1 Robot controller fan filter Check & Clean 2 Conveyor vacuum lines Check & Clean 3 Ventilation pipeline Check & Clean 4 Vacuum filters Check & Clean 5 Clean the ribbