Professional Documents
Culture Documents
Issuer Name & Contact: Enayatullah 0783079242 ☒ BTS ☐ BSC ☒NodeB ☐ RNC
Operation Responsible Etisalat: Eng Safiullah Hoshmand ☐ OCS ☐ CRM ☐ NGCC ☐ DRM
Operation Timing
Operation Risks:
Brief description of operations Including Rollback Plan Impacted NEs Details Consequences (Result)
According the power plan upgrade the power system Only BTS/NodeB Impact of the operation, mainly the
duration of the service outage
Approvals
Page 1 of 2
CHANGE REQUEST FORM (CR)
Initiator: CR Initiator
Operations Director:
GNOC:
Legal:
CTIO:
CEO:
Page 2 of 2