- ~faJ~~tLter£
and the outer edge of the V-ring are flush. To do this, it is lli~J·;igJlt,~i)(iJ!m-:-~~~~llIA(!M1TltJ[7t
recommended to use a corresponding assembly aid (see sketch in flm..tB;ig .. ~llm~.. a:pB9m~·)
the figure entitled "Assembly note" on the fold-out sheet).
• In the case of internal shaft sealing rings, the correct position is
ensured by the respective groove in the shaft.
5.7 Repairs, spare parts 5.7 •••$I!ff:
Pay attention to the repair instructions (supplementary instructions) ~li!t$~{tfll1!iU~ p;j' .~tt:i:!IU~i$~J:1A a:p B9:fl *m
~
with regard to the installation of spare parts and repairs. -ut1lJ3(Pfj1.rnYVm~)·
When ordering spare parts, it suffices to specify the complete spare
~fH!~$Jfa{tflt.t,~ 'HtUIP.Jfm:~~${tfm.Jl..tJii
part Order No. according to the included' spare parts list. which also
.B9.ne{tfnD!lJ~16tfrT .~nD!lJ~~W T~IG{lfJiJi
defines the material. If no spare parts list is available. the type and
ffl;f,j*4· io*t9:::ff${tfm•. ~TJ;\\..t$ftG{tf~~(rE
serial number of the machine must be specified in addition to the part
*iJtIlA4SB9jji?tf8¥OO~I:I:I)~hBi~1.rU..tjjiB9~%~~
NO': (as detailed in the exploded drawing in these instructions).
JlH"tJij·
*',
Repair instructions are arranged separately according to the type range
!iE.iJt~ 1HtHI~~~~fB!iO • !!It ~ 't:Bi-E.!-@j::ff
~=fjjia<J11'F!I1,IIU!:,~m'"li!tneB9 ttll$J9i .
dismantling, testing. rework and assembly.
Appendix m~
Idm3/min=O.265USgprn=O.22lrnp.gpm
Idm3/min=O.26SUSgpm=O.22 Imp.gpm
• Materials are defined in the catalog and in the documentation of • ~*1: tE~B9 ~ ~.&~ ~Jf*4a:p~I:I:I.
the machine.
CAUTION: In the project planning stage, the parts concerned
tt~:t£Ifi#lIM'Bt,~~.~!f&,@i!3.8fJDiIlf*lUPJr
must be selected to suit the liquids used and the media to be
~.ftm~IHi~,1t!£,~tmflUjt't: 1I11¥.J"t!Jt.
handled and must be resistant to them.
22
• Weight for dimensioning of hoisting facilities: refer to the last -- ffIn! ffi:ii:SN:4-JfHtll: .!Ji!.*1Jttm.::J5:AtJ§- yr.
page ofthese instructions.
• Packing size: see Section 5.4 -- jJI;~R:t:.!Ji!.5.4$jj-.
• Max. absolute pressure for pressure testing of machines -- 1jHI9Ji*~.xifIHa\.ffih
-Types 2BEI ... -B.=3.5bar absolute - ~~ 2BEl ...-.B.'" 3.5bar ~~BijJ
-Types 2BEJ ... -H.=6.0 bar absolute - ~~ 2BE1 ...-.H.= 6. Obar ~~BitJ
-Types 2BE1...-H. with toroidal sealing ring·)=10.0 bar absolute - ~~ 2BEl...-.H.'If1:ffO~~MIII·)=10.Obar~~ifBitJ
.) Add "FO1" to the order designation III) tE-tr1Hij!I1JLt:JJnf-t% "FOI"
• Nominal speed and pennissible speed range: see table in 6.1.3.
- ;f;lnfU~il;fllftilf~ilm:mJ: .!Ji!.6.1.3 9='t¥J~ii~·
6.1.2 Medium: 6.1.2 JYfttb.I¥J1tM:
• Type: Gas according to planning documents or catalog. -- fII~:.iEI!Jf~~r:~ §~9='J9T:JTil~t¥J~f*.
• Permissible absolute Intake pressure: 33 mbar absolute -- 1.Ji ftiffttgieXitIftAJih :33mbar ~.xifffi.1J·
• Permissible absolute compression: 900... 1100 mbar. -- JiJi ftifftf1ieXitftF-ktJih: 900 ... 11 OOmbar ~M Bi.1J·
• Compression pressures in excess of 1100 mbar absolute
-- ftFE(.llijJ8.l:tll00mbar~Mffihaif,)j,*~HtHtIIJ@
generally require consultaion with manufacturer.
iflf~~·
• Normal separators are only pennitted for a compression range of -- ~llHh"D.R~{'£ 800$11 1100mbar~~llF~ffi.1J
800 to 1100 mbar absolute. ti1fEr15!}fJ .
At operating temperatures 2:50·C, special adjustments are necessary on
I fF.J.i>50°C,.§.I1t~ 19 :iFi)lJm~1lj:(M*4;f;'Fie H,M,N,
machines with cast stainless steel impellers (material variants H, M, N,
P)!f;j ,~~3JH1~~~§}IJt¥JiJ'lmfiJ3i·.ifU \'qJ A1*~1J'
P). Inquire about futher details.
• Type: Generally water (see Section 2.2 and 2.3 ). -- #~:)j~'l1if.5l.r }fJ7j(!R.2.2;f1l2.3ms~).
• Temperature: Nonnally 15°C (limit range: OOC to 65°C). -- tllt:;f;'F1fEtl1f15°C(ti1ml0°C¥lJ65°C).
• For differing operating speeds DB' the volume flow value - .xif:if'[S.J!ftilnB,~ii~9='1Wmt:1I:-m~,@f~~,OlslTnB/nN'
in the table must be multiplied by the factor nB/nN•
• For an increased operating liquid flow, the volume flows - ~~*IfF~Vit::llJt:JJn,!JId~iI,§~9='agVit:l:!.I6,@f:IJn{.:g:.
specified in the table must be doubled.
Typel~~ Nominal speed Permissible Operating liquid volume Oow(mllh) at nominal speed nN
nN speed range depending on Intake pressure (mbar absolute):
~ll$til n. ~lIU~it nN 'f*~T~X>tI!lt.AitB1jJ(mbar)(j(jIf1:~ti:li(m'/h):
$titft.ifF~AlI <200 200 •.• 600 >600(mbar)
2BEI 101-0 0.9 0.60 0.30
2BEI 102-0 1300 ... 2190/min 1.1 0.73 0.36
2BEI 103-0 1450/min 1.4 0.93 0.41
2BE1 151-0 1.S \.0 0.50
2BEI 152·0 IIOO ... 181O/min t.7 1.13 0.57
2BEI 153-0 1.9 1.27 0.63 .
2BE1 202-0 980/min 740 ... 1300fmin 2.1 1.40 0.70
2BEI 203-0 2.6 1.73 0.87
29E1252-0 740/min 565...920/min 4.4 2.93 1.47
2BE1253-O 5.2 3.47 1.73
23
Standard parts obtainable through the trade are not included In lhe legl.'ud.
T1H~ type and size of the~e parts can be seen: from tbe pertinent spare parts Ii$t.
*OO~:F1!!~jjJlII(!OlltB~III1f't·
6.1.4 Shaft sealing liquid: 6.1.4 tllli!'i:tltlif ~~jij;Iil!f'tfllJlI!i;l;i!lIRi·J\1;!ll"y.fIIJ~f't~ij\
\I Type: Generally water -- ~~: Jl1i~'I'R(5/,Jf.l7.k
• Temperature: Normally 15°C (limit range DOC to 65 "C); or -lIilJjt:tf>llElIilJ.i:15°C(i'il:1'ru O'CiIJ 65'C);jjX; ;Ilt11f!JJr.'E
operating temperature at least 10 K be.low boiling point. p~{~'f;lti;lll.~ 10K.
• Pressure: 0.1 to 0.3 bar above compressor pressure. __ ffifJ: I;;''f'~lI,<!liUfi
• Sealing liquid volume flow in the case of stuffing boxes (with -- :lJj;*4iil!i~3lt()lrl1F~)Il1li!'i;t.tlli:!iii::liI::
separate flushing): 0.5 dm'lmin; highly dependent on the stuffing
*:!£Jt~tI<:T:lJj;*4iil!iii<Ji)IiJ,!\!)jjt~
box adjustment.
