CHANGE REQUEST FORM (CR)

CR Reference No: 012

CR Subject: Installing and cutover SuperCap (Emtel Communications)

Issuer info Operating Equipment(s) Involved

Issuer Name & Contact: Enayatullah 0783079242 ☒ BTS ☐ BSC ☒NodeB ☐ RNC

Issued Date: 2023-09-22 ☐ eNodeB ☐ MSC ☐MGW ☐PS

Operation info ☐ PCRF ☐ CS CG ☐PS CG ☐HSS


Operation Request by:
Enayatullah ☐ STP ☐DRA ☐SMSC ☐CRBT
Operation Site (Location):
QDH098 ☐ Core SW ☐Core RT ☐FW ☐WebFiltering

Operation Responsible Etisalat: Eng Safiullah Hoshmand ☐ OCS ☐ CRM ☐ NGCC ☐ DRM

Working Performer Name:


Eng Shuja ☐Provisioning ☐ TLC ☐ VC ☐ Mediation

Working Performer contact:


0796919001 ☐ Settlement ☐ EDWH ☐ RAID ☐ BI

Operation Support info ☐ ERP ☐ CVM ☐ Tx ☐ Power

Support Responsible: Emtel 0783079242


Document reference: MOP, Procedure
Onsite Support Name:
Eng Shuja
0796919001

Operation Timing

Actions Beginning: 2023-09-22 6:00Am Expected duration: 6:00Am up to 5:00Pm

Operation Risks:

Operation Outage: ☒ No ☐ Yes:

Brief description of operations Including Rollback Plan Impacted NEs Details Consequences (Result)

According the power plan upgrade the power system Only BTS/NodeB Impact of the operation, mainly the
duration of the service outage

No service effect may sometimes face for


15 minutes 10 minutes.
Rollout Plan.

Rollback Plan 15 minutes

Change Type ☒ Planned ☐ Emergency

Change Category ☐ Major ☐ Minor ☒ Normal


☐ Standard

Approvals

Section\Name Signature Remark

Page 1 of 2
CHANGE REQUEST FORM (CR)
Initiator: CR Initiator

Line Manager: CR Initiator Line Manager

Service Owner: Service Owner

Operations Director:

GNOC:

Legal:

Commercial: Commercial Relevant Responsible

CTIO:

CEO: