DAILY Preventinve Maintenance Checklist

Misc

Task ID: PM - QT - 19 Assigned to: Mechanical Technician


Asset TAG: QT/MECH/MISC/ Location: Across Tower A, B
Due Date: Scheduled Date:
Time Start: Time Finished:
MITSUBISHI

Item Description Daily Remarks and Comments


1 Check Safe operation of BMU and is free of any problems ☐
2 Check Gas system main tank for any leak ☐
3 Verify all Meters are operating properly ☐
4 Verify CO detectors cleanliness and no obstruction ☐
5 Check common area air conditioning systems for any leaks and damages ☐
6 Check Water Softener dosing ☐

Checked By: Technical Supervisor

Verified By Facility Manager


Task ID: PM - QT - 19
Asset TAG: QT/MECH/MISC/
Due Date: Daily
Time Start:

Place (Check) Sign if item is good with no faults, place X Sign if any problem or discrepancy occurred
Note: Please provide Explanation/Remark in case of any problem or discrepancy

Description
Check Safe operation of BMU and is free of any problems
Check Gas system main tank for any leak
Verify all Meters are operating properly
Verify CO detectors cleanliness and no obstruction
Check common area air conditioning systems for any leaks and damages
Check Water Softener dosing
Technician Signature
DAILY Preventinve Maintenance Checklist
Misc

blem or discrepancy occurred

Feb-01 Feb-02 Feb-03 Feb-04 Feb-05


☐ ☐ ☐ ☐ ☐
☐ ☐ ☐ ☐ ☐
☐ ☐ ☐ ☐ ☐
☐ ☐ ☐ ☐ ☐
☐ ☐ ☐ ☐ ☐
☐ ☐ ☐ ☐ ☐
Assigned to: Mechanical Technician
Location: Across Tower A, B
Scheduled Date:
Time Finished:

Feb-06 … Remarks and Comments


☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