CENG417 Project - Report
CENG417 Project - Report
College of Engineering
Department of Civil Engineering
Section Number: 1
All the members are rolled section, and the beams are universal
beams and columns are universal columns, the connections are simple
bolted connections for beam-column joints. All the bracings are double
angles connected back to back where the gusset plates are in between
the angles.
All the steel design requirements will be shown below in the report.
1.1 Objective
➢ Level 1
𝑆𝑒𝑙𝑓 𝑤𝑒𝑖𝑔ℎ𝑡 = [1 𝑘𝑁/𝑚2 ] × 1.4 = 1.4 𝑘𝑁/𝑚2
𝐿𝑖𝑣𝑒 𝑙𝑜𝑎𝑑 = [5000 𝑘𝑔⁄𝑚2 × 9.81 𝑚⁄𝑠 2 ] × 1.6
= 78480 𝑁/𝑚2 = 78.48 𝑘𝑁/𝑚2
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 1.4 + 78.48 = 79.88 𝑘𝑁/𝑚2
➢ Level 2
𝑆𝑒𝑙𝑓 𝑤𝑒𝑖𝑔ℎ𝑡 = [23.6 𝑘𝑁/𝑚3 × 0.18 𝑚 + 0.3 𝑘𝑁/𝑚2 ] × 1.4
= 6.367 𝑘𝑁/𝑚2
𝐿𝑖𝑣𝑒 𝑙𝑜𝑎𝑑 = [5000 𝑘𝑔⁄𝑚2 × 9.81 𝑚⁄𝑠 2 ] × 1.6 = 78480 𝑁/𝑚2
= 78.48 𝑘𝑁/𝑚2
𝐿𝑖𝑣𝑒 𝑙𝑜𝑎𝑑 = [6.5 𝑘𝑁⁄𝑚2 ] × 1.6 = 10.4 𝑘𝑁/𝑚2
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 6.367 + 78.48 + 10.4 = 95.247 𝑘𝑁/𝑚2
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 5 of 60
Description: Loads of Beams and Date: Date: Date:
Girders 4/5/2023 4/5/2023 4/5/2023
Ref.
3.2 Loads of Beams and Girders
➢ Level 1
𝑆𝑒𝑙𝑓 𝑤𝑒𝑖𝑔ℎ𝑡 (𝐴𝑙𝑙 𝐵𝑒𝑎𝑚𝑠) = [0.05 × 79.88𝑘𝑁/𝑚2 ] × 1.4
= 5.59 𝑘𝑁/𝑚
o Beam 2
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 79.88 𝑘𝑁/𝑚2 × 2 𝑚 = 159.76 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 159.76 + 5.59 = 165.35 𝑘𝑁/𝑚
o Girder 1
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 165.35 𝑘𝑁/𝑚 × 3.5 𝑚 = 578.73 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 5.59 𝑘𝑁/𝑚
o Girder 2
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 165.35 𝑘𝑁/𝑚 × 7 𝑚 = 1157.45 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 5.59 𝑘𝑁/𝑚
o Beam 1
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 79.88 𝑘𝑁/𝑚2 × 1 𝑚 = 79.88 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 79.88 + 5.59 = 85.47 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 6 of 60
Description: Loads of Beams and Date: Date: Date:
Girders 4/5/2023 4/5/2023 4/5/2023
Ref.
➢ Level 2
𝑆𝑒𝑙𝑓 𝑤𝑒𝑖𝑔ℎ𝑡 (𝐴𝑙𝑙 𝐵𝑒𝑎𝑚𝑠) = [0.05 × 95.247𝑘𝑁/𝑚2 ] × 1.4
= 6.67 𝑘𝑁/𝑚
o Beam 4
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 2 𝑚 = 190.49 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 190.49 + 6.67 = 197.16 𝑘𝑁/𝑚
o Girder 3
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 1.75 𝑚 = 345.03 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 1.75 𝑚 = 166.68 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 166.68 + 6.67 = 173.35 𝑘𝑁/𝑚
o Girder 4
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 3.5 𝑚 = 690.06 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 3.5 𝑚 = 333.36 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 333.36 + 6.67 = 340.03 𝑘𝑁/𝑚
o Beam 3
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 × 1 = 197.16 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 1 𝑚 = 95.247 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 95.247 + 6.67 = 101.92 𝑘𝑁/𝑚
o Beam 5
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 2 𝑚 = 394.32 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 2 𝑚 = 190.49 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 190.49 + 6.67 = 197.16 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 7 of 60
Date: Date: Date:
Description: Loads of Columns
4/5/2023 4/5/2023 4/5/2023
Ref.
3.3 Loads of Columns
➢ Level 1
Column 1 (A1,A4,C1,C5)
Total Self Weight = 79.88 kN/m2
Total Slab Load = 79.88 × [3 × 3.5 × 1]= 838.74 kN
Beam Load = 5.59 × [7/2 × 2] = 39.13 kN
Girder Load = 5.59 × [(2+2/2)] = 16.77 kN
Column Self-Weight = 5.59 kN
Total Column Load = 900.23 kN
Column 2 (B1)
Total Self Weight = 79.88 kN/m2
Total Slab Load = 79.88 × [3 × 7 × 1]= 1677.48 kN
Beam Load = 5.59 × [7× 2] = 78.26 kN
Girder Load = 5.59 × [(2+2/2)] = 16.77 kN
Column Self-Weight = 5.59 kN
Total Column Load = 1778.1 kN
Column 3 (A2,A3,C2,C3,C4)
Total Self Weight = 79.88 kN/m2
Total Slab Load = 79.88 × [6 × 3.5 × 1]= 1677.48 kN
Beam Load = 5.59 × [7/2 × 3] = 58.695 kN
Girder Load = 5.59 × [(2+2+2/2+2/2)] = 33.54 kN
Column Self-Weight = 5.59 kN
Total Column Load = 1775.305 kN
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 8 of 60
Date: Date: Date:
Description: Loads of Column
4/5/2023 4/5/2023 4/5/2023
Ref.
