N31 1. FOR GENERAL NOTES REFER DWG.NO.: BN-A0-10633.

2. DESIGN DATA
DESIGN PRESSURE = 1356 PSIG.
DESIGN TEMPERATURE = 230°F/-20.2°F
12"-DG-5219-D4-00 PIPING CLASS = D4.

PG 3. ALL INSTRUMENT TAG NUMBERS SHALL BE PREFIXED WITH CJO-KD-CGDU UNLESS OTHERWISE
0092D STATED.
TG TW 4. IN CASE OF EMERGENCY TRIPPING OF BANAGAS CGP I&II, START-UP GAS TO BANAGAS CAN BE
12"x10" SUPPLIED THROUGH THE 10" KHUFF GAS BACK-UP LINE TO BANAGAS BY CARRYING OUT

BV-003D

GV-001D
0091D 0091D

NOTE-6
GV-002A
10" THE FOLLOWING.
2" 3/4"

1-1/2"
a) CLOSE BV-001F , BV-003F, BV-004F, BV-005F, BV-006F & BV-007F .
10" CGDU TO ADP LINE # 1 FROM CGDU 10" 10" 10" CGDU TO ADP LINE # 1 TO K33 J/O b) BLEED OFF THE HOLD UP GAS BETWEEN BV-005F, GV-001F AND BV-006F BY OPENING V-9.
10"-DG-5103-D4-00 10"-DG-5103-D4-00
11129 11102 TP-GASTRM-00482-PID-A1 DEBLIND BV-002F DOWNSTREAM
CSO BT CSO
L030 L611 c) OPEN BV-002F TO SUPPLY GAS TO BANAGAS.
BV-001D BV-002D
5. VALVES BV-004F , BV-005F , BV-003F & GV-001F ARE PROVIDED WITH SPECTACLE BLINDS ON
BOTH UPSTREAM & DOWNSTREAM FLANGES
6. SPADES SHALL BE INSTALLED TO SEGREGATE HP KHUFF GAS NETWORK FROM LP RESIDUE
10"-DG-5231-D4-00 GAS NETWORK WHENEVER CGDU-ADP LINES ARE TO BE UTILIZED FOR RESIDUE GAS
TRANSPORT

10"-DG-5220-D4-00

3/4" PG
10" 10" 3/4" PG
0092B
GV-001G 0091
BV-004F BV-005F V-9 V-6

BV-002F
NOTE-6

GV-002F
10"
3/4" 3/4" 3/4" 1"
6" 6" 10" 10" 10" BACK-UP TO BANAGAS FROM TB03 J/O
10"-DG-5218-D4-00
11130
BV-003F BV-001F 10"x6" BT BT BV-006F BV-007F

2"
BV-001C

6"-DG-5230-D4-00

10"-DG-5221-D4-00 PSV 4" x 6"


0001C SET PR.
PG
3/4" 0092E
4" TG TW

BV-002G

GV-001E
0091E 0091E

GV-002B
10"x6"
10" GV-005C 3/4" 2"

1-1/2"
10" CGDU TO ADP LINE # 2 FROM CGDU 10" 10" 10" CGDU TO ADP LINE # 2 TO K33 J/O
10"-DG-5110-D4-00 10"-DG-5110-D4-00
11127 11101 TP-GASTRM-00482-PID-A1
L035 CSO BT CSO L614
REFERENCE DRAWINGS DRG NUMBER

NOTE-6
BV-001E PSV BV-002E
4" x 6"
0002C SET PR. P&ID FOR GAS TRANSMISSION AND DISTRIBUTION LINES. BN-A0-10633
SYMBOLS FOR PROCESS FLOW, P&ID'S AND SCHEMATIC BN-LS-010
3/4" DRAWINGS.
4"

GV-006C

12"-DG-5222-D4-00

PG
0092A
TG TW
BV-002A
GV-001A

0091A 0091A
12"
3/4"
1-1/2"

12" EAST FLANK LINE # 1 FROM K10/K39 J/O 12"


12"-DG-5217-D4-00
11126 TP-GASTRM-00903-PID-A1
CSO BT Ali
L026 Kham
BV-001A is

15.02.22
2022.

MAR
03.13

0A
REVISED AS SHOWN 16:
32:16
+
03'00'

05.12.21

JJK
AS BUILT / DRAWING CONVERTED INTO SPPID

PROC. ENG'R
12"-DG-5223-D4-00

PROJ. ENG'R
DRAWN/SNR

WELLS/WMS
ENG'R/SNR

TBS/WTP
WI/SI/DW
PG

REVISION

NAG
0092B

AG
DATE
TG TW DESCRIPTION ENG'G. PRODUCTION OTHERS
BV-003B
GV-001B

0091B 0091B
3/4" 12"
1-1/2"

12" EAST FLANK LINE # 2 FROM K10/K39 J/O 12" 12" 12" EAST FLANK LINE # 2 TO K33 J/O
12"-DG-5108-D4-00 12"-DG-5108-D4-00
11151 TP-GASTRM-00903-PID-A1 11097 TP-GASTRM-00482-PID-A1
CSO BT CSO
L027 L613
BV-001B BV-002B
12"-DG-5219-D4-00

DRAWING TITLE:
PG
0092C
TG TW
KHUFF GAS TRANSMISSION NETWORK
GV-001C

BV-002H
0091C 0091C
12" BV-003C 3/4" 2"
PIPING AND INSTRUMENTATION DIAGRAM
1-1/2"

12" EAST FLANK LINE # 3 FROM K10/K39 J/O 12" 12" 12" EAST FLANK LINE # 3 TO K33 J/O CGDU/TB03 JUMPOVER
12"-DG-5104-D4-00 12"-DG-5104-D4-00
11181 TP-GASTRM-00903-PID-A1 11100 TP-GASTRM-00482-PID-A1
CSO BT CSO
L025 L612
BV-001C BV-002C
DRAWN: DATE: SCALE: DISCIPLINE CODE: SHEET No.:

MAR 05.03.21 NTS A 1


BOUNDARY FENCE

DRAWING No.: REVISION No.:

TP-GASTRM-00902-PID-A1 0A