You are on page 1of 1

www.tpcentralodisha.

com
Bill of Supply of Electricity
Consumer Name : NARAHARI MAHARANA. Rebate Date : 29/06/2023
Due Date : 29/06/2023
Address Details : KEONSHAR COLONY CUTTACK -753001 Consumer A/C : 80032276430
Consumer ID : 05-I-061/095-122964
: 301S00613787
Bill Number : 1303329129
Bill Issue Date : 22/06/2023
Email Id :
Bill Basis : Normal
Mobile No : 9920278063 Last Bill Issue Date : 21/05/2023
Bill Month : 2023/06

Area Details Connection Details Supply and Meter Details


DIV : CDD-1,CUTTACK Tariff Category : Domestic Power Status : Active
Power Factor : 0.00
SUBDIV : SUB DIVISION 04 Power on Hour : 768
SECTION : CANTONMENT Contract Demand : 2.00 KW Billed Demand : 1.00KW
DT No. : Supply Voltage : 0.23 Meter Sl. No. : TVIS316182
Pole No. : Own Transformer : Col. Meter No :
MRU No. : CD011065 ED Exemption : NIL Bill Period : 22.05.2023 - 22.06.2023
Walking Sequence : Date of Connection : 24/01/2002 Bill Days/Months : 32/1.0559
Organization : Security Deposit : 920.00 Load Factor : 0.00
Connection Type : Metering : LV Meter Reading : OK
Meter Reading Details Due Date
Parameter Previous Current Reading M.F. Diff T.F Loss Total 29/06/2023
Reading ((Immediate for Arrears))
KWH 22,541.00 22,934.00 1.00 393.00 0.00 393.00 Total Amount Payable
MDI-KW 0.00 1.16 1.00 1.16 0.00 1.16 Rs. 2,024.00

Last Bill Amount Payment made Rebate Net Arrear Current bill DPS Adj/Inst Net Payable Amount(Rs.)
Amount Before Rbt. Dt. After Rbt. Dt.
1,653.00 1,620.00 -98.47 -64.67 2,088.98 0.00 0.00 1,985 2,024

Current Bill Details


a. Energy Charges 1,989.40 Adjustment Details for Information
1. Sundry Adjustment
Slab - 1- 50@3.00 150 Debit 0.00
Slab - 2- 150@4.80 720 Credit 0.00
Slab - 3- 193@5.80 1119.4
2. Interest on SD 0.00
b. Incentive on TOD 0.00
c. Demand Charge / MMFC 20.00 3. Others
d. Overdrawal penalty 0.00 Cross Subsidy Charges 0.00
e. Penalty for Fall in PF 0.00
f. Power Factor Incentive 0.00
g. Colony KWH charge 0.00 Disputed Amount 0.00
h. Load Factor Rebate 0.00
i. Special Rebate for Railway Traction 0.00
j. Mega Lift Rebate 0.00
k. Electricity Charge (a to j) 2,009.40 4a. Payment 1 22.05.20 1,620.00
l. Electricity Duty (4%) 79.58 4b. Payment 2 0.00
m. Green EC Premium 0.00 4c. Payment 3 0.00
n. Meter Rent 0.00 4d. Payment 4 0.00
o. Customer Service Charge 0.00 4. Total Payment 1,620.00
p. Tax Collection at Source 0.00
q. Current Total (k to p) 2,088.98 5. Last Rebate Allowed -33.70
Allowable Prompt Payment Rebate -39.30 6. Last digital rebate allowed -64.77
Net Current payment after Rebate 2,049.68
Message
The connection shall be liable for disconnection on non-payment of all dues including arrears of previous bill(s) by due date, after notice as per
Section 56(1) of the Electricity Act, 2003. Disputedamount is to be finalized on the outcome of the order of the respected court and the applicable
charges. ECS opt-in.Now consumer can pay using NEFT/RTGS, Account No - TPCODL (Followed by CA No withoutspace) e.g.
TPCODL8XXXXXXXXXX.
Division Office You Can Pay Using NEFT/RTGS Connect at Contact us
OFFICE OF THE EXECUTIVE Bank Name State Bank of India www.tpcentralodisha.com
ENGINEER (ELECTRICAL), Account No. TPCODL8XXXXXXXXXX 1912
RANIHAT 2, CUTTACK IFSC SBIN0004266
Branch Corporate Accounts Group Branch, Mobile 1800 345 7122
Address Neville House, JN Heredia Marg, App: 0674-2391110
Ballard Estate, Fort, Mumbai-1 Mail At -
customercare@tpcentralodisha.com

You might also like