Column 4 (B2,B3)
Total Self Weight = 79.88 kN/m2
Total Slab Load = 79.88 × [6 × 7 × 1]= 3359.96 kN
Beam Load = 5.59 × [7/2 × 3 + 7/2 × 3 ] = 117.39 kN
Girder Load = 5.59 × [(2+2+2/2+2/2)] = 33.54 kN
Column Self-Weight = 5.59 kN
Total Column Load = 3511.48 kN
Column 5 (B4)
Total Self Weight = 79.88 kN/m2
Total Slab Load = 79.88 × [6 × 3.5] + [3 × 3.5] = 1687.98 kN
Beam Load = 5.59 × [7 × 2 + 3.5] = 97.825 kN
Girder Load = 5.59 × [(2+2+2/2+2/2)] = 33.54 kN
Column Self-Weight = 5.59 kN
Total Column Load = 1824.935 kN
➢ Level 2
Column 1 (A1,A3,C1,C3)
Total Self Weight = 95.247 kN/m2
Total Slab Load = 95.247 × [3 × 3.5 × 1] = 1000.1 kN
Beam Load = 6.67 × [3.5 × 2] = 46.69 kN
Girder Load = 6.67 × [(2+1)/2)] = 13.34 kN
Column Self-Weight = 6.67 kN
Total Column Load = 1066.8 kN
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 9 of 60
Date: Date: Date:
Description: Loads of Columns
4/5/2023 4/5/2023 4/5/2023
Ref.
Column 2 (B2)
Total Self Weight = 95.247 kN/m2
Total Slab Load = 95.247 × [6 × 7 × 1] = 4000.374 kN
Beam Load = 6.67 × [3.5 × 6] = 140.07 kN
Girder Load = 6.67 × [(6+6/2+6/2)] = 80.04 kN
Column Self-Weight = 6.67 kN
Total Column Load = 4227.154 kN
Column 3 (A2,B1,B3,C2)
Total Self Weight = 95.247 kN/m2
Total Slab Load = 95.247 × [3 × 7 × 1] = 2000.187 kN
Beam Load = 6.67 × [7 × 2] = 93.38 kN
Girder Load = 6.67 × [(3+3/2+3/2)] = 40.02 kN
Column Self-Weight = 6.67 kN
Total Column Load = 2140.257 kN
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 10 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
4.0 Shear and Moment Diagrams
Note: All shear and moment diagrams were plotted using
https://structural-analyser.com/
Girder 1
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 165.35 𝑘𝑁/𝑚 × 3.5 𝑚 = 578.73 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 5.59 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 11 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Beam 1
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 79.88 𝑘𝑁/𝑚2 × 1 𝑚 = 79.88 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 79.88 + 5.59 = 85.47 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 12 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Girder 2
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 165.35 𝑘𝑁/𝑚 × 7 𝑚 = 1157.45 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 5.59 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 13 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Beam 2
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 79.88 𝑘𝑁/𝑚2 × 2 𝑚 = 159.76 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 159.76 + 5.59 = 165.35 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 14 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Beam 3
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 × 1 = 197.16 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 1 𝑚 = 95.247 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 95.247 + 6.67 = 101.92 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 15 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Girder 3
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 1.75 𝑚 = 345.03 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 1.75 𝑚 = 166.68 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 166.68 + 6.67 = 173.35 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 16 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Girder 4
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 3.5 𝑚 = 690.06 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 3.5 𝑚 = 333.36 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 333.36 + 6.67 = 340.03 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 17 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Beam 4
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 2 𝑚 = 190.49 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑙𝑜𝑎𝑑 = 190.49 + 6.67 = 197.16 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 18 of 60
Description: Shear and Moment Date: Date: Date:
Diagrams 5/5/2023 5/5/2023 5/5/2023
Ref.
Beam 5
𝑃𝑜𝑖𝑛𝑡 𝑙𝑜𝑎𝑑 = 197.16 𝑘𝑁/𝑚 × 2 𝑚 = 394.32 𝑘𝑁
𝐹𝑙𝑜𝑜𝑟 𝑙𝑜𝑎𝑑 = 95.247 𝑘𝑁/𝑚2 × 2 𝑚 = 190.49 𝑘𝑁/𝑚
𝑇𝑜𝑡𝑎𝑙 𝑑𝑖𝑠𝑡𝑟𝑖𝑏𝑢𝑡𝑖𝑜𝑛 𝑙𝑜𝑎𝑑 = 190.49 + 6.67 = 197.16 𝑘𝑁/𝑚
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 19 of 60
Description: Groups of Beams Date: Date: Date:
and Girders 5/5/2023 5/5/2023 5/5/2023
Ref.
5.0 Groups of the Structures
5.1 Groups of Beams and Girders
Level 1
Beam Length (m) Shear (kN) Moment (kN.m)
Girder 1 6 595.5 1182.61
Beam 1 7 299.15 523.5
Girder 2 6 1174.22 2340.05
Beam 2 7 496.0 744.08
Level 2
Beam Length (m) Shear (kN) Moment (kN.m)
Beam 3 7 353.38 790.93
Girder 3 6 605.05 1094.54
Girder 4 6 1200.11 b to c 2173.52
Beam 4 7 591.48 1174.75
Beam 5 7 690.06 1552.64
Group 1
Length (m) 6
Columns A4,B4,C4,B5,C5
F (kN) 1824.935
Group 2
Length (m) 12
Columns A1,C1,A2,C2,A3,C3,B1
F (kN) 3918.357
Group 3
Length (m) 12
Columns B2,B3
F (kN) 7738.634
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 21 of 60
Date: Date: Date:
Description: Design of Beams
13/5/2023 13/5/2023 13/5/2023
Ref.
6.0 Design of Beams
Group 1 (F=690.06 kN, M=1552.64 kN.m)
Try 838×292×176
From Table of Properties:
D=834.9 mm, T=18.8 mm, t=14 mm, b/T=7.76, d/t=54.4,
Sx=6810×103 mm3, Zx=5890×103 mm3, u=0.856, x=46.5
ry=59mm, rx=331mm, Ix=246000×104 mm4
𝑇 = 18.8 > 16 → 𝑃𝑦 = 265 𝑀𝑃𝑎
✓ Section Classification
Table11
275 275
𝜀=√ =√ = 1.019
𝑃𝑦 265
𝐹𝑙𝑎𝑛𝑔𝑒: 𝑏/𝑇 = 7.76 < 9𝜀
𝑊𝑒𝑏: 𝑑/𝑡 = 54.4 < 80𝜀
∴ 𝐵𝑒𝑎𝑚 𝑖𝑠 𝑐𝑙𝑎𝑠𝑠 1 (𝑃𝑙𝑎𝑠𝑡𝑖𝑐), 𝑙𝑜𝑐𝑎𝑙 𝑏𝑢𝑐𝑘𝑙𝑖𝑛𝑔 𝑤𝑖𝑙𝑙 𝑛𝑜𝑡 𝑏𝑒 𝑎 𝑝𝑟𝑜𝑏𝑙𝑒𝑚
✓ Check for Shear
𝑑/𝑡 = 54.4 < 70𝜀 → 𝑁𝑜 𝑆ℎ𝑒𝑎𝑟 𝐵𝑢𝑐𝑘𝑙𝑖𝑛𝑔
4.4.5
𝐴𝑣 = 𝐷𝑡 = 834.9 × 14 = 11688.6 𝑚𝑚2
4.2.3
𝑃𝑣 = 0.6𝑃𝑦𝐴𝑣 = 0.6 × 265 × 11688.6 = 1858.49 𝑘𝑁
𝑃𝑣 > 𝐹 → 𝑆ℎ𝑒𝑎𝑟 𝑖𝑠 𝑜𝑘
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 22 of 60
Date: Date: Date:
Description: Design of Beams
13/5/2023 13/5/2023 13/5/2023
Ref.
✓ Check for Moment
4.2.5.2 0.6𝑃𝑣 = 0.6 × 1148.98 = 1115.09 > 𝐹 → 𝐿𝑜𝑤 𝑆ℎ𝑒𝑎𝑟
𝑀𝑐 = 𝑃𝑦𝑆𝑥 = 265 × 6810 × 103 = 1804.65 𝑘𝑁. 𝑚
𝑀𝑐 > 𝑀 → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑖𝑛 𝑏𝑒𝑛𝑑𝑖𝑛𝑔 𝑎𝑛𝑑 𝑒𝑐𝑜𝑛𝑜𝑚𝑖𝑐
4.3.6.4
𝐹𝑜𝑟 𝑐𝑙𝑎𝑠𝑠 1: 𝑀𝑏 = 𝑃𝑏 × 𝑆𝑥 = 232 × 6810 × 103
= 1579.92 𝑘𝑁. 𝑚
W 𝐿3
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 (𝑃𝑜𝑖𝑛𝑡 𝐿𝑜𝑎𝑑) =
48 × 𝐸 × 𝐼
246.4375 × 103 × (7000)3
= = 3.492𝑚𝑚
48 × (205 × 103 ) × (246000 × 104 )
𝐿 7000
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑖𝑚𝑖𝑡 𝛿 = = = 35 𝑚𝑚
200 200
Try 610×305×149
From Table of Properties:
D=612.4 mm, T=19.7 mm, t=11.8 mm, b/T=7.74, d/t=45.8,
Sx=4590×103 mm3, Zx=4110×103 mm3, u=0.886, x=32.7
ry=70mm, rx=257mm, Ix=126000×104 mm4
𝑇 = 19.7 > 16 → 𝑃𝑦 = 265 𝑀𝑃𝑎
✓ Section Classification
Table11
275 275
𝜀=√ =√ = 1.019
𝑃𝑦 265
𝐹𝑙𝑎𝑛𝑔𝑒: 𝑏/𝑇 = 7.74 < 9𝜀
𝑊𝑒𝑏: 𝑑/𝑡 = 45.8 < 80𝜀
∴ 𝐵𝑒𝑎𝑚 𝑖𝑠 𝑐𝑙𝑎𝑠𝑠 1 (𝑃𝑙𝑎𝑠𝑡𝑖𝑐), 𝑙𝑜𝑐𝑎𝑙 𝑏𝑢𝑐𝑘𝑙𝑖𝑛𝑔 𝑤𝑖𝑙𝑙 𝑛𝑜𝑡 𝑏𝑒 𝑎 𝑝𝑟𝑜𝑏𝑙𝑒𝑚
✓ Check for Shear
4.4.5
𝑑/𝑡 = 45.8 < 70𝜀 → 𝑁𝑜 𝑆ℎ𝑒𝑎𝑟 𝐵𝑢𝑐𝑘𝑙𝑖𝑛𝑔
4.2.3
𝐴𝑣 = 𝐷𝑡 = 612.4 × 11.8 = 7226.32 𝑚𝑚2
𝑃𝑣 = 0.6𝑃𝑦𝐴𝑣 = 0.6 × 265 × 7226.32 = 1148.98 𝑘𝑁
𝑃𝑣 > 𝐹 → 𝑆ℎ𝑒𝑎𝑟 𝑖𝑠 𝑜𝑘
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 26 of 60
Date: Date: Date:
Description: Design of Beams
13/5/2023 13/5/2023 13/5/2023
Ref.
