You are on page 1of 1

Fit-out, Maintenance WORK PERMIT

Created: …../……/…………. BUILING # ............ UNIT # ………… KM Meter # …………


Projects
AL FURJAN 1 ☐ ALMAHA ☐ MCP ☐
AL FURJAN 2 ☐ JAHIZ 1 ☐
AL FURJAN 3 ☐ JAHIZ 2 ☐
AL EZAB ☐ QBIC ☐
Fit-out, Maintenance Work Permit
☐ FITOUT ☐ FIRE SYSTEM
☐ SIGNAGE INSTALLATION ☐ STORAGE
☐ CIVIL ☐ GAS INSTALLATION/ USAGE
☐ ELECTRICAL UPGRAGE ☐ ACEES TO ROOF
☐ MECHANICAL ☐ ACCESS METER ROOM
☐ PLUMBING ☐ ACCESS OR WORK OUTSIDE UNIT
☒ CCTV SYSTEM ☐ OTHERS
REQUIRED Documents check list
1. ☐ Kahramaa Transfer Certificate new printed date
2. ☐ Copy of Contract
3. ☐ Copy of Signed QID
4. ☐ Photo of Maintenance or fit-out required
5. ☐ Fit-out Layout Drawing
DETAILED DESCIPRION REQUIRED AND MANDATORY:

START DATE …/…/………. REQUESTOR ID# ……………. REQUESTOR NAME …………….


END DATE …/…/………. REQUESTOR MOBILE ……………. REQUESTOR SIGN …………….
STATUS OF □ KAHRAMAA METERS TRANSFERRED (Y/N)? □ LEASING / COLLECTION PENDING (Y/N)?
□ ANY OPEN VIOLATIONS (Y/S)?
QDB APPROVAL
QDB- FM COORDINATOR QDB- FM PM QDB HEAD OF FACILITIES
COMMENTS
DATE &
SIGN

• Requestor confirmed that all terms and conditions apply as per leasing agreement and Fit-out manual, in case of any breaches or violations,
requestor will be back charged for the cost of damages due to non-compliance.
• Requestor confirmed that the status of the check box is considered as follow yes if  and No if  and not applicable if □ (blank).
• Requestor confirmed that he complies with required government regulation, permits and approvals for the intended works.
• Requestor confirmed that all required drawings and documents are available and can be collected immediately anytime requested by the owner
or his representative.
• This permit was issued on the awareness of the requestor for liabilities back charge for any violation or breaches of regulations and process for
maintenances and FO.

You might also like