You are on page 1of 2

ANTARA STEEL MILLS SDN. BHD.

(23848­W)

Purchase Quotation
QUOTATION REF : PQ­0041663/ELD/2019/4
SUPPLIER............: K­FIRST INTEGRATION SDN BHD (626441­H)(02198)
INQUIRY DATE ....: 3/9/19
CLOSING DATE...: 9/9/19

SEQ PR STOCK CODE UNIT QUANTITY UNIT PRICE

1. RA­0434697 02­0424­0070 PC 4.00


FILTER­ELEMENT AIR 2ND OUTLET / IA DRYER
HYPERSORE OIL VAPOR ADSORBER
PART NUMBER: 0715­12
THE ABOVE ITEM IS USED AT FOLLOWING
EQUIPMENT
MANUFACTURER: HANKISON
MODEL: H500­24M­8L
SERIAL NUMBER: 1517­5­9006­3
RATED CAPACITY: 500 SCFM @ 100 PSIG
MAX PRESSURE DIFFERENCE: 30 PSI
MAX WORKING PRESSURE: 225 PSIG
MAX OPERATING TEMPERATURE: 120 F
2. RA­0434699 02­0424­0096 PC 2.00
FILTER­ELEMENT AIR 1ST OUTLET / IA DRYER
AIR LINE FILTER REPLACEMENT ELEMENT
PART NUMBER: 0731­8
THE ABOVE ITEM IS USED AT FOLLOWING
EQUIPMENT
MANUFACTURER: HANKISON
MODEL : T400­16M­5L­A
SERIAL NUMBER : 3106­9A­9006­3
RATED CAPACITY: 400 SCFM@100 PSIG
MAX PRESSURE DIFFERENCE: 30 PSI
MAX WORKING PRESSURE : 300 PSIG
MAX OPERATING TEMPERATURE: 120 F
3. RA­0434700 02­0424­0112 PC 3.00
FILTER­INLET SEPARATOR / IA DRYER
CENTRIFLEX SEPARATOR/FILTER
TO BUY PART NUMBER :07.4447­01(WHOLE SET)
(REPLACED BY : E­9­PV)
DO NOT BUY PART NUMBER :0734­7(SLEEVE ONLY)
MFG: HANKISON

CURRENCY :
QUOTE VALIDITY :
PAYMENT TERMS :
DELIVERY PERIOD :
DELIVERY TERMS :
MODE OF DELIVERY :
ESTIMATED WEIGHT :
PACKING DIMENSION :
STOCK AVAILABILITY :
ANTARA'S CONTACT INFORMATION :

PRINT DATE AND TIME: 3/9/2019 03:46:22 pm PAGE: 1 of 2


ANTARA STEEL MILLS SDN. BHD. (23848­W)

Terms and conditions

1. Antara Steel Mills Sdn Bhd (ANTARA STEEL) is inviting you to quote for the above
inquiry.
2. Your quotation is to be clearly marked with the above Quotation Ref. No. Please
address your quotation to the above address and Purchasing Section by return
facsimile or e­mail, clearly and always quoting the Quotation Ref. No.
3. Please ENSURE your quotation complies with our intended inquiry by giving the
correct descriptions and specifications of the items, price, unit of quantity,
payment terms, delivery period, delivery terms and any other relevant terms.
ANTARA STEEL shall not entertain any request by the bidder for revision of price(s)
due to the bidder’s omissions or errors of pricing after the order has been
officially awarded to the bidder.
4. ANTARA STEEL reserves the right to accept or reject any proposal and to award to
any supplier of ANTARA STEEL’s choice without assigning any reason thereof. Only
successful bidder will be notified.
5. ANTARA STEEL prefers payment terms of Open Account – Credit Basis with any supplier
and payable after delivery of items and submission of invoice supported by the
necessary documents to ANTARA STEEL. Other terms and condition is negotiable. The
INCOTERMS 2010 edition shall apply.
6. Labuan is a Duty Free Port in Malaysia and declared as a Designated Area (DA) by
Malaysian Royal Customs and Excise. Your quotation shall not include duty. Under
GST Act 2014 Labuan FT enjoys special GST treatment, Supplier/contractor need to
declare in their quotation if and should the GST is applicable.
7. All wood packaging material (WPM) used in any consignment imported into Labuan,
Malaysia must be treated/fumigated with Methyl Bromide gas (CH3Br) and "marked"
accordingly accompanied with Certificate under International Standard for
Phytosanitary Measures (ISPM) No.15(FAQ2009).
8. Supplier/contractor must declare that the parts or products to be supplied are
genuine, and the brand name as well as country of origin shall be indicated by
supplier/contractor. In the event that the parts are found to be counterfeit,
adulterated or under imitation, ANTARA STEEL has the right to reject them partially
or as wholly and shall seek reasonable compensation from supplier/contractor.
Subsequent business transaction may be suspended and if the practices have been
ongoing for sometimes, ANTARA STEEL shall have the sole decision of terminating the
registration of the supplier/contractor.
9. This message is only an inquiry and shall not be construed as a form of order;
hence there shall be no obligation by ANTARA STEEL.

PRINT DATE AND TIME: 3/9/2019 03:46:22 pm PAGE: 2 of 2

You might also like