Bridge - 289
Girder weight (per span and total) 108 MT per span, Total: 648 MT
Permanent/temporary speed restriction,
No
if any
Expansion joints/Arrangements Provided as per Drg. No RDSO/B-1757 R
Wearing coat, type and thickness etc. M-30, 80 mm thickness
2. Foundation
2.1 General
Abutment Abutment
Description of item Pier-1 Pier-2 Pier-3 Pier-4 Pier-5
A-1 A-2
Foundation Type Open Open Open Pile Pile Pile Open
Bore log
2.0 Height (m) 10.75 12.413 13.542 16.842 14.084 13.901 13.901
# Particulars Value
1.0 Test Procedure
1.2 Pressure application 1 bar for 0 – 48 Hr, 3 bar for 48 – 72 Hr, 7 bar for 72 – 96 Hr
4.1 General
A1 P1
A1 -P1 L R L R
365.793 365.793 365.792 365.792
P1 P2
P1- P2 L R L R
365.792 365.792 365.794 365.794
P2 P3 Reduced level of
P2- P3 L R L R pedestal top is
within permissible
365.793 365.793 365.791 365.791
tolerance ± 5mm,
P3 P4 as per para 6.5 of
P3- P4 L R L R IRS Concrete
365.792 365.792 365.792 365.792 Bridge Code.
P4 P5
P4- P5 L R L R
365.792 365.792 365.794 365.794
P5 A2
P5- A2 L R L R
365.793 365.793 365.792 365.792
4.3 Field Observations
5.1 General
Note:
Jack Efficiency: 1st stage: 98.84%, 2nd stage: 99.22%
Ram Area: 1st stage: 1058.94 cm2, 2nd stage: 563.72 cm2
5.3 Camber
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
(after)
Launching 11 7 6 4 5.5 9.5 4 6 3 5.5 11 6
Deck slab
7.5 4 3 1.5 2 6 1.5 2.5 1 2 7.5 3
casting
2nd stage
13.5 12.5 11 9.5 11 14.5 9.5 11 8.5 10 16.5 11
stressing
Track laying 11.5 10 9 6.5 8 12.5 6.5 9 5 8 14.5 8
End A1 P1 P1 P2 P2 P3 P3 P4 P4 P5 P5 A2
Eccentricity
10 10 5 15 10 15 10 0 0 0 20 5
(mm)
Grade of Feb – Apr Jan – Feb Feb – Mar Mar – May May – Jul
Concrete 2022 2022 2021 2021 2020
M15 0.95 0.88 0.70 0.84 -
M20 - - 1.5 0.92 1.15
M25 - 3.01 1.88 - 1.52
M30 - - - 2.38 -
M35 3.05 3.54 3.38 3.13 3.16
M45 - - - - 4.35
# Particulars Value
1.2 Pressure application 1 bar for 0 – 48 Hr, 3 bar for 48 – 72 Hr, 7 bar for 72 – 96 Hr
LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS