You are on page 1of 3

Montilla Boulevard, Butuan City, Caraga, Philippines

Accredited: Association of Christian Schools, Colleges and Universities – ACSCU


Certified: ISO 9001:2015, TUV Rheinland Ref No. VPARE-RES-CRCF-001
Status: Initial
Date Issued: July 2023
COLLEGE RESEARCH CONCEPT FORM
COLLEGE ENGINEERING AND ARCHITECTURE

DEPARTMENT CIVIL ENGINEERING

TITLE OF PROPOSED COST ESTIMATE OF A STRUCTURE


STUDY
NAME OF STUDENT/S
PRINCESS BAQUIRAN
JOSEPH BALLESCAS
RENNE SALEXTO M. NABONG

RATIONALE Situation:
(State the situation that is Most of the projects that is being planned to be built ,costs way too much than
problematic situation, expected due to high quality standards.
Discuss the importance
and validity of your Importance and validity of the Project:
research/project), What are Optimize the budget cost without compromising the quality of the materials to be
the research gaps in the used in a project.
scientific literature on your
topic? Present initial data Research Gaps:
on the magnitude of the Presenting a method and formulation of to be applied optimizing construction
problem citing the project budgets cost.
source/s).

Report: Brutal inflation keeps construction pricey in Manila

Philstar.com
May 23, 2023

LEGAL BASIS RA NO 6957


(Legal basis, issuances as
basis of the proposed RA NO 7718
study).

EMPIRICAL Applications of optimization techniques in construction management


EVIDENCE/LITERATURE
SUPPORT THAT INDEED Gaurav Mishra
THE RESEARCH HAS
BASIS (cite at least 6 Contractor management techniques can be used to improve the efficiency of
documented evidence with construction projects by incorporating optimization methods to find feasible
support citation) solutions and minimize costs.

Component-level construction schedule optimization for hybrid con-


crete structures
Zhiliang Ma

This study proposes an approach to optimize the component-level


construction schedule for hybrid concrete structures, considering construction
sequence and resource constraints.

Construction of Approximation Formulas for Analytic Functions by


Mathematical Optimization
Kenichiro Tanaka, Masaaki Sugihara

The paper describes a method for constructing accurate formulas for function
approximation and numerical integration using mathematical optimization
techniques.

1
Optimization of construction time regulations for large-panel resi-
dential buildings
Ruslan Ibragimov

The study aims to optimize construction time regulations for large-panel


residential buildings by synchronizing construction flows.

Review of Optimization Dynamically Applied in the Construction and


the Application Potential of ICT
Boda Liu

This article reviews 72 optimization methods applied dynamically in


construction and discusses the potential of using real-time data collected by
ICT for optimization.

Developing a Resource Allocation Approach for Resource-Constrained


Construction Operation under Multi-Objective Operation
He Wei

The challenges in optimizing construction project scheduling and resource


allocation include conflicting objectives such as time, cost, and energy
consumption.

RESEARCH UTILIZATION/ Beneficiaries: Project owners


BENEFICIARIES

(Who and how can they


benefit from the results of
the study?) Include direct
and indirect beneficiaries)
.APPROACH/ DESIGN 1.Data collection with regards to the cost, brand, and specification of each
(How will the study be material.
conducted?) 2.Once Data is collected, Identify the allowable quality that can be considered. In
other words, it is identifying the constraints of each item. Identify the lower cost
estimates of a project and the usage of the formula to optimize the budget cost of
project.
3. Represent the items as variables then formulate the working equation.

RESULTS Expected Outputs: To be able to maximize the Budget cost and quality materials.
(What are the expected
outputs of the study?) Will
the study provide policy,
project, and program
recommendations?

2
ACTION TAKEN BY THE COLLEGE
Remarks Signature Date Signed
Research Faculty

Research Coordinator

Recommended Panel
Members

Dean’s Remarks

Note:

1. This form should be filled up before the Research Proposal.


2. The College shall maintain a copy for monitoring purposes.
3. The Office of the VPARE shall be furnished with a copy prior to the research proposal development.

Cc: Dean
VPARE

You might also like