Professional Documents
Culture Documents
P3 Redesign
P3 Redesign
+99.813
Ø2000 5248
VRCC
M25
+94.565
3600 X 3600 +94.065 500
7400 X 7400 1000
+93.065
+92.565
2000
1500
+91.065
P3
The required SBC as per the sanctioned GAD is 20 T/m2 at the level
of +RL 92.965. As per the site condition the SBC 26.65 T/m2 is
attained at the Level of +RL 90.965. Hence redesign is required