✓ Check for Moment
4.2.5.2 0.6𝑃𝑣 = 0.6 × 1148.98 = 689.39 > 𝐹 → 𝐿𝑜𝑤 𝑆ℎ𝑒𝑎𝑟
𝑀𝑐 = 𝑃𝑦𝑆𝑥 = 265 × 4590 × 103 = 1216.35 𝑘𝑁. 𝑚
𝑀𝑐 > 𝑀 → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑖𝑛 𝑏𝑒𝑛𝑑𝑖𝑛𝑔 𝑎𝑛𝑑 𝑒𝑐𝑜𝑛𝑜𝑚𝑖𝑐
4.3.6.4
𝐹𝑜𝑟 𝑐𝑙𝑎𝑠𝑠 1: 𝑀𝑏 = 𝑃𝑏 × 𝑆𝑥 = 265 × 4590 × 103
= 1216.35 𝑘𝑁. 𝑚
M1 M2 M3 M4 M5
22
𝑀5 = 595.5 × 2 − 5.6 × = 1179.8 𝑘𝑁. 𝑚
2
𝑚𝐿𝑇 = 0.9998
𝑀𝑏 1216.35
= = 1216.59
𝑚𝐿𝑇 0.9998
𝑀𝑥 = 1182.61
4.3.6.2 𝑀𝑏
𝑀𝑥 <
𝑚𝐿𝑇
W×a
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 (𝑃𝑜𝑖𝑛𝑡 𝐿𝑜𝑎𝑑𝑠) = (3𝐿2 − 4𝑎 2 )
24 × 𝐸 × 𝐼
361.6875 × 103 × 3000
= 3 4
(3 × 60002 − 4 × 30002 )
24 × (205 × 10 ) × (126000 × 10 )
= 12.602𝑚𝑚
𝐿 6000
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑖𝑚𝑖𝑡 𝛿 = = = 30 𝑚𝑚
200 200
Try 838×292×226
From Table of Properties:
D=850.9 mm, T=26.8 mm, t=16.1 mm, b/T=5.48, d/t=47.3,
Sx=9160×103 mm3, Zx=7990×103 mm3, u=0.869, x=35
ry=62.7mm, rx=343mm, Ix=340000×104 mm4
𝑇 = 26.8 > 16 → 𝑃𝑦 = 265 𝑀𝑃𝑎
✓ Section Classification
Table11
275 275
𝜀=√ =√ = 1.019
𝑃𝑦 265
𝐹𝑙𝑎𝑛𝑔𝑒: 𝑏/𝑇 = 5.48 < 9𝜀
𝑊𝑒𝑏: 𝑑/𝑡 = 47.3 < 80𝜀
∴ 𝐵𝑒𝑎𝑚 𝑖𝑠 𝑐𝑙𝑎𝑠𝑠 1 (𝑃𝑙𝑎𝑠𝑡𝑖𝑐), 𝑙𝑜𝑐𝑎𝑙 𝑏𝑢𝑐𝑘𝑙𝑖𝑛𝑔 𝑤𝑖𝑙𝑙 𝑛𝑜𝑡 𝑏𝑒 𝑎 𝑝𝑟𝑜𝑏𝑙𝑒𝑚
✓ Check for Shear
4.4.5
𝑑/𝑡 = 47.3 < 70𝜀 → 𝑁𝑜 𝑆ℎ𝑒𝑎𝑟 𝐵𝑢𝑐𝑘𝑙𝑖𝑛𝑔
4.2.3 𝐴𝑣 = 𝐷𝑡 = 850.9 × 16.1 = 13699.49 𝑚𝑚2
𝑃𝑣 = 0.6𝑃𝑦𝐴𝑣 = 0.6 × 265 × 13699.49 = 2178.22 𝑘𝑁
𝑃𝑣 > 𝐹 → 𝑆ℎ𝑒𝑎𝑟 𝑖𝑠 𝑜𝑘
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 30 of 60
Date: Date: Date:
Description: Design of Beams
13/5/2023 13/5/2023 13/5/2023
Ref. ✓ Check for Moment
0.6𝑃𝑣 = 0.6 × 2178.22 = 1306.93 < 𝐹 → 𝐻𝑖𝑔ℎ 𝑆ℎ𝑒𝑎𝑟
4.2.5.3 𝑀𝑐 = 𝑃𝑦(𝑆𝑥 − 𝜌𝑆𝑣)
2 2
𝐹𝑣 1200.11
𝜌 = [2 ( ) − 1] = [2 ( ) − 1] = 0.01
𝑃𝑣 2178.22
𝑡 16.1
𝑆𝑣 = 𝐷 2 × = 850.92 × = 2914224.01 𝑚𝑚3
4 4
3
4.3.6.1 𝑀𝑐 = 265(9160 × 10 − 0.01 × 2914224.01) = 2419.7 𝑘𝑁. 𝑚
𝑀𝑐 > 𝑀 → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑖𝑛 𝑏𝑒𝑛𝑑𝑖𝑛𝑔 𝑎𝑛𝑑 𝑒𝑐𝑜𝑛𝑜𝑚𝑖𝑐
✓ Lateral Torsional Buckling
Provide Intermediate Lateral Supports
𝐿𝐸 = 2 𝑚 = 2000 𝑚𝑚
𝐿𝐸 2000
𝜆= = = 31.898
𝑟𝑦 62.7
𝜆 31.898
= = 0.91137
Table19
𝑥 35
4.3.6.9 𝑣 = 0.99
𝐹𝑜𝑟 𝑐𝑙𝑎𝑠𝑠 1 𝑎𝑛𝑑 2 𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑠, 𝛽𝑤 = 1
4.3.6.7
𝜆𝐿𝑇 = 𝑢𝑣𝜆𝛽1/2 𝑤 = 0.869 × 0.99 × 31.898 × 11/2 = 27.44
Table16
