NATIONAL WATER COMPANY

30% Design Review Checklist


Cluster:

Project ID:

Project Name:

Design Consultant Name:

CHECKED SATISFACTORY
No. Deliverable N/A YES NO Comment
1
Completed 30% design package internal review ☐ ☐ ☐
2 Completeness of the package in accordance with the
contract requirements
☐ ☐ ☐
3
30% design package technical review comments ☐ ☐ ☐
4
Value Engineering reports ☐ ☐ ☐
5
VE recommendations action plan ☐ ☐ ☐
6
Comments compliance report ☐ ☐ ☐
7
Topographical Survey Plans ☐ ☐ ☐
8
Land Boundary Plans ☐ ☐ ☐
9
Geotechnical - Site Investigation Reports (SI) ☐ ☐ ☐
10
Geotechnical - Interpretive Reports (GI) ☐ ☐ ☐
11
Special Study Reports ☐ ☐ ☐
12
Utility Surveys and Plans ☐ ☐ ☐
13
System Narratives ☐ ☐ ☐
14
Roadworks ☐ ☐ ☐
15
Structures ☐ ☐ ☐
16
Buildings ☐ ☐ ☐
17
C W System ☐ ☐ ☐
18
Grading ☐ ☐ ☐
19
Mechanical including piping and process ☐ ☐ ☐
20 Electrical including telecommunications, instrumentation
and controls
☐ ☐ ☐
21
Design Criterion (each engineering discipline) ☐ ☐ ☐
22
Quantity/Cost Estimate Against Approved Budget ☐ ☐ ☐
23 Technical Review against Scope of Work, Codes and
Standards
☐ ☐ ☐
24
HSE and Constructability ☐ ☐ ☐
No. Reviewer's Comments Resolution

708404867.docx 1 of 2
Originator's Name / Signature and Date: Checker's Name / Signature Date:

708404867.docx 2 of 2