You are on page 1of 24

FusionModule800 Smart Small Data Ce

V100R001C00
Survey Report Template

Issue

Version 1.0 (2016-08-30)

.Huawei Technologies Co., Ltd


mall Data Center
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
Note:
1. This table is for internal use or is used as a draft. The customer does not need to sign
this table. However, this table can be used as a design reference. The final deliverable is a
survey report which the customer needs to sign.
2. The survey checklist provides the Use and Remarks column. Use describes the survey
purpose and function. Remarks explain the terminology and technical content in the
survey.
3. This survey includes the site selection of the equipment room and equipment room
survey.
4. The survey checklist contains mandatory survey items and referential survey items. The
mandatory survey items have a significant impact on the project delivery, so they must be
surveyed clearly. Referential survey items are limited by many conditions and only serve
as a reference. Use indicates whether the survey information is used for design or delivery.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
Tool Type Name
Pencil √
Rubber √
White paper √
Drawing tool Ruler √
Set square √
Laptop computer √
AutoCAD software √
GPS
Measuring tape (longer than 5 meters)

or laser rangefinder
Compass
Angle display
Measuring tool
Telescope
Digital camera √
500 V megohmmeter √
Clamp meter √
Multimeter √
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
The foundation is firm.
Site selection principle: There is low possibility of a fire.
During the process of
selecting a site for a data There is no possibility of flood due to heavy rain or other reasons.
center, to keep the servers There is broad view near the site.
and devices running
continuously and safely is The site is away from frequent lightning areas, substations, and power cables.
the most basic The site is away from polluted areas.
requirement.
An area with stable power supply and low price is selected.

Sufficient water supply, stable and reliable electric power, convenient transportation and communications
environment
Basic A considerable distance from areas which generate dust, oil fume, harmful gas, or corrosive objects, or s
Requirements
A considerable distance from flood-prone areas
A considerable distance from sources of strong vibration, loud noises, and strong electromagnetic interfe

Precautions for Site Selection Technical Requirements

Level A Level B Level C


Distance from parking lots ≥ 20 meters ≥ 20 meters No requirement

Distance from railways or


highways ≥ 800 meters ≥ 800 meters No requirement

Distance from airports, dangerous


labs, dangerous areas of chemical
≥ 400 meters ≥ 400 meters ≥ 400 meters
plants, landfills, river banks,
GB50174-2008 Design seacoasts, or dams
Code for Electronic
Computer Room

Distance
Requirements
GB50174-2008 Design IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
Code for Electronic
Computer Room
Distance from arsenals ≥ 1600 meters ≥ 1600 meters
Distance
Requirements Distance from dangerous areas of
nuclear power plants ≥ 1600 meters ≥ 1600 meters

The equipment
room should not
Flood-prone areas be deployed. The equipment room should not be deployed.

The equipment
Areas near earthquake faults or room should not
landslide-prone areas be deployed. The equipment room should not be deployed.
The equipment
room should be far
away from airport
Airport runways runways. The equipment room should be far away from airp
The equipment
room should not
Areas with high crime rate be deployed. The equipment room should not be deployed.

1. The data center should not be close to air routes of a nearby airport.

Basic 2. The distance from railways or highways should be 800 m at least to lower the risk of chemical substan
Requirements
3. The distance from military bases should be greater than 800 m, and the distance from nuclear facilities
should be greater than 1600 m.
Precautions for Site Selection T3 Standard T4 Stand

Requirements for data Not within once-in-a-hundred-year


center site selection flood areas, or at least 90 meters At least 90 meters away from
Distance from flood-prone areas
stated in the ANSI/TIA- away from once-in-fifty-year flood flood ar
942-2005 standard areas
Distance
Requirements
Requirements for data
center site selection
stated in the ANSI/TIA- IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
942-2005 standard
Distance Distance from seacoasts or inland
Requirements ≥ 90 meters ≥ 800 me
waterways

Distance from vital thoroughfares ≥ 90 meters ≥ 800 me

Distance from an airport 1.8–48 km away from the airport 1.8–48 km away fr
Distance from major cities ≤ 48 km ≤ 48 k
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

on and communications, and clean natural

or corrosive objects, or store corrosive objects

electromagnetic interference

Remarks

The equipment rooms used in these


areas are excluded.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

The equipment rooms used in arsenals


are excluded.
The equipment rooms used in nuclear
power plants are excluded.

ld not be deployed.

ld not be deployed.

ld be far away from airport runways.

ld not be deployed.

risk of chemical substances splashing.

ce from nuclear facilities and international facilities

T4 Standard

ast 90 meters away from once-in-a-hundred-year


flood areas
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

≥ 800 meters

≥ 800 meters

1.8–48 km away from the airport


≤ 48 km
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
Survey Output Use
No. Survey Sub-item Survey Content
Item (Data/Description/Drawing) (Design/Delivery)
Check whether this is an equipment room
Design and
1.1 Project type establishment, reconstruction, or relocation Description
delivery
project.
Check whether the project location information
1.2 Project location
Basic is described in detail.
information Check whether the customer is an operator, Design and
1.3 Customer type Description
the government, or an industrial user. delivery
Check whether this data center is for private
Design and
1.4 Service objective use, external services (hosting and host Description
delivery
leasing), or both purposes.
Photo of the whole Take photo of the whole equipment room for
2.1 Photo
equipment room design and archiving.
Take the following photos: air conditioner
outdoor units (on the rooftop or wall), chillers,
Photos of all
2.2 transformers (with nameplates), power Photo
subsystems
distribution room, equipment room, cooling
room, and device entry routes.
Photo Take the following photos: the power
distribution interface (access point), water
interface, (including the cold water access
point, if there is a chiller, access point for
Photos of access
2.3 humidifier water, and drainage position), fire Photo
points and ports
control interface, surge protection grounding
point, and the ports of the devices which need
to connect to the management system for
design reference.

Equipment room The altitude of the equipment room is


3.1 Data Design
altitude available.

The following data are available: average


number of power failures per day and per
Power supply of the
month, the average power failure duration, and
3.2 site and electric Description Design
electric charge for industrial electricity. (Usually
charge
the daytime and nighttime charges are
different.)
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Number of building
floors and the floor Record the number of building floors and the
3.3 Data Design
where the data floor where the data center is located.
center is located
Record the vertical distance between the
Equipment room spandrel girder on the ceiling board and the
3.4 Data Design
height floor, and the vertical distance between the
ceiling and the floor.
Measure the height between the completed
Equipment room net
3.5 floor and the lowest beam or suspended Data Design
height
ceiling.
Position, length, and
Measure the positions, lengths, and widths of
3.6 width of equipment Data and drawing Design
equipment room columns.
room columns
Usable area and
3.7 shape of the data Measure the usable area of the data center. Data and drawing Design
center
Bearing capacity of Measure the bearing capacity of the floor
the floor where the where the data center is located to determine
3.8 Building Data Design
data center is whether the floor is able to bear an equipment
condition located room.

Data center outdoor Mark the area for placing air conditioner
3.9 space and its outdoor units and the diesel generator (DG) on Data and drawing Design
bearing capacity the site survey plan.

Height and width of


the elevator door,
rated load of the
Measure the height and width of the elevator
elevator (if there is
door, the rated load of the elevator, and height
an elevator and it is
and width of aisles and doors which the
3.10 used to transport the Data Delivery
devices will pass through to check whether the
devices), height and
requirements for transporting the devices are
width of aisles and
met.
doors which the
devices will pass
through
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Measure the dimensions of doors and


windows, plan view size, floor elevation, and
original floor standards (as detailed as
possible), including the floor plan, three-
dimensional drawing, and water supply and
Equipment room drainage drawing under the current condition.
Design and
3.11 architectural Mark clearly the cable shaft, electricity room, Data and drawing
delivery
drawings power equipment room, cable entrance room.
Estimate and describe the remaining space of
the cable shaft and cable trays or troughs. Find
out whether the customer agrees to route
cables through the existing cable shaft and
cable trays or troughs.
Deployment of cable
trays for routing Check whether it is deployed under the raised
4.1 strong-current floor, on the cabinet, on the ceiling, or in other Description Design
cables in the data places.
center
Deployment of cable
Check whether it is deployed under the raised
trays for routing
4.2 floor, on the cabinet, on the ceiling, or in other Description Design
weak-current cables
places.
in the data center
Equipment
room interior Use of the room
condition under the equipment Record the use of the room under the Design and
4.3 room, and the room equipment room, and the room next to the Description
delivery
next to the equipment room.
equipment room
Position diagram of
existing devices in Position diagram of existing devices in the
Design and
4.4 the equipment room, equipment room, device category, and list are Drawing and description
delivery
device category, and available.
list
Record the local mains mode Design and
5.1 Voltage system Data
(three-phase/four-wire/voltage level). delivery

Design and
5.2 Frequency range Record the AC frequency (Hz). Data
delivery

Record the voltage (kV) of the transformer (if Design and


5.3 Transformer voltage Data
any). delivery
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Transformer Design and


5.4 Record the rated capacity (kVA) (if any). Photo and data
capacity delivery
Record the total power capacity which can be
5.5 Capacity available
provided for the data center (A).
Diesel generator Design and
5.6 Record the DG room dimensions (if any). Photo and data
room information delivery
Confirm the positions, cable routes, and
lengths of cable trenches and shafts between
the power introduction points
Design and
5.7 Cable route (transformer/DG/power distribution cabinet) Photo and drawing
delivery
and the equipment room. Make drawings for
purposes of design, delivery, and BOQ
Power quotation.
supply and Power distribution Record the power distribution room Design and
5.8 Photo and data
distribution room information dimensions (if any). delivery
Check whether the power is supplied by two
Design and
5.9 Power introduction substations, and whether there is a plan for Drawing
delivery
two power supplies.
Information about
the customer's Record the customer's PDC configuration and Design and
5.10 Photo and data
power distribution terminal type. delivery
cabinet (PDC)
Installing hydrogen
Check whether it is proper to install hydrogen Design and
5.11 exhaust windows for Description
exhaust windows for the battery room. delivery
the battery room
Check whether there is power for a lighting Design and
5.12 Lighting system Description
system. delivery
Fire extinguishing Design and
5.13 Check whether there is fire control power. Description
system delivery
Power system
Produce or ask the customer for the power
diagram between the
system diagram between the transformer and Design and
5.14 main transformer Description
the equipment room power introduction points delivery
and the equipment
for design reference.
room input
Check the positions and dimensions of the
foundation grounding or the ground bar on the Design and
6.1 Grounding position Description and photo
floor (if any). Check whether there is a delivery
dedicated position for the cable shaft.

Grounding
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Grounding Ground bar Design and


6.2 Record the ground bar resistance (ohm). Data
resistance (ohm) delivery

Existing grounding The existing grounding network diagram is Design and


6.3 Drawing (AutoCAD)
network diagram available (if any). delivery
Water inlet pipe The currently available water supply position is Design and
7.1 Photo and drawing
position clearly marked on the plan. delivery
The currently available drainage position is Design and
7.2 Drainpipe position Photo and drawing
Water clearly marked on the plan. delivery
supply
Record the water purity, pH value, and Design and
7.3 Water quality Data
conductivity at 20°C. delivery

Installation position Check whether there is a platform. If not, take


Design and
8.1 of the air conditioner photos of the outdoor ground of the first floor, Photo and drawing
delivery
outdoor unit rooftop, and external walls.

Installation height
Measure the height difference if the outdoor
difference between
unit is placed higher than the indoor unit. Design and
8.2 the air conditioner Data
Air Measure the height difference if the outdoor delivery
indoor and outdoor
conditioner units unit is placed lower than the indoor unit.
outdoor unit
(air cooled Local property
chiller) manager's or house Work with the customer to communicate with
owner's agreement the local property manager or house owner,
on the installation describe the installation position, purpose, and Design and
8.3 Description
position and cable parameters of outdoor units, and obtain the delivery
routes for the air local property manager or house owner's
conditioner outdoor approval.
units
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

