Jumlah hari kerja 1 2 3 4 5 6

No Bulan/ TGL
Description
TRUCK MIXER WBP/TM/.../...

Perbaikan ringan
1 Unit truck mixer
2 General service
3 Tune up
4 Adjust brake
5 Adjust clutch
6 Repair electrical system
7 Pengelasan bracket

Perbaikan sedang
1 Repair torque rod
2 Repair brake
3 Repair propeler shaft T

4 OH Clutch
5 OH Differential
6 Rear axle @
7 Front axle @
8 Steering system

Perbaikan berat
1 OH Engine
2 OH Transmisi
3 OH Gear box mixer
4 OH Hydraulic pump
5 OH hydraulic motor

Keterangan warna:

Check sheet
Inspection
Dissasembly
Out work service
Cleaning
Asembly
Greasing
Performence test
Adjust
Waiting part
SCHEDULE PLAN
7 8 9 10 11 12 13 14 15 16 17 18
JUNI

Out work service


19 20 21 22 23 24 25 26 27 28 29 30

4 4 4 4 4