𝑃𝑏 = 265 𝑀𝑃𝑎
4.3.6.4
𝐹𝑜𝑟 𝑐𝑙𝑎𝑠𝑠 1: 𝑀𝑏 = 𝑃𝑏 × 𝑆𝑥 = 265 × 9160 × 103
= 2427.4 𝑘𝑁. 𝑚
𝑚𝐿𝑇 = 0.9999
𝑀𝑏
𝑀𝑥 <
𝑚𝐿𝑇
𝑀𝑏 2427.4
= = 2427.63
4.3.6.2
𝑚𝐿𝑇 0.9999
𝑀𝑥 = 𝟐𝟑𝟒𝟎. 𝟎𝟓
∴ 𝑜𝑘, 𝑡ℎ𝑒 𝑠𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑎𝑑𝑒𝑞𝑢𝑎𝑡𝑒 𝑓𝑜𝑟 𝑙𝑎𝑡𝑒𝑟𝑎𝑙 𝑡𝑜𝑟𝑠𝑖𝑜𝑛𝑎𝑙 𝑏𝑢𝑐𝑘𝑙𝑖𝑛𝑔.
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 32 of 60
Date: Date: Date:
Description: Design of Beams
13/5/2023 13/5/2023 13/5/2023
Ref.
✓ Deflection Check
5 × 𝑤 × 𝐿4
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 (𝑈𝐷𝐿) =
384 × 𝐸 × 𝐼
5 × 3.5 × (6000)4
= = 0.085 𝑚𝑚
384 × (205 × 103 ) × (340000 × 104 )
W×a
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 (𝑃𝑜𝑖𝑛𝑡 𝐿𝑜𝑎𝑑𝑠) = (3𝐿2 − 4𝑎 2 )
24 × 𝐸 × 𝐼
723.4375 × 103 × 3000
= 3 4
(3 × 60002 − 4 × 30002 )
24 × (205 × 10 ) × (126000 × 10 )
= 25.207𝑚𝑚
𝐿 6000
𝐷𝑒𝑓𝑙𝑒𝑐𝑡𝑖𝑜𝑛 𝐿𝑖𝑚𝑖𝑡 𝛿 = = = 30 𝑚𝑚
200 200
✓ Section Classification
275 275
Table11 𝜀=√ =√ = 1.019
𝑃𝑦 265
Table24
𝐿𝐸𝑦 6000
𝜆𝑦 = = = 91.047
𝑟𝑦 65.9
𝑇𝑎𝑏𝑙𝑒 23 → 𝑇𝑎𝑏𝑙𝑒 24 (𝑐) → 𝑝𝑐 = 137.57 𝑀𝑃𝑎
𝑃𝑐 = 𝐴𝑔 × 𝑝𝑐 = 13600 × 137.57 = 1870.952 𝑘𝑁
4.7.4
𝑃𝑐 > (𝐹 = 1824.935 𝑘𝑁) → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑆𝑎𝑓𝑒
𝑃𝑐 < (1.2𝐹 = 2189.92 𝑘𝑁) → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝐸𝑐𝑜𝑛𝑜𝑚𝑖𝑐
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 35 of 60
Date: Date: Date:
Description: Design of Columns
14/5/2023 14/5/2023 14/5/2023
Ref.
Group 2 (F = 3918.357 kN)
Try 368×368×177
Ag= 22600 mm2, T= 23.8 mm, t= 14.4 mm, b/T= 7.83, d/t= 20.2,
rx= 159 mm, ry= 95.4 mm, Steel grade= 275, LE= 6000 mm,
Pyflange= 265 MPa, Pyweb= 275 MPa, Py=265 MPa
✓ Section Classification
275 275
𝜀=√ =√ = 1.019
𝑃𝑦 265
Table11
✓ Section Classification
275 275
𝜀=√ =√ = 1.038
𝑃𝑦 255
Table11
275 275
Table11 𝜀=√ =√ =1
𝑝𝑦 275
4.7.4
𝑃𝑐 = 𝐴𝑔 × 𝑝𝑐 = 6780 × 31.70 = 214.926 𝑘𝑁
𝑃𝑐 > (𝐹 = 189.39 𝑘𝑁) → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑆𝑎𝑓𝑒
𝑃𝑐 < (1.2𝐹 = 227.27 𝑘𝑁) → 𝑆𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝐸𝑐𝑜𝑛𝑜𝑚𝑖𝑐
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 47 of 60
Description: Design of Critical Date: Date: Date:
Tension Bracing 15/5/2023 15/5/2023 15/5/2023
Ref.
