Asset TAG: QT/ELECT/MISC/ Location: Across Tower A, B Due Date: Scheduled Date: Time Start: Time Finished:
Item Description Daily Remarks and Comments
1 Check Fire Alarm Panel for Any Faults ☐ 15 min 2 Check BMS System for any faults ☐ 20 min 3 Ensure Smooth operation of BMS System ☐ 20 min 4 Ensure control room is kept clean, and free from any obstructions ☐ 5 min 5 Ensure electrical and control room temperature and humidity are at normal levels ☐ 5min 9 Check UPS and CBI System Faults if any ☐ 10 min 10 Check Electrical Boards across technical rooms for any trips ☐ 30 min 11 Check ATS Switches for any faults ☐ 10 min
Item Description Daily Remarks and Comments
1 Check Safe operation of BMU and is free of any problems ☐ 40 min 3 Verify all Meters are operating properly ☐ 40 min 4 Verify CO detectors cleanliness and no obstruction ☐ 30 min 5 Check common area air conditioning systems for any leaks and damages ☐ 20 min 6 Check Water Softener dosing ☐ ****
Item Description Daily Remarks and Comments
1 Check Generators , fuel tanks and rooms operation ☐ 30 min 2 every generators running check load, operate fans … ☐ 15 min 3 check parkings fans for any fault ☐ 20 min 4 check fire fighting system, pressure, pumps … ☐ 20 min 5 check water tanks level, transfer and sump pumps operations ☐ 30 min 6 check elevators for safe operation ☐ 31 min