11.06
• Sealiug liquid volume flow in the case of mechanical seals(With • mi>!tli!'i3lt<:i'rl1Fi'Jt)fl>j-lB'iMIli:!iii::liI::
separate flushing):
thereto cannot be properly ..identified unless the design is specified 1!f.J/{':i!;-*t\'3>lJ:±: ,1tl:'~~;ltt;!f¥iJ~~:)jIilillitIJii<J~jji: tILlI'"
precisely
sm Distance bushing!lWi1l!'
17.02 FlatgaskeV'I"i!ii!l;
Fig. 5.8 a : Vacuum pnm) 2BEl lOt (Example, delivered design mRY deviate ill details) 24
1) only if ordered espeeilally/.Rlll'f'i'lfitiTJ;f m5.8 all'l:'!\':ll! lBEI 101 (l\l;ilIl.:1EIl!I'\1tfi!iilJt:!li'lI!i;l;~ 'I'l!n:ffilj)
Standard par;ts obtainable through the: trade are not included in the legend, *OOB:4'ii!-:\"1iJliIlUljiI'J~I!H4·
, 13.13
'd~~
13.01 Cylindrical roller bearing (flooting bearing)IIlII#.i1!'i"\!lliMill'i;IJ\lIIff<)
13.02 Deep-groove ball be.rings (locating bearing)! !Ii<?li!j;j1ll11ff«:efu:llIIff<)
13.03 Bearing housing/llIIff<l\i!
13.04 Shaft ,ealing ring (V-ring)/llII!t>!,(V!!iIm
~~~
L.acating bearing housing/£f:illlllff<~
Threaded ring/liIIIttmllil
13.08 Bearing cap/llllff<ilIf
13.09 Conipensating wasber (for rotor odjustm~ntJ/ ~l!\:'iIlIll(~$\''T Jjj)
13.10 Compensating shim for ball bearingll!l!llIIff<:jH~Jll1t!1!lI
\3.11 Shim ring! !Wi>!'
13.12 Thrust washer/llllilllll!ll!ll
17.01 Separatorl :frlilr~
17.Q2 Flat gasketl'l"lIiHIl
18.01 Y'pipeii!il1i'if
18.02 Flatllasketl'!"lIi'ill
'f<!l!iIllIIIlJ1!:
Disc used ""' II fOOI'IO tOQi-
12.07
'$i'!l1;JIl~
Fitting instructions
Fig. 5.8 b: Vacuum pump 2BEI 102 to 28EI Example. delivered design may deviate in details)
25
!l'I 5.8 b: j!I;~i!! lBE I I02 ~IJ lBE I (M!!I.:fE!I1Ili:trjjijiJ!iiit!l!!;l:~ :lfffr l' jiiJJ
· Standard patts obtainable through the trade are not included in the legend, '* OOtt4'i'1;~ OJ j!I; !JI<~J 1R*i'lIIift·
13,17
r()_T'in!YV·~:t>"'1lel (Om~)
1)
2)
3)
1<~JflIl!JJlt
Disc used as 1'1 fitting 1001
12.07
1<iiltt.i'l'
Fitting Instructions
//
'17.04
( 7,08
\ 7,02
7,02~
Fig. 5.8 <: : Vacuum pump 2B E1 20 to 2BEI 25, ( Ex::unpl€:, delivered design may deviate in derails) 26
IE 5.8" ll!~* lBEI 20 ilJ 2BEI 25, (i'B1l!I.;e:1llIf.i/f1liiiJl::1Iill'i"'~ :fj'J!fi;fIiil)
Special infonnation for transport of ELMO® - F Vacuum Pumps 2BEI 10. To 2BEI 25.
2BEI 1O.iU 2BEI 25. ELMO® --F g~~B9ffHii1f~
~.~ ~~~4~~*o~MM~~m*M~.~
iTii4\.*I-M~it¥lJI@.~ ~ ~J:*M~.~L (#m1.3a)!
.tt.M~ii.ifJ M~tmjJ!
• Slings are adequately long, i.e. spread angles are less than --MAJ!.Ji!.*',-t:BepMA~~ffJlJ\'r 904 ,
90",
• suitable sling points are chosen (e.g. tbe bearing eases are ~:I¥Ttt~~M~~H~!IIl~*~;4\flif§:I¥~),
suitable; never suspend by tbe shaft!),
• tilting of the macbine is excluded by correct positioning of
slings (see Figures 1.3 b),
• no attaehed fittings can be damaged (slings may, however. -MAf!t1f~$~ITfff!f(MA iW mtl*1ff!f~ it.
be guided over any attached wide pipes or separators. B~lnJlljE"ifjjf!t~~~fl.@m;Jt-gM~I*).
There is no need to use spreaders).
:I::l:OR~ltf;fj'mf"t)
2BEI 101 O.IOt
2BEII02 0.15t
2BEI 103 0.16 t
2BEI 151 0.22 t
2BEI 152 0.23 t
2BEI 153 0.27 t
2BEl 202 0.45 t
2BEl 203 0.51 t
2BEl 252 0.91 t
2BE! 253 1.04 t
27
Gardner
Denver
6.1 主驱动电机
6.2 联轴器
6.3 压力表
6.4 压力开关
6.5 双金属温度表
6.6 电磁阀
6.7 换热器
6.8 转子流量计
6.1 Main drive motor 主驱动电机
*Origin 产地:China 中国
*Manufacturer 制造商: Regal Beloit Wuxi Co.,Ltd.
雷勃电气(无锡)有限公司
*Model 型号: HJN1 315S-8
三相异步电动机使用维护技术指导书
1.警告!安装使用前的注意事项
1.1 必须确认电动机所示的参数符合你的需要。
1.2 必须确认电动机未受到任何损害。
1.3 拆除轴伸上的轴卡(如果电动机有的话),但在电动机运输前必须装上。
1.4 电动机的吊环及其他吊重装置在使用前必须拧紧,且只能用于起吊电动机本身。如果电动机有一个以上
吊环时,必须一起使用以分担重量。
1.5 确认安装后,电动机的安装方式与电动机铭牌上指示的相一致,有泄水孔的其位置适合于使用场合,并
保持泄水孔在最低位置。如果电动机在安装以后无法达到上述要求,请与雷勃电气(无锡)有限公司联系。
1.6 缓慢旋转电动机轴伸,确认电动机可以自由转动。
2.警告!请遵守如下安全预防措施
2.1 负责电动机安装、调试、操作、维护保养和检修的人员必须经过完整的技术培训,以了解其对个人和其
他人员的危险性和对设备的危害性。因为电动机如果没有正确安装、调试、操作和保养,会造成严重或者致命的
伤害。
特定的安全规范请按照国家相关规定。
2.2 电动机维护保养和检修前必须将所有与电动机及其配件连接的电源切断甚至将电源线拆掉,同时确认电
动机已经完全停转。
2.3 电动机必须可靠接地,相应的配套保护装置也必须接地,防止电动机在使用时产生危险,或导致电动机
产生失效故障。
2.4 电动机安全防护和其他保护装置不能开路或不使用,正确和完全的使用各种保护可以保证电动机的寿命。
-1-
2.5 电动机必须有适当的防护,防止工作人员接近旋转体;电动机运转时,严禁触碰转动部分。
2.6 严禁触摸电动机接线等带电部分。有自动启动、自动关闭或遥控启动的场合,在其启动方式未切断时,
必须在电动机四周设立禁示牌,警告电动机可能随时会启动。
2.7 电动机启动前,必须确认所有轴键都已经稳固装妥。
2.8 为了防止电动机过载运行,最好安装绕组温度监测装置。雷勃电气(无锡)有限公司可以在电动机绕组
装设温度保护装置,它的引接线可以直接和控制器连接,用于自动断电保护。
2.9 严禁电动机缺相运行,为了防止此类事情的发生,必须安装缺相保护装置。
2.10 安装联轴器和皮带轮时,不能使用榔头重击,以免导致电动机轴承损坏。
2.11 当接近高噪声源设备时,必须带防护耳罩,电动机的噪声数值可以咨询雷勃电气(无锡)有限公司或者
查阅相关产品标准。
2.12 注意防止水等液体进入电动机内部。
2.13 电动机使用于可变速的机械时,必须确认其没有超过电动机的最大安全速度,同时确认电动机没有超载
使用(在低速时,带自冷却风扇的电动机其散热能力降低,必需增加辅助冷却风扇),如有疑问请接洽雷勃电气
(无锡)有限公司。
2.14 确认已有适当安全防护措施,避免制动失效时产生不安全事件。
2.15 雷勃电气(无锡)有限公司有些电动机带有不停机加油装置,如果电动机在运行过程中需要加入润滑油
脂时,请确认由经过适当培训的人员进行,并且带电体和转动体部分已经有完整的防护。
3. 使用环境和工作条件
3.1 环境温度不得超过 40℃,空气相对湿度不得大于 90%。
3.2 海拔不得超过 1000 米。
注意:当出现与上述环境有偏差时,例环境温度在低于-20 或高于+45℃、空气相对湿度超过 95%、海拔超
过 1000 米以及高振动场合。请确认电动机规范的适用性。如有问题请与雷勃电气(无锡)有限公司联系。
-2-
3.3 电源的频率与铭牌上的数值偏差不得大于 2%,电压的偏差不得大于 5%(双方有约定并经过特殊设计的
除外)。
3.4 开启式电动机(IP23、IP21)适用于干净、干燥、通风良好和没有腐蚀性气体的环境。详细的资料请参
照 GB755。
3.5 封闭式电动机(IP44、IP54、IP55)可适用于相对肮脏、有湿气或尘埃的环境。详细的资料请参照 GB755。
3.6 户外防腐型电动机适用于户外或者有腐蚀性气体的环境,以及高湿气的环境。
重要提示:所有使用场合的周围都不可以阻碍电动机正常的通风。
在电动机周围有另外的通风设备时,必需确认其没有影响电动机的有效通风,如果影响必须调
整通风设备的通风量,或者改变电动机的通风路径,保证电动机的有效通风。
4. 电动机安装和启动
4.1 安装前的检查
4.1.1 检查电动机铭牌所示数值是否与使用要求相符合,电动机的接线是否与接线图相符合。
4.1.2 电动机是否有受潮现象,用兆欧表测量电动机的绝缘电阻,当电动机的绝缘电阻低于 1 兆欧时,必须
对定子线圈进行干燥处理。干燥的温度不允许超过 120℃。
4.1.3 检查电动机有无损坏、变形、紧固件有无松动或者脱落。用手缓慢转动转子,无相擦和异常现象。
4.1.4 检查电动机的安装形式是否与要求符合,IM B3 的电动机不经过改造可能不适合 IM V5(立式轴安装),
可能需要额外的支撑固定或者需要更换不同的轴承来承受轴向推力。
4.1.5 消除电动机上的尘埃、杂物等。
4.1.6 对于电动机存放时间较长(一般超过一年),必须检查电动机的轴承润滑脂的情况。如果需要应该更换
新的轴承润滑脂。
4.2 电动机的安装
4.2.1 电动机安装的基础要有一定的刚度,如果不是和其他机械安装在一起,双方均应该用质量可靠的混凝
-3-
土做基础,安装面要平整。对于经常需要移动的电动机,应采用合适的安装结构。
4.2.2 如果电动机和拖动机械中心高有差异,需要垫高电动机时,垫片的面积必须大于电动机的底脚平面的
面积,当垫片需要用几片调整高度时,其数量不能超过三片。
注意:安装基础没有足够的刚度或者结构不合理,将使电动机运行过程中产生不正常的振动和噪声,导致轴
承损坏,严重的将产生人身或设备事故。
4.2.3 安置地点应该比较宽敞,便于进行日常操作、维护和保养。
4.2.4 电动机允许采用联轴器连接。也可以采用皮带轮和正齿轮连接,请确保电动机轴端的径向力,不致使
电动机受损,如有疑问请和雷勃电气(无锡)有限公司联系。
注意:对于 4KW 以上的 2P 电动机和 30KW 以上的 4P 电动机不宜采用平皮带传动。用皮带轮传动时,皮带
轮的长度不能超过轴伸的长度,否则会引起轴头歪曲和断裂。双轴伸电动机的风扇端轴伸只能使用联轴器连接。
4.2.5 采用皮带轮传动时,必须使电动机的轴中心线和负载轴的中心线平行,并且要求皮带中心与轴中心线
垂直。
采用联轴器传动时,必须使电动机的轴中心线和负载轴中心线重合。
特别注意:采用联轴器传动时,电动机的联轴器和负载的联轴器之间必须留有足够的间隙,防止整个系统在
运行过程中由于热膨胀而导致产生轴向力,使电动机轴承损坏最终使电动机损坏。
4.2.6 安装时请确认各安装孔均以钢质螺栓、螺帽稳固地锁定,容易产生锈蚀的场合应该采用不锈钢螺栓,
高振动场合应该加装防震垫。
4.2.7 注意有泄水孔的电动机,应避免其位置不对。在泄水孔开放的情况下,必须确保有必要的保护,防止
任何物体与电动机内部接触。
4.3 电动机接线
4.3.1 电动机及控制器、过载保护以及接地的接线,必须遵守相关配线标准和安全标准。
4.3.2 电动机接线盒内或者直接在铭牌上有接线指示图,请按照接线指示图正确接线。电动机的接线板有 6
-4-
个接线柱(U1、V1、W1、U2、V2、W2)或者 3 个接线柱(U、V、W),6 个接线柱可以按照接线指示图接成
△或 Y。如果是 3 个接线柱说明已经将其余 3 个引接线在电动机内部并头,只要将外面 3 个接线柱按照 A-U、B-V、
C-W 接好。
注意:按照上述相序接线以后,从电动机轴伸端视之,电动机转向为顺时针。
特殊订货有时电动机转向为逆时针,此时请按照订单要求。
4.3.3 热保护器的接线柱(P1、P2)直接接入电动机控制设备。
4.3.4 有加热器或者 PTO 轴承保护装置的电动机一般有辅助接线盒,请按照相应的接线指示图接线。
4.3.5 对于绕线转子(LSR 系列)电动机应该与串入电阻及电源连接,并且接入控制装置。
4.3.6 在正确接线以后,要根据电动机铭牌的电压和频率来确认供电电源是否正确,确认无误以后才能启动电
动机。
4.3.7 多速电动机的接线,请按照随机的接线图连接,其在不同转速时的转向,应该在调试的时候确认,如
有问题请联系雷勃电气(无锡)有限公司。
-5-
4.4 电动机的启动
4.4.1 电动机的空载运行。
4.4.1.1 检查控制设备中的熔断器的额定电流是否符合要求,安装是否可靠。
4.4.1.2 检查启动装置的接线是否正确,启动装置是否灵活,触头接触是否良好,启动装置是否可靠接地。
4.4.1.3 电动机允许全压启动和降压启动。
注意:电动机全压启动时有 5~8 倍的启动电流,降压启动时启动转矩和电压的平方成正比。当电网容量不足
时可以采用降压启动,但是电动机必须是在空载或者轻载情况下启动。而当静止负载较大时只能采用全压启动。
4.4.1.4 确认电动机转向,如果发现电动机的转向不符合要求,只要任意对调二相接线,电动机转向就可以纠
正。
4.4.1.5 经过上述检查以后,电动机可以空载试运转,一般在电动机脱开负载的情况下运转。空载试运转需要
1~2 个小时,期间观察有无异常现象、不正常的噪音和振动、轴承是否过热或者漏油,发现上述问题必须在负载
运行以前及时进行处理。
4.4.2 电动机的负载运行
在空载运行正常以后可以进行电动机的负载运行。
4.4.2.1 在负载的情况下启动电动机,必须注意电动机如果没有很快启动或者平滑运行,应该立即切断电源,
并检查是否安装不良或接线不对。
4.4.2.2 如果有异常振动,可能是联轴器中心未对准、固定螺栓松动、基础刚性差或者是由于其他机械传递过
来的振动等。异常振动会造成电动机的损坏。
4.4.2.3 如果有异常噪音,可能是电压太低、负载被堵住、转子所拖动的负载太大、电气连接没有完全接好或
者以上问题的综合。异常噪音同样会造成电动机的损坏。
4.4.2.4 请确认运转时的电流与铭牌上的额定电流相符,并且三相电流基本平衡。绕线转子(LSR 系列)电
动机也应确认运转时的电流与铭牌上的额定电流相符,并且三相电流基本平衡。
-6-
4.4.2.5 按照电动机的技术要求,应该限制电动机的启动次数,冷态启动不超过 3~5 次,电动机长期运行或者
在热状态时,停机后再启动应该间隔一段时间,并且不得连续启动二次,否则容易损坏电动机。
4.4.2.6 几台电动机同时使用一台变压器而变压器的容量不够大时,不能同时启动所有的电动机,应由大到小
逐台启动。
5. 检查与维护
为了保证电动机连续安全可靠的使用,必须进行及时的检查和维护,查出隐患防止故障扩大。
请按以下原则进行检查和维护工作。
5.1 电动机在运行时的常规检查。
特别注意:任何噪声和振动的突然增大或者过大,都要立即停机并迅速检查。
在连续运行期间应该定期检查轴承温度,至少每天一次。
5.1.1 电动机应该经常保持清洁,防止油、水等污物进入电动机内部。
5.1.2 电动机应保持良好的通风,进出风口必须保持畅通无阻,风罩的网眼应该经常清理,防止阻塞。
5.1.3 在电动机运行过程中,应该经常监控,如有异常,要立即关机检查,待故障排除以后方可继续运行。
5.2 电动机的停机检查
当发生下列情况必须立即停机检查:
5.2.1 电动机剧烈振动;
5.2.2 电动机拖动设备损坏;
5.2.3 电动机轴承发热严重;
5.2.4 电动机发生窜轴冲击;
5.2.5 电动机发生转速突然下降;
5.2.6 电动机发生扫膛,或者外壳温度迅速上升;
5.2.7 电动机或者起动装置冒烟起火;
-7-
5.2.8 发生人员意外事故。
5.3 电动机的定期检查
根据电动机的使用条件,应该定期对电动机进行检查。
5.3.1 检查电动机的固定螺栓有无松动或者锈蚀等影响固定性能。
5.3.2 检查电气连接是否牢固,有无锈蚀等现象影响接触性能。
5.3.3 检查绕线转子(LSR 系列)电动机滑环的电气连接是否牢固,滑环和电刷是否磨损。
5.3.4 检查电动机接地是否牢固,有无锈蚀等现象影响接地性能。
5.3.5 检查电动机的轴封是否老化,如果老化或者已经磨损,应该更换,如果不了解具体规格可以联系雷勃
电气(无锡)有限公司。
5.3.6 检查联轴器固定牢固并且对心正确。
5.3.7 检查电动机内部是否有有损性能的液体存在,如果有应该将其排除。
5.3.8 检查电动机的轴承,如果已经磨损应该立即更换。
5.3.9 检查电动机的涂漆,如果需要应该重新油漆,防止过度锈蚀。
5.4 电动机的维护
电动机应该周期性的进行保养,发现故障以后及时处理。一般情况每月进行一次小的保养,一年进行一次全
面的保养。
5.4.1 小保养的项目有:
5.4.1.1 清除电动机表面尘埃;
5.4.1.2 测量电动机的绝缘电阻;
5.4.1.3 紧固固定螺栓和接地螺栓,以及各类连接螺栓;
5.4.1.4 清理起动装置和绝缘端子;
5.4.1.5 清理绕线转子(LSR 系列)电动机滑环和电刷部分的尘埃、结碳等;
-8-
5.4.1.6 清理电动机风罩网孔,确保进风和出风口畅通无阻。
5.4.2 全面保养的项目有:
5.4.2.1 小保养的全部项目;
5.4.2.2 电动机内部的清理,使电动机定子绕组达到整洁、无油污和不露铜;
5.4.2.3 电动机轴承是否完好,如果已经损坏立即更换。在正常使用环境下建议每年更换一次轴承(每年运行
时间在 8000 小时左右);
5.4.2.4 如果轴承不需要更换,那么应该对轴承进行清洗,并且更换润滑脂;
5.4.2.5 电动机其他部件的清理或更换。
6. 电动机的润滑
电动机的正确润滑将直接影响轴承的寿命,也将影响到电动机的使用寿命。正确和定期给电动机轴承加润滑
脂(油)就非常重要。
6.1 对于小型电动机我公司已经全面采用双密封轴承(轴承型号后面为“ZZ” ),这种轴承为预注油式,不需
要再注油。
6.2 较大电动机(一般在 H280 及以上)及特定要求电动机,带有注排油装置,这些电动机在出厂时已经注
油,但是需要定期更换油脂。更换油脂的周期根据电动机的大小和使用情况而定。
下面是电动机加油建议值(过度或者频繁的加油也可能使电动机受损)
-9-
90~200 1500 3 个月 3 个月 1 个月
200~630 1500 3 个月 1 个月 15 天
<18.5 3000 5年 3年 1年
18.5~90 3000 1年 6 个月 3 个月
90~200 3000 3 个月 1 个月 1 个月
200~630 3000 3 个月 1 个月 15 天
注:
正常工况:在干净的环境中以额定或者低于额定功率使用,每天 8 小时。
严酷工况:以额定或者低于额定功率使用,每天 24 小时。或在比较肮脏和有尘埃的环境中。或电动机承受
振动或者轻冲击负荷。
恶劣工况:在非常肮脏和尘埃的环境中,或者有重冲击负荷和大的振动。
6.3 加油方法
6.3.1 打开注油嘴和排油口防尘盖,确认注油嘴干净,用手动油枪或者气压油枪接入注油嘴并且打入油脂,
直到从排油口排出新的油脂为止。
6.3.2 移开油枪,让电动机运行 10~20 分钟,确认多余的油脂已经排出,将注油嘴和排油口防尘盖盖好,加
油结束。
6.4 润滑油脂的类型
使用正确的润滑油脂。如果加入的油脂和原来的油脂不相容,将大大降低轴承的寿命,如果不能确定是什么
牌号,请联系雷勃电气(无锡)有限公司。
雷勃电气(无锡)有限公司给可注油电动机使用的轴承润滑油脂牌号是嘉德士 SRI-2(进口轴承),津脂中小
-10-
型电机轴承润滑脂 2 号(国产轴承) 。
特别注意:如果电动机在不停机的情况下加油,必须有经过训练的人员进行,并且带电部分和旋转部件有完
整的保护。
7. 电动机的储存
7.1 电动机应该储存在清洁、干燥和无腐蚀性气体的环境中。
7.2 储存地点应该避免周围环境剧烈变化。
7.3 储存时间不能太长,不宜堆得过高,以免损坏电动机。
7.4 如果电动机长期储存在潮湿的环境中,使用必须确认电动机的绝缘电阻大于 1 兆欧,如果低于 1 兆欧应
该进行烘干处理,经过烘干处理以后仍然达不到 1 兆欧,电机必须送修。
注:电动机烘干方法
方法 1:将电动机拆开,把定子绕组置于烘房内,绕线转子电动机将转子同时置于烘房内,烘房温度不超过
100℃。注意烘房内、外必须保持良好通风。一般当绝缘电阻大于 1 兆欧以及绝缘电阻停止变化,说明烘干结束。
方法 2:将电动机转子堵住,对电动机绕组加低电压,一般要求施于电动机绕组的电流约为铭牌额定电流的
1/3~1/2。注意确保电动机绕组的温度不要超过 120℃,当绝缘电阻大于 1 兆欧以及绝缘电阻停止变化,说明烘
干结束。
7.5 电动机经过长期储存,应检查轴承是否生锈,如果生锈必须更换新品。同时要补充新的润滑脂。
7.6 有加热装置的电动机在电动机储存期间必须接通加热器,防止电动机在储存期间受潮。
8. 报废电动机的处理
根据国家对环境保护的要求,电动机寿命终了以后应该根据电动机材料进行分别处理,以免在处理过程中对
环境造成影响。
电动机主要的材料是铸铁、钢铁、铜、铝和绝缘材料。
一般金属材料可以回收利用。非金属材料无法回收,可以通过燃烧等方法处理,但是必须确保燃烧过程对环
-11-
境不造成污染。
请根据国家相关法规进行处理。
9. 电动机常见故障与分析排除
-12-
1. 电机或负载安装松动。 1. 检查并紧固底脚螺栓。
2. 联轴器或皮带轮偏心或平 2. 校准偏心或重新平衡。
5 振动异常 衡不好。
3. 轴伸撞击后弯曲。 3. 更换转子或轴。
4. 转子平衡不好。 4. 重新平衡。
1. 轴承损坏。 1. 更换轴承。
2. 轴承润滑脂充填量不当或 2. 更换润滑脂,润滑脂充填量为 1/2~2/3 之间。
润滑脂质量不好。 3. 校准联轴器或者调整皮带轮张力。
3. 联轴器不对中心或皮带轮 4. 更换已经磨损的端盖、轴或者转子。
6 轴承过热
太紧。 5. 重新装配电动机。
4. 轴承室和轴磨损引起走钢
圈。
5. 电动机装配不良。
1. 负载太大。 1. 选择大一档电机或降低负载。
2. 环境温度太高。 2. 降低环境温度或降低负载。
3. 电源电压太高或过低。 3. 检查原因,确认电压太高或过低,可以降低
7 温升高或冒烟
负载或停机。
4.电动机二相运行。 4. 检查电气连接,排除缺相故障。
5.电动机通风道堵塞。 5. 清除电动机进出风口的污垢和杂物。
-13-
-14-
2.2 Before maintaining, must turn off all supply connected with motor and its auxiliary parts.
Confirm that the motor is already standstill.
2.3 The motor and protection devices must be grounded to prevent accidents or failures in service.
2.4 The protection devices should not be open circuit and should be used. The protection devices
can ensure the life of motor.
2.5 The motor must have proper protective device to prevent operators from getting close to the
rotating parts; Do not touch the rotating parts when the motor is running.
2.6 No contact with live parts. Under the occasions of auto-starting, auto-shutting and remote
starting, must set a sign plate to note that the motor will start at any time before turn off.
2.7 Before starting, confirm that all shaft and keys are fitted firmly.
2.8 In order to prevent overload, you’d better to install the monitor of winding temperature. Regal
Beloit(Wuxi)Co.,Ltd . can install the temperature protector of winding, its lead wires connect directly
with controller to provide the protection of automatic power off.
2.9 No phase operation in service. It is recommended to install the phase failure protection device.
2.10 Never fit a coupling or pulley by a hammer, so as not to damage the bearing.
2.11 When access to the noise source, must wear the earhood.
For more information about noise limits, please contact Regal Beloit(Wuxi)Co.,Ltd . or reference
the relevant product standard of Regal Beloit(Wuxi)Co.,Ltd .
2.12 Protection against the ingress of water.
2.13 When motor used in varied speed mechanism, confirm that it do not exceed the maximum
safety speed of motor and operate without overload. (At lower speed, the ventilation of the
totally-enclosed fan-cooled motor will decrease. The auxiliary cooling fan should be added). Any
-15-
-16-
Note: All operating environment cannot stop motor from normal ventilation.
If there are other ventilators, assure they do not affect the ventilation of motor. If it
is affected, must adjust the air volume of ventilator or change the ventilating path of
motor to ensure the ventilation effectively.
4. Installation and Starting
4.1 Check before Installation
4.1.1 Check all rating data of nameplate, and winding connection.
4.1.2 Measure the insulation resistance of the motor by the use of a “Megger”. If the resistance is
below 1 megohm, the stator coil must be dried out thoroughly.The drying temperature do not exceed
+120℃.
4.1.3 Check the motor for damage, distortion, loose. Rotate the rotor by hand to check no abnormal
occurrence.
4.1.4 Check whether the motor mounting mode is in line with the requirements. The basic type of
construction IM B3 can be modified as other type of construction IM V5 by additional support or
changing bearing to bear the axial force.
4.1.5 Clean dust and other thing on the motor.
4.1.6 For long period storage motor (usually over 1 year), check the lubrication and replace it if
necessary.
4.2 Installation
4.2.1 Foundation of motor should be rigid. If motor is not connected with other equipment, both
are installed on foundation made in concrete. The suitable type of construction should be chosen for
frequent remotion.
-17-
4.2.2 Any height differences between the motor and the driven machine should be adjusted. The
surface for the shims must be bigger than that for the feet. The amount of the shims is less than 3.
Note: Insufficient rigidness or improper structure of foundation will lead to abnormal
vibration and noise and even shaft fracture, further to accident when the motor is running.
4.2.3 The place should be spacious enough for daily operation, maintenance.
4.2.4 Motors can be connected by coupling joints, belt pulleys or gearings, and must insure the
radial force at motor’s shaft end to protect the motor from damages. Any questions, please contact Regal
Beloit(Wuxi)Co.,Ltd .
NOTE: The flat belts do not apply to 2P motor above 4kW and 4P motor above 30Kw for
power transmission. The length of the sheave should not be greater than the shaft extension,
otherwise can lead to shaft fracture. The fan end of the double shaft extension motor should be
connected with the coupling only.
4.2.5 When belt pulley is adopted, ensure the parallelism of the motor shaft and the bearing shaft.
And keep the vertical of the motor shaft and the belts.
When coupling is adopted, make the motor shaft and bearing shaft coincide.
NOTE: When coupling is adopted, there must be enough space between couplings of motor
and of driven machine to prevent axial force caused by heat expanding and further to lead to
bearing failure.
4.2.6 Please confirm that all mounting holes are locked by steel bolts, and nuts. At the place which
is easy to get rust, stainless steel bolts should be used, and for the high vibration situation, anti-vibration
pad must be used.
4.2.7 For the motors which have drain holes, ensure that the drain holes are at the right position.
-18-
When the drain holes are open, measure must be done to protect against the ingress of any object.
4.3 Connection
4.3.1 Connections of motors, controllers, over-load protections, and groundings must in line with
related wiring standard and safety standard.
4.3.2 Note nameplate markings and connection diagram in the terminal box. The 6 terminals are
marked with letters U1, V1, W1 and U2, V2, W2 or the 3 terminals are marked with letters U, V, W. The
6 terminals may be connected △ or Yaccording to the connection diagram. The 3 terminals are
connected according to A-U, B-V, C-W.
Note:Check the phase sequence from the connection diagram, the phase sequence for
clockwise rotation looking from the D-end of the motor. For counter-clockwise rotation, the phase
sequence is in accordance with ordering.
-19-
4.3.3 Connect terminals of thermal protector (P1, P2) to the motor control equipment directly.
4.3.4 Generally, there’re auxiliary terminal boxes for those motors which have heaters or PTO
bearing protective devices, please connect according to the connection diagram.
4.3.5 For the wound rotors (LSR series), motor should be connected to the resistance and the power
supply, and inset to the control device.
4.3.6 It is important to verify that the supply voltage and the frequency are the same as the values
indicated on the nameplate of the motor before starting.
4.3.7 For multi-speed motor, please connect as per the random connection diagrams. The rotation
direction at different speed should be confirmed during debugging. Any question, please contact Regal
Beloit(Wuxi)Co.,Ltd ..
4.4 Starting up
4.4.1 No-load running
4.4.1.1 Check whether the rated current of control equipment’s fuse complies with the requirement,
and whether it is safe.
4.4.1.2 Check whether the connection of starter is correct, flexible, the contact is in good condition,
and the starter has reliable earthing.
4.4.1.3 The motor can have direct-on-line starting or auto-transformer starting.
Note:There is 5-8 times starting current when direct-on-line starting, and starting torque is
direct proportion with the square of voltage when auto-transformer starting. Adopt
auto-transformer starting for under-voltage, but it must in the situation of no-load running or
light-load running. If the static load is heavy, only adopt direct-on-line starting.
4.4.1.4 Check the direction of rotation of the motor, if it is wrong, exchange the two-phase wire
-20-
randomly, then the problem will be solved.
4.4.1.5 After the above inspections, motor can have no-load test run, which will cost 1~2 hours.
During that period, observe whether there’s any abnormal phenomenon, noise or vibrations, and
whether the shaft is overheated or has oil leakage problem. Any of such problems must be solved
immediately before load running.
4.4.2 Running with load
After no-load test run, load running can be carried out.
4.4.2.1 Start up the motor with load, if the motor doesn't start immediately, or runs smoothly, shut
off the power supply and check the installation or the wirings.
4.4.2.2 Coupling misalignment, fixed bolts loose, poor foundation stiffness or vibration transferred
from other machines all may lead to motor abnormal vibration, which will cause damages to the motor.
4.4.2.3 Low voltage, over-load for rotors and uncompleted electric connections or combination of
such problems may lead to abnormal noise, which will also cause damages to the motor.
4.4.2.4 When the motor is running, make sure the current is identical to the ratings shown on the
nameplate. Keep current balance of 3-phase windings. The same for wound rotor motor (LSR series).
4.4.2.5 According to the technical specs, starting times should be controlled. Cold start must be not
more than 3~5 times. If the motor have run for a long time or is under heat condition, should not restart
it immediately after a shut-off, and cannot restart continuously, otherwise, the motor will get damaged.
4.4.2.6 If one transformer is shared by several motors, and its capacity is not large enough, then,
start motors in the order of large motor to small motor.
5. Inspection and Maintenance
In time inspection and maintenance are needed to find out hidden dangers and to prevent failures
-21-
-22-
According to service conditions, regular check should be taken to motors.
5.3.1 Check whether the fixed screws are loose or rusted, which will affect the fixing performance.
5.3.2 Check whether the electric connection is fastened, and whether is rusted which will affect the
performance.
5.3.3 Check whether the electric connection for the slip ring of wounded rotor (LRS series) motor
is fastened, and whether the slip ring and brush is wore out.
5.3.4 Check whether the earthing is fastened, and whether is rusted which will affect the earthing
performance.
5.3.5 Check whether the shaft seal is aged, if it is aged or wore out, change it. You can contact
Regal Beloit(Wuxi)Co.,Ltd . for any detailed spec.
5.3.6 Check the coupling is fastened, and ensure the concentricity.
5.3.7 Check whether there’s liquid that will affect motor performance inside the motor, if there is,
discharge it.
5.3.8 Check the bearing, if it is worn out, change it immediately.
5.3.9 Check paint on the motor, if needed, re-paint the motor to prevent over-rusted.
5.4 Motor Maintenance
Motors should have periodic maintenance, and the failures should be disposed immediately.
Generally, a rough maintenance per month, and an overall maintenance per year is needed.
5.4.1 Rough maintenance includes:
5.4.1.1 Clear the dust on the motor surface;
5.4.1.2 Measure motor’s insulation resistance;
5.4.1.3 Fasten the fixed bolts, earth studs, and other connecting bolts;
-23-
-24-
Rated Power Speed The recommended lubrication intervals
(KW) (rpm) Normal condition Severity condition Bad condition
<18.5 1500 5 Years 3 Years 1Year
18.5~90 1500 1Year 6 Months 3 Months
90~200 1500 3 Months 3 Months 1Month
200~630 1500 3 Months 1Month 15 Days
<18.5 3000 5Years 3Years 1Year
18.5~90 3000 1Year 6 Months 3 Months
90~200 3000 3 Months 1 Month 1Month
200~630 3000 3 Months 1 Month 15 Days
NOTE:
Normal condition refers to the motor operate at rated power or below in clean environment.
Duty cycle is no more than 8h per day.
Severity condition refers to the motor operate at rated power or below in dust environment
with the lighter shock load and vibration. Duty cycle is 24h per day.
Bad condition refers to the motor operate in very dirty environment with heavy shock load
and vibration.
-25-
-26-
Method 1:Dismantle motor and put the stator winding into the oven. For the wound-rotor motor,
rotor should be put into the oven at the same time. Oven temperature should be less than 100℃. Keep
good ventilation inside and outside oven. When insulation resistance exceeds the 1M ohm or insulation
resistance value gets steady, oven dried is over.
Method 2:Stall the rotor and apply lower voltage to winding, ensure that the applied current is 1/3
to 1/2 of rated current. Winding temperature should be less than 120℃. When insulation resistance
exceeds the 1M ohm or insulation resistance value gets steady, oven dried is over.
7.5 Check rust on the bearings after long period storage, if has, replace with new shaft, and add
fresh grease.
7.6 If the motor is equipped with space heater, the space heater must be switched on to prevent
motor from dampness.
8. Handling for discarded motor
According to the national environment protection requirements, when the motor is at the end of its
service life, it should be disposed separately as per its materials, so as to avoid environment pollution.
The material content used in the manufacturing of the motor is as follows: cast iron, steel, copper,
aluminium, insulation materials.
General metal materials can be recycled. The nonmetal should be either incinerated, but attention
should be paid to ensure that such process will not adversely affect environment.
Please dispose the motors in line with the national regulations.
9. Common Failures and Troubleshooting
-27-
Vibration 1. Motor or loaded installation 1. Check and fasten the foot bolts.
5 abnormal is loose. 2. Align central points or rebalance.
-28-
2. Coupling or belt pulley is off 3. Change rotor or shaft
center or is unbalanced. 4. Rebalance
5 3. The shaft extension gets bent
after being hit.
4. Unbalanced rotor.
1. Damaged bearing. 1. Replace the damaged bearing.
2. Poor lubrication. 2. Changing grease, and the grease takes
3. Misalignment between motor up 1/2~2/3.
Bearing
6 and driven machine shafts. 3. Adjust belt tension or align couplings.
overheating
4. Friction between bearing and 4. Replace the damaged end-shield, shaft
bearing house or shaft. or rotor.
5. Improper assembly. 5. Re-assembly motor.
1. Over loaded. 1. Choose a larger motor or reduce the
2. Ambient temperature is too load.
high. 2. Lower the ambient temperature or
3. Supply voltage is too high or reduce the load.
High
too low. 3. Confirm the reason, and reduce the
7 temperature
4. Motor runs with 2 phase. load or shut off the machine.
rising or faming
5. Airways are blocked. 4. Check the electric connection, and
clear the failure of lacking of phase.
5. Clean the sundries at the inlet and
outlet.
-29-
-30-
6.2 Coupling 联轴器
*Origin 产地:China 中国
*Manufacturer 制造商: Wuxi Trumy Transmission Engineering Co., Ltd.
无锡创明传动机械有限公司
*Model 型号: LJQ-270
Assembly Instructions
LJQ Series Disc Coupling
D-SM137
1st Edition
无锡创明传动工程有限公司
WUXI TRUMY TRANSMISSION ENGINEERING CO.,LTD.
No.8 Second Huayou Road Wuxi New District,Jiangsu China 214142 Phone:+86 510 85701227 Fax:+86
510 85706330 http://www.trumy.com
Outline Drawings of coupling
LJQ Series Assembly Instructions
1. Technical Instructions
The technical data such as basic dimensions, rating torques, maximum permissible speed, compensating
abilities, operating temperature range etc. mentioned in this assembly instruction are documented in the product
catalogues. These catalogues are available on request or can be seen and downloaded at any time in the World
In case of differences between the coupling design and the corresponding product catalogue, the delivery
contains a dimension drawing which includes all necessary technical data.These data and the contractual
agreement for the coupling determine the limits of its intended use.
service factor, adequate to the application. In case of changes in operating conditions (power rating, speed,
Caution:TRUMY will not be bound by the terms of the guarantee or otherwise be responsible in cases
of improper use of the coupling, modifications carried out without TRUMY’s agreement, or use of spare
Notice: All persons involved in the installation, operation, maintenance and repair of the coupling
must have read and understood this Assembly Instruction and must comply with them at all times. We
2. Condition on delivery
2.1 The coupling components which are delivered with this instruction are coated with corrosion preventative.
2.2 The disc packs are factory assembled and should not be disassembled.
2.3 The coupling components have been assembled in line with the mounting condition. And the fasteners are
第 1 页共 9 页
LJQ Series Assembly Instructions
Possible transport damage and/or missing parts should be reported immediately in writing and we will settle it
immediately.
3.2 Transport
Notice: When handling TRUMY products, use only lifting and handling equipment of sufficient
load-bearing capacity! The coupling must be transported using suitable transport equipment only.
Subject to transport route and size, the coupling is packed differently. Possible symbols on the packaging
3.3 Storage
The couplings are not to be stored together with corrosive chemicals, acids, alcaline solutions etc. The
coupling is supplied with a protective coating and can be stored for up to 6 months, indoors at a dry location. In
Caution: Damp storage places (relative humidity above 65%) are unsuitable. Care should be
4. Hub assembly
4.1 Preparations
4.1.1 Read the assembly instructions carefully and understand the assembly process.
4.1.2 Check the coupling for possible transport damage and missing parts. Clean the coupling components.
Before starting assembly, the bore holes and the shaft ends must be recovered from dirt and all kinds of
rust-preventative such as paint.The key(s) should have a snug side-to-side fit with a small clearance over the top.
Notice: The clearance of shaft and bore is essential. Any foreign matter on the counterface may lead to
misalignment.
Notice: Trumy’s products are oxygenized or black-phosphorized and coated with rust-preventative oil
before shipment. After the installation of hubs or coupling halves take rust prevention treatment
第 2 页共 9 页
LJQ Series Assembly Instructions
Declare: Heating may influence the color of the surface, recover it with rust-preventative oil. Test shows
z Mounting position of hubs refer to assembly drawing. Place distance blocks to bridge the gap between
z For hub with clearance fit, install the hub on the shaft directly, use soft hammer to hit the hub.
z For hub with transition fits, warm the hubs moderately and oil the shaft ends slightly.
z For hub with shrink fit, warm the hub in oil or oven to facilitate mounting. The heating temperature is
restricted by the shrinkage value, usually 120℃ to 250℃. To avoid premature binding, joining should be
z An open flame is not recommended. However, if flame heating is necessary, use a very large rose bud tip
第 3 页共 9 页
LJQ Series Assembly Instructions
Put the hub on the shaft. Lightly tap hub up the shaft with a soft hammer. This will assure a metal-to-metal
fit between shaft and hub. This is the starting point for the axial draw. Record this position between shaft end
and hub face with a depth micrometer. Mount a dial indicator on the shaft to read axial hub movement. Set the
indicator to “0”. Drawing the hub up the shaft to the desired axial position. Use the indicator as a guide only. A
pre-set axial stop device can be helpful. Check the final results with depth micrometer. The axial pulling or
pushing force must maintain adequate time after installation so that the hub retaining at the position. Install shaft
The shrink of hole and shaft should refer to installation drawing or standard specification.
6. Alignment of shafts
6.1 Axial spacing
Place the rotors of driving and driven machines onto the operating positions, measure F (refer to
fig. 7.1)-the distance between the two mounting surfaces of flanges. Take 4 readings along circumferences with
almost 90° interval and adopt the average value. F dimension must in accordance with the dimension labeled in
第 4 页共 9 页
LJQ Series Assembly Instructions
Alignment should be checked by caliper, ruler or gage, ect. (refer to fig. 6.1)
ΔKw=Lmax-Lmin
Fig.6.1
第 5 页共 9 页
LJQ Series Assembly Instructions
7.2 Insert disc packs and tighten the bolts with the specified tightening torque(see table 2),Slightly grease the
Caution: Ensuring the tightening torque is important for the coupling safety ,torque wrench
第 6 页共 9 页
LJQ Series Assembly Instructions
7.3 Turn the drive train for 2 or 3 rounds gently to make sure that the drive train rotates freely.
Caution: All rotating parts are potentially danger, must be enclosed with protecting guards. For use in
hazardous areas the protecting guards must be conform to type of protection IP2X at least.
8. Disassembly
Caution: Secure coupling components to be loosened! Danger of injury due to drop down of coupling
components.
8.1 Get familiar with the structure of coupling and the disassembling processes prior to disassembly. Take care
8.2 Remove the bolts and disc packs first and then place the ring on the driven shaft ,take out the ring spacer
8.3 For hub with key-connection, pull out the hub by placing a pulling device in the threaded holes. Heat the
hub if necessary.
Caution: Heating the hub speedily and uniformly. Heating temperature not exceed 400℃.
Different operating behaviour should be seen as a fault, which has to be remedied promptly.
第 7 页共 9 页
LJQ Series Assembly Instructions
Experience has shown that the following faults can result in incorrect use of the coupling. In addition to
observing the other instructions in this Assembly Instructions, care must therefore be taken to avoid these faults.
A damaged coupling becomes an explosion hazard. Operation of the coupling with damaged coupling
components is inadmissible.
Caution: Incorrect use of the coupling may result in damage to the coupling and then the stoppage of
entire system.
·Important information for describing the drive and the environment will not be communicated to others.
·When mounting coupling parts in a heated condition, the parts are being excessively heated.
·Prescribed tightening torques or rotation angles are not being adhered to.
·Alignment or shaft misalignment values do not match the specifications of these operating or assembly
instructions respectively.
·The coupled machines are not correctly fastened to the foundation, so a shifting of the machines arose.
·The coupling guard used is not suitable for operation within the meaning of the explosion protection
requirements.
·Original TRUMY disc packs and fasteners are not being used.
第 8 页共 9 页
LJQ Series Assembly Instructions
·Leakage in the vicinity of the coupling is not being identified and as a result chemically aggressive media are
10. Maintenance
TRUMY couplings should be visually checked corresponding to the maintenance schedules of the plant,
·Defects such as bruise marks, cracks and permanent deformations on the outside surfaces of disc packs.
·Changing on alignment of the drive train. In case the disalignment value exceeds that of the specified, align the
第 9 页共 9 页
6.3 Pressure gauge 压力表
*Origin 产地:China 中国
*Manufacturer 制造商: Shanghai Automation Instrumention CO., Ltd.
上海自动化仪表厂
*Model 型号: Y-100B
英文说明书
PRESSURE GAUGE
FEATURES
All stainless stellconstruction
High accuracy &durability
Superior corrosion resistance
Available oil filled for vibraion
damping & extended life
Stem &panel mount
APPLICATIONS
Chemical & petrochemical plants
Industrial machinery
Pumps & compressors
HVAC systems
Power plants & steam boilers
High virbrations, pulsation & shock
environment
SPECIFICATIONS
Measuring Range & Accuracy
Measuring Ranges
MODEL accuracy Case: Polished 304 Stainless stell
(MPa) (Hg~Psi)
Bourdon Tube: 316 Stainless stell
Y-60B-F
0~0.6、1、1.6、2.5、4、6 Connection: 316 Stainless stell 1/8’’NPT
Y-60B-FZ
10、16、25、40、60 2.5 for 60mm gauge & 1/4’’NPT or 1/2’’NPT
Y-63B-F
-0.1~0.5、0.9、1.5、2.4 for 100mm & 150mm gauges
Y-63B-FZ
Movement Parts: 304 Stainless stell
0~0.1、
0.16、
0.25、
0.4、
0.6、
1、
Dial: Aluminum
Y-100B-F 1.6
Dial Arc: 270O
Y-100B-FZ 2.5、4、6、10、16、25、40、60
Pointer: Aluminum
Y-150B-F -0.1~0、0.06、0.15、0.3
1 Window: Dual glass
Y-150B-FZ 0.5、0.9、1.5、2.4
Oil Fill: Glycerin or silicone
Y-103B-F (-30″~0、15、30、60、100、
1.5 Operating Temperatures:
Y-103B-FZ 150;0~150、
30、
60、
100、
200、
-40 ~ 70 ℃ (No oil-filled in the enclosure)
Y-153B-F 300、400、600、800、1000、
-25 ~ 70 ℃ (Oil-filled in the enclosure)
Y-153B-FZ 1500、
2000、
3000、
4000、
6000、
10000)
DIMENSIONS
Unit: Length in mm(inch)
D d0 d1 H1 H2 L L1 L2
60 72 4.5 <60 <18 14 30 55
2.36 2.83 0.18 0.71 0.71 0.55 1.18 2.17
100 116 4.8 <35 <35 20 50 98
3.94 4.57 0.19 1.38 1.38 0.79 1.97 3.86
150 165 5.8 <125 <60 20 50 98
5.91 6.5 0.23 4.92 2.36 0.79 1.97 3.86
TO ORDER
Please specify the model, name, accuracy, mount, size of connection screw,
measuring range&whether or not with oil-filled.
6.4 Pressure switch 压力开关
*Origin 产地:USA 美国
*Manufacturer 制造商: UE
*Model 型号:H100-218-1519-M201
6.5 Bimetallic thermometer 双金属温度计
*Origin 产地:China 中国
*Manufacturer 制造商: Shanghai Automation Instrumention CO., Ltd.
上海自动化仪表厂
*Model 型号: WSS-471
SERIES WSS
BIMETAL THERMOMETERS
INSTRUCTION MANUAL
BIMETAL THERMOMETERS
1. INTRODUCTION
Model WSS bimetal thermometers are compacted industrial temperature indicators, ruggedly built
and engineered for years of trouble-free operation, Other than routine attention to cleaning and
checking, no maintenance or lubrication whatever is required .Stem ,case ,process connection
and connectors are constructed 1Cr18Ni9Ti stainless steel with a clear glass lens .The bezel and
case thermometers are guaranteed to remain excellent watertight and corrosion resistance under
harsh conditions . With elbow construction, the bottom versions exhibit original in constructions
with attractive overall appearance and lightness. All models feature a silicon dampened
bimetal helix and a balanced pointer for quick, accurate readings. Compared with
mercury-in-glass thermometers, bimetal thermometers are free of poisonous mercury, ease of
reading and durability, ideal for in-field temperature indicating.
Other bimetal thermometers with additional measuring ranges and stem lengths not shown in this
pamphlet are also available. Consult factory for details.
.
2. OPERATING PRINGIPLE
The bimetal thermometers are operated on base that , one end of the bimetal strips made of
spiral tube, is fastened and the other free end is connected with the pointer. The free end rotates
in pace with the variation of the temperature and the pointer on the dial, thus, indicating the
temperature.
3.SPECIFICATIONS
4.DIAL STYLES
4.1 Back Connected Style
The axle of the sensing element is in perpendicular with the dial plane as shown in Figure 1.
4.2 bottom connected Style
The axle of the sensing element is in parallel with the dial plane as shown in Figure 2
4.3 Adjustable Angle Style
The bimetal thermometers with adjustable angle style are of ease of viewing and reading by
bending.
4.4 With electro-contacts, give electricity contacts for autocontrol or alarm. The contacts are
upper limit and lower limit or two upper limit .the contact rating power is 10VA, maximum working
voltage is 220V, maximum working current is 1A, The bimetal thermometer with contact is shown
in Figure 4 to Figure 6.
Bimetal Thermometer With contacts Wiring Diagram
yellow/ yellow/
green green
3 4 1 2 3 4
1 2
Brown Black Blue Brown Black Blue
C C
D B D
B
90°
S
A
h
h1
d1
A
T
A'
A
S
S
h
h1
h2
h3
H
d1
T
L
d1
T
L
L
d d d
B
A
90°
D
h1
h
A
h3
h2
H
A
d1
A'
T
h
h1
h
h1
h3
h2
H
h3
h2
H
d1
T
L
d1
T
L
d d d
Dial D A A’ B C d d1 H h h1 h2 h3 S S’ T
Style
Back φ67 64 26 φ6 φ M16*1.5
connected 14 G1/2’’
φ107 68 25 φ φ M27*2
φ157 27 10 24 G3/4’’
Bottom φ67 69 26 43 φ6 φ M16*1.5
connected 14 G1/2’’
3 24 16 28 24 30 32
φ107 88 25 58
φ157 114 27 60
Adjustable φ107 156 98 25 68 φ
Angle 10 M27*2
φ157 182 122 27 70
φ G3/4’’
Back with 101
24
contact
Bottom 88 93
with φ107 60 φ
Contact 10
Angle with 186 98 104
contact
7.ORDERING INFORMATION
W S S _ -- _ _ _
Process Connection
1) Adjustable male thread connector
2) Adjustable female thread connector
Dial Style
0) Back connected
1) Bottom connected
8) Adjustable angle
5) Back connected with thermowell
6) Bottom connected with thermowell
Dial Size
3) 60mm
4) 100mm
5) 150mm
X with contact
Bimetal Thermometer
9.HOW TO ORDER
To order a bimetal thermometer, please specify the dial style ,dial size ,stem length. Other
requirements, such as stem materials(0Cr18Ni12Mo2ti,SUS304 or SUS316 stainless steel), ANA
abrasion and corrosion resistance coating, connection mode, should also be specified if
necessary.
*Origin 产地:Japan 日本
*Manufacturer 制造商: SMC
*Model 型号:VXD242
6.7 Heat exchanger 换热器
*Origin 产地:China 中国
*Manufacturer 制造商: Funke 风凯
*Model 型号:FP10
6.8 Rotameter 转子流量计
*Origin 产地:China 中国
*Manufacturer 制造商:ChangZhou 常州
*Model 型号:FA20-40F
7 Drawings, Lists, Diagrams, etc
图纸,清册,图表
Rev.G G320014 TURBINE 40MAJ41CL001-XG02 VACCUM PUMP A SEPARATOR LEVEL NORMAL VAC PMP A SEP LVL NORMAL DI Y Y
Y
Rev.G G320014 TURBINE 40MAJ41CL001-XG01 VACCUM PUMP A SEPARATOR LEVEL LOW VAC PMP A SEP LVL LOW DI Y Y Y
Y
Rev.G G320014 TURBINE 40MAJ41CT001-XQ50 VACCUM PUMP A SEALING WATER TEMPERATURE HIGH VAC PMP A SEAL WATER TEMP HI AI 0 100 °C Y Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB01 VACUUM PUMP A INLET VALVE OPENED VAC PMP A INLT VLV OPD DI Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB02 VACUUM PUMP A INLET VALVE CLOSED VAC PMP A INLT VLV CLSD DI Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB03 VACUUM PUMP A INLET VALVE FAULT VAC PMP A INLT VLV FAL DI Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB04 VACUUM PUMP A INLET VALVE REMOTE VAC PMP A INLT VLV RMO DI Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB91 VACUUM PUMP A INLET VALVE OPEN COMMAND VAC PMP A INLT VLV OP CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ41AA101-XB92 VACUUM PUMP A INLET VALVE CLOSE COMMAND VAC PMP A INLT VLV CL CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ41AA102-XB91 VACUUM PUMP A MAKE-UP VALVE OPEN COMMAND VAC PMP A MK-UP VLV OP CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ41AP001_XQ50 VACCUM PUMP A MOTOR WINDING TEMPERATURE U VAC PMP A MOT WDG TEMP U PTC 150 °C Y
MCC
Rev.G G320014 TURBINE 40MAJ41AP001_XQ51 VACCUM PUMP A MOTOR WINDING TEMPERATURE V VAC PMP A MOT WDG TEMP V PTC 150 °C Y
MCC
Rev.G G320014 TURBINE 40MAJ41AP001_XQ52 VACCUM PUMP A MOTOR WINDING TEMPERATURE W VAC PMP A MOT WDG TEMP W PTC 150 °C Y
MCC
Rev.G G320014 TURBINE 40MAJ42CP001-XG02 VACCUM PUMP B INLET PRESSURE LOW VAC PMP B INL PRESS LOW DI -1 0 BAR Y Y
Rev.G G320014 TURBINE 40MAJ42CL001-XG02 VACCUM PUMP B SEPARATOR LEVEL NORMAL VAC PMP B SEP LVL NORMAL DI Y Y
Y
Rev.G G320014 TURBINE 40MAJ42CL001-XG01 VACCUM PUMP B SEPARATOR LEVEL LOW VAC PMP B SEP LVL LOW DI Y Y Y
Y
Rev.G G320014 TURBINE 40MAJ42CT001-XQ50 VACCUM PUMP B SEALING WATER TEMPERATURE HIGH VAC PMP B SEAL WATER TEMP HI AI 0 100 °C Y Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB01 VACCUM PUMP B INLET VALVE OPENED VAC PMP B INLT VLV OPD DI Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB02 VACCUM PUMP B INLET VALVE CLOSED VAC PMP B INLT VLV CLSD DI Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB03 VACCUM PUMP B INLET VALVE FAULT VAC PMP B INLT VLV FAL DI Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB04 VACCUM PUMP B INLET VALVE REMOTE VAC PMP B INLT VLV RMO DI Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB91 VACCUM PUMP B INLET VALVE OPEN COMMAND VAC PMP B INLT VLV OP CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ42AA101-XB92 VACCUM PUMP B INLET VALVE CLOSE COMMAND VAC PMP B INLT VLV CL CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ42AA102-XB91 VACCUM PUMP B MAKE-UP VALVE OPEN COMMAND VAC PMP B MK-UP VLV OP CMD DO 24VDC Y
Rev.G G320014 TURBINE 40MAJ42AP001_XQ50 VACCUM PUMP B MOTOR WINDING TEMPERATURE U VAC PMP B MOT WDG TEMP U PTC 150 °C Y
MCC
Rev.G G320014 TURBINE 40MAJ42AP001_XQ51 VACCUM PUMP B MOTOR WINDING TEMPERATURE V VAC PMP B MOT WDG TEMP V PTC 150 °C Y
MCC
Rev.G G320014 TURBINE 40MAJ42AP001_XQ52 VACCUM PUMP B MOTOR WINDING TEMPERATURE W VAC PMP B MOT WDG TEMP W PTC 150 °C Y
MCC
H. VACUUM SYSTEM
Single switch with internal
40MAJ41CP001 H100-218-1070-
1 VAC PMP A INL PRESS LOW G320014 C Pressure Switch -1 0 Bar(g) adjustment,single UE
40MAJ42CP001 M201
conduits,IP65,±1.0%;125VDC/10A
40MAJ41CL001 L=300mm/ANSI B16.5 3/4" 150#,RF BM26/P/C
2 VAC PUM A SEP LVL IND G320014 C Level Indicator 0 300 mm KROHNE
40MAJ42CL001 Flange;SS304,IP67,IP65,±10mm 3/4"/150lb
40MAJ41CL001
3 VAC PMP A SEP LVL LOW G320014 C Level Switch N/A N/A N/A 24VDC/5A,1A, IP65,SPDT. ±10mm KROHNE MS15/MC,SPDT
40MAJ42CL001
40MAJ41CL001
4 VAC PMP A SEP LVL NORMAL G320014 C Level Switch N/A N/A N/A 24VDC/5A,1A, IP65,SPDT. ±10mm KROHNE MS15/MC,SPDT
40MAJ42CL001