9.3 Design of Critical Tension Bracing
𝐹 = 172.61 𝑘𝑁, 𝑇𝑟𝑦 150 × 90 × 15 (𝐷𝑜𝑢𝑏𝑙𝑒 𝐴𝑛𝑔𝑙𝑒𝑠)
𝐴𝑠𝑠𝑢𝑚𝑒 2 𝑏𝑜𝑙𝑡𝑠, 22 𝑚𝑚, 1 𝑏𝑜𝑙𝑡 𝑖𝑛 𝑒𝑎𝑐ℎ 𝑙𝑖𝑛𝑒
𝐴𝑔 = 6780 𝑚𝑚2 , 𝑡 = 15 𝑚𝑚 𝑑 = 22 𝑚𝑚 , 𝐷𝑡 = 24 𝑚𝑚 ,
𝑆275 , 𝑝𝑦 = 275 𝑁 ∕ 𝑚𝑚2 , 𝑘𝑒 = 1.2
4.6.3 𝐴𝑔 = 𝑎1 + 𝑎2
𝑎1 = 150 × 15 × 2 = 4500 𝑚𝑚2
𝑎2 = 𝐴𝑔 − 𝑎1 = 6780 − 4500 = 2280 𝑚𝑚2
3.4.2
𝑎1𝑛 = 𝑎1 − 1 × 𝐷𝑡 × 𝑡 = 4500 − 2 × (1 × 24 × 15)
= 3780 𝑚𝑚2
3.4.3 𝑎1𝑒 = 𝑘𝑒 × 𝑎1𝑛 = 1.2 × 3780 = 4536 𝑚𝑚2
𝑎2𝑛 = 𝑎2𝑒 = 𝑎2 = 2280 𝑚𝑚2
𝐴𝑒 = 𝑎1𝑒 + 𝑎2𝑒 = 4536 + 2280 = 6816 𝑚𝑚2
4.6.3.2 𝑃𝑡 = 𝑝𝑦 × (𝐴𝑒 − 0.25 × 𝑎2 ) = 275 × (6816 − 0.25 × 2280)
𝑃𝑡 = 1717.65 𝐾𝑁 > (𝐹 = 172.61 𝑘𝑁) → 𝑂𝐾
∴ 𝑇ℎ𝑒 𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑 𝑑𝑜𝑢𝑏𝑙𝑒 𝑠𝑒𝑐𝑡𝑖𝑜𝑛 𝑖𝑠 𝑠𝑎𝑡𝑖𝑠𝑓𝑎𝑐𝑡𝑜𝑟𝑦
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 48 of 60
Description: Beam to Beam Date: Date: Date:
Connection 22/5/2023 22/5/2023 22/5/2023
Ref.
10.0 Design of Connections
10.1 Beam to Beam Connection
Assume S275, Grade 4.6, M20, 2 mm clearance holes.
F = 496.05 kN (Beam 2), Use Double Angle 80×80×8
Table9 275
(t < 16 → Py = 275 MPa → 𝜀 = √ = 1)
Table11 𝑃𝑦
6.2.1.1
𝑆𝑚𝑖𝑛 = 2.5𝑑 = 2.5(20) = 50 𝑚𝑚
6.2.1.2 𝑆𝑚𝑎𝑥 = 14𝑡 = 14(8) = 112 𝑚𝑚
𝑆𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 80 𝑚𝑚
Table29
𝑒𝑚𝑖𝑛 = 1.25𝐷 = 1.25(22) = 27.5 𝑚𝑚
6.2.2.5 𝑒𝑚𝑎𝑥 = 11𝜀𝑡 = 11(1)(8) = 88 𝑚𝑚
𝑒𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 40 𝑚𝑚
Table9
275
(t < 16 → Py = 275 MPa → 𝜀 = √ = 1)
Table11 𝑃𝑦
1200.11
𝐿𝑜𝑎𝑑 𝑝𝑒𝑟 𝑎𝑛𝑔𝑙𝑒 = = 600.055 𝑘𝑁
Table33
2
𝑆𝑚𝑖𝑛 = 2.5𝑑 = 2.5(20) = 50 𝑚𝑚
6.2.1.1 𝑆𝑚𝑎𝑥 = 14𝑡 = 14(12) = 168 𝑚𝑚
6.2.1.2
𝑆𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 80 𝑚𝑚
𝑒𝑚𝑖𝑛 = 1.25𝐷 = 1.25(22) = 27.5 𝑚𝑚
Table29 𝑒𝑚𝑎𝑥 = 11𝜀𝑡 = 11(1)(12) = 132 𝑚𝑚
6.2.2.5
𝑒𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 40 𝑚𝑚
𝐷𝑡 = 20 + 2 = 22 𝑚𝑚
6.3.1
𝐴𝑠 = 𝐴𝑡 = 245 𝑚𝑚2
Table30
6.3.2.1
𝑝𝑠 = 160 𝑀𝑃𝑎
𝑃𝑠 = 𝐴𝑠 × 𝑝𝑠 = 2 × 245 × 160 = 78.4 𝑘𝑁
Table31
𝑝𝑏𝑏 = 460 𝑀𝑃𝑎
6.3.3.2
𝑃𝑏𝑏 = 𝑑 × 𝑡𝑝 × 𝑝𝑏𝑏 = 20 × 12 × 460 = 110.4 𝑘𝑁
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Abbas Sayed Hashem Ahmed Mohd 51 of 60
Description: Beam to Column Date: Date: Date:
Connection 22/5/2023 22/5/2023 22/5/2023
Ref.
6.3.3.3 𝐾𝑏𝑠 = 1
Table32 𝑝𝑏𝑠 = 460
𝑃𝑏𝑠 = 𝐾𝑏𝑠 × 𝑑 × 𝑡𝑝 × 𝑝𝑏𝑠 = 1 × 20 × 12 × 460 = 110.4 𝑘𝑁
0.5𝐾𝑏𝑠 × 𝑒 × 𝑡𝑝 × 𝑝𝑏𝑠 = 0.5 × 1 × 40 × 12 × 460 = 110.4 𝑘𝑁 ≥ 𝑃𝑏𝑠
𝑀𝑖𝑛𝑖𝑚𝑢𝑚 𝑖𝑠 𝑃𝑠 = 78.4 𝑘𝑁
600.055
𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑏𝑜𝑙𝑡𝑠 = = 7.65 ≈ 8 𝑏𝑜𝑙𝑡𝑠
78.4
4.2.3 𝐴𝑣 = 𝐷 × 𝑡𝑝 = 850.9 × 12 = 10210.8 𝑚𝑚2
3.4.2
𝐴𝑣,𝑛𝑒𝑡 = 10210.8 − 8 × 22 × 12 = 8098.8 𝑚𝑚2
3.4.3
𝑆275 → 𝐾𝑒 = 1.2
6.2.3 𝐴𝑣 10210.2
0.85 × = 0.85 × = 7232.225 𝑚𝑚2
𝐾𝑒 1.2
𝐴𝑣
𝐴𝑣,𝑛𝑒𝑡 > 0.85 ×
𝐾𝑒
𝑃𝑣 = 0.6 × 𝑃𝑦 × 𝐴𝑣 = 0.6 × 265 × 8508.5 = 1352.85 𝑘𝑁 > 𝐹 → 𝑜𝑘
Fig.22
𝐿𝑣 = 673𝑚𝑚
6.2.4 𝑃𝑟 = 0.6 × 265 × 12[673 + 1.2(47 − 0.5 × 22)]=1366.5 > 𝐹 → 𝑜𝑘
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 52 of 60
Date: Date: Date:
Description: Bracing Connection
22/5/2023 22/5/2023 22/5/2023
Ref.
10.3 Bracing Connection
Assume S275, Grade 4.6, M20, 2 mm clearance holes.
F = 189.39 kN (Beam 2), Use Double Angle 50×50×4
Table9
275
(t < 16 → Py = 275 MPa → 𝜀 = √ = 1)
Table11 𝑃𝑦
189.39
𝐿𝑜𝑎𝑑 𝑝𝑒𝑟 𝑎𝑛𝑔𝑙𝑒 = = 94.695 𝑘𝑁
Table33
2
𝑆𝑚𝑖𝑛 = 2.5𝑑 = 2.5(20) = 50 𝑚𝑚
6.2.1.1 𝑆𝑚𝑎𝑥 = 14𝑡 = 14(4) = 56 𝑚𝑚
6.2.1.2
𝑆𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 80 𝑚𝑚
𝑒𝑚𝑖𝑛 = 1.25𝐷 = 1.25(22) = 27.5 𝑚𝑚
Table29 𝑒𝑚𝑎𝑥 = 11𝜀𝑡 = 11(1)(4) = 44 𝑚𝑚
6.2.2.5
𝑒𝑝𝑟𝑜𝑣𝑖𝑑𝑒𝑑 = 40 𝑚𝑚
𝐷𝑡 = 20 + 2 = 22 𝑚𝑚
6.3.1
𝐴𝑠 = 𝐴𝑡 = 245 𝑚𝑚2
Table30
6.3.2.1
𝑝𝑠 = 160 𝑀𝑃𝑎
𝑃𝑠 = 𝐴𝑠 × 𝑝𝑠 = 2 × 245 × 160 = 78.4 𝑘𝑁
Table31
𝑝𝑏𝑏 = 460 𝑀𝑃𝑎
6.3.3.2
𝑃𝑏𝑏 = 𝑑 × 𝑡𝑝 × 𝑝𝑏𝑏 = 20 × 4 × 460 = 36.8 𝑘𝑁
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 53 of 60
Date: Date: Date:
Description: Bracing Connection
22/5/2023 22/5/2023 22/5/2023
Ref.
6.3.3.3 𝐾𝑏𝑠 = 1
Table32 𝑝𝑏𝑠 = 460
𝑃𝑏𝑠 = 𝐾𝑏𝑠 × 𝑑 × 𝑡𝑝 × 𝑝𝑏𝑠 = 1 × 20 × 4 × 460 = 36.8 𝑘𝑁
0.5𝐾𝑏𝑠 × 𝑒 × 𝑡𝑝 × 𝑝𝑏𝑠 = 0.5 × 1 × 40 × 4 × 460 = 36.8 𝑘𝑁 ≥ 𝑃𝑏𝑠
𝑀𝑖𝑛𝑖𝑚𝑢𝑚 𝑖𝑠 𝑃𝑏𝑏 = 𝑃𝑏𝑠 = 36.8 𝑘𝑁
94.695
𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑏𝑜𝑙𝑡𝑠 = = 2.57 ≈ 3 𝑏𝑜𝑙𝑡𝑠
36.8
4.2.3 𝐴𝑣 = 𝐷 × 𝑡𝑝 = 834.9 × 4 = 3339.6𝑚𝑚2
3.4.2
𝐴𝑣,𝑛𝑒𝑡 = 3339.6 − 3 × 22 × 4 = 3075.6 𝑚𝑚2
3.4.3
𝑆275 → 𝐾𝑒 = 1.2
6.2.3 𝐴𝑣 3339.6
0.85 × = 0.85 × = 2365.55 𝑚𝑚2
𝐾𝑒 1.2
𝐴𝑣
𝐴𝑣,𝑛𝑒𝑡 > 0.85 ×
𝐾𝑒
𝑃𝑣 = 0.6 × 𝑃𝑦 × 𝐴𝑣 = 0.6 × 265 × 3339.6 = 530.99 𝑘𝑁 > 𝐹 → 𝑜𝑘
Fig.22
𝐿𝑣 = 300𝑚𝑚
6.2.4 𝑃𝑟 = 0.6 × 265 × 4[300 + 1.2(47 − 0.5 × 22)]=218.27kN > 𝐹 → 𝑜𝑘
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 54 of 60
Date: Date: Date:
Description: Bill of Materials
23/5/2023 23/5/2023 23/5/2023
Ref.
11.0 Bill of Materials
BOM for beams design (Group 1):
𝑼𝑩 𝟖𝟑𝟖 × 𝟐𝟗𝟐 × 𝟏𝟕𝟔
𝐹𝑟𝑜𝑚 𝑝𝑟𝑜𝑝𝑒𝑟𝑡𝑦 𝑡𝑎𝑏𝑙𝑒 𝑚𝑎𝑠𝑠 𝑝𝑒𝑟 𝑚𝑒𝑡𝑒𝑟 = 175.9 𝐾𝑔 ∕ 𝑚
𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 𝐿𝑒𝑛𝑔𝑡ℎ𝑠 × 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝐵𝑒𝑎𝑚𝑠 = 7 × 37 = 259 𝑚
𝑀𝑎𝑠𝑠 𝑖𝑛 (𝐾𝑔) = 𝑚𝑎𝑠𝑠 𝑝𝑒𝑟 𝑚𝑒𝑡𝑒𝑟 × 𝑇𝑜𝑡𝑎𝑙 𝐿𝑒𝑛𝑔𝑡ℎ = 175.9 × 259
= 45558.1 𝐾𝑔
45558.1
𝑀𝑎𝑠𝑠 𝑖𝑛 (𝑡𝑜𝑛𝑠) = = 45.558 𝑡𝑜𝑛𝑠
1000
Total
𝑇𝑜𝑡𝑎𝑙 = 45.558 + 7.658 + 27.513 + 5.94 + 7.227
= 93.896 𝑡𝑜𝑛𝑠
𝐴𝑠 𝑖𝑡 𝑔𝑖𝑣𝑒𝑛 𝑜𝑛 𝑡ℎ𝑒 𝑝𝑟𝑜𝑗𝑒𝑐𝑡 𝑑𝑎𝑡𝑎 𝑡𝑜 𝑎𝑠𝑠𝑢𝑚𝑒 10% ∶
= 𝑇𝑜𝑡𝑎𝑙 × 0.1 = 93.896 × 0.1 = 9.3896 𝑡𝑜𝑛𝑠
𝑇𝑜𝑡𝑎𝑙 𝑡𝑜𝑛𝑠 = 93.896 + 9.3896 = 103.2856 𝑡𝑜𝑛𝑠
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Ahmed Mohd Ahmed Abbas Sayed Hashem 59 of 60
Date: Date: Date:
Description: Bill of Materials
23/5/2023 23/5/2023 23/5/2023
Ref.
Beams:
Size Total Length (m) Mass (tons)
838 × 292 × 176 259 45.558
Girders:
Size Total Length (m) Mass (tons)
610×305×149 24 3.581
838×292×226 18 4.077
Columns:
Size Total Length (m) Mass (tons)
254×254×107 30 3.213
356×368×177 84 14.868
356×406×393 24 9.432
Bracing:
Size Total Length (m) Mass (tons)
2×(150×90×15) 135.84 7.227
Total Tons:
Total (Tons)
Beams 45.558
Girder 7.658
Columns 27.513
Columns Base Plate 5.94
Bracing 7.227
Total tons before the percentage 10% 93.896
Total tons after the percentage 10% 103.2856
Project: Main Structural System By: Checked: Approved: Sheet No:
of a Warehouse Storage Flooring Sayed Hashem Ahmed Mohd Ahmed Abbas 60 of 60
Date: Date: Date:
Description: Conclusion
23/5/2023 23/5/2023 23/5/2023
Ref.
12.0 Conclusion
To sum up, as we have mentioned on the introduction and through
the details of the design, all the required steps of steel design of main
structural system of a Warehouse storage flooring with configuration has
been done. We have learn many things on this project and gained a lot
of experience on the steel design such as, how to do the load
arrangement both stories 1 and 2, how to make the combination of beam
groups and that was at the beginning but after trying multiple times it
become easy, and also one of the most difficulties that we have face is
that the number of tries in order to choose the best section that can carry
the loads safely and economy without exceeding 20%.