If the equipment room is attended, the fresh air


Pipe routes for the system is recommended. If the equipment Design and
9.1 Description and drawing
fresh air system room is unattended, communicate with the delivery
Fresh air customer whether to deploy a fresh air system.
and
emergency
ventilation
system
Pipe routes for the
The emergency ventilation system is used to Design and
9.2 emergency Description and drawing
exhaust smoke and air during a fire. delivery
ventilation system

Geographic Obtain the geographic coordinates of the site


10.1 Data Design
coordinates through GPS or Google Earth.

Quakeproof level of Lowest quakeproof level of the equipment


10.2 the equipment room room building is required by the local Data Design
building authorities.
Communicate with the customer (owner) to
obtain information about the building
Building quakeproof
10.3 quakeproof level, whether the local area is Description Design
level
earthquake-prone, and whether it needs
quakeproof design.
Usable area of the Measure the usable area of the data center
10.4 Data and drawing Design
data center building building.
Referential
survey items
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密
Referential
survey items

Equipment room wall


10.5 Record the equipment room wall materials. Description Design
materials

Wall materials of the


Record the wall materials of the O&M center
10.6 O&M center (O&M Description Design
(O&M room).
room)

Corridor wall
10.7 Record the corridor wall materials. Description Design
materials
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Remarks

The information can be obtained from the tender


document or contract.

Details such as the street name and house number


should be provided.
The information can be obtained from the tender
document or contract.

The information can be obtained from the tender


document or contract.

The altitude directly affects the equipment performance


parameters. Especially in high-altitude regions, a
survey should be conducted carefully and related
information should be obtained.

If multiple sites are available, the customer should


choose the site with more reliable power supply and
lower electric charge.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

If two heights can be obtained at the same time,


provide two. If not, provide one.

The equipment room drawing must contain information


about the position, length, and width of all columns.

Design requirements: equipment room 8–12 kN/m2,


battery room 16 kN/m2. If the bearing capacity does
not meet the requirements, the floor needs to be
reinforced.
If there is no specific data, you can estimate the area.
In general contracting, the data needs to be
considered. When the micro module alone is delivered,
the data can be ignored.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

If the customer cannot provide the AutoCAD drawing,


the survey personnel needs to complete construction
drawings after measurement.

After the site survey, this item information should be


output for design reference.

After the site survey, this item information should be


output for design reference.

The construction noise, sound insulation, and special


design and construction requirements of special rooms
should be considered.

Specify the type and position of existing devices in the


equipment room, and make a detailed drawing.

Voltage range
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

Routes and lengths of all external cables (including


power distribution cables, lighting and socket cables,
and communications cables). Layout of cable trays and
cable pipes. Check whether drilling holes is required.

Estimate the cable quantity based on this item and


deliver after confirmation.

Estimate the cable quantity and terminal type based on


this item and deliver after confirmation.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

It is used to evaluate whether the building grounding


meets the grounding requirements of the equipment
room. If not, advise the customer to build another
building grounding system.

It is used to find the appropriate grounding point for the


equipment room.

The information can be obtained through


communication with the customer. The pH value
should be within the range of 7 to 8.5. The conductivity
at 20°C should be within the range of 300 µs/cm to
1250 µs/cm.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

The pipe routes refer to the routes that pipes will pass
through during construction, including items related to
the pipe design and construction, such as the
installation method, drilling holes or not, and passing
through the corridor or not.

The pipe routes refer to the routes that pipes will pass
through during construction, including items related to
the pipe design and construction, such as the
installation method, drilling holes or not, and passing
through the corridor or not.

After specifying the geographic coordinates of the site


in Google Earth, then you can view the surrounding
environment of the site. For example, you can see
whether there is a river or there are flood threats. Then
you can provide the customer with site selection
suggestions.

Reference can be provided for the deployment of


devices in the equipment room, such as batteries,
UPS, and precision air conditioners.
IDS2000 V500R002C00勘
测报告 OFFE00016342_PMD46ZH A 秘密

The asbestos containing sulfur is not allowed to use in


the equipment room. Differentiating method: The rock
wool and asbestos have different colors. Usually the
rock wool is yellow while the asbestos is white. They
can also be differentiated by touching. If you touch
them, the rock wool will not feel thorny while the
asbestos will. For thermal and sound insulation, rock
wool or mineral wool can be added as the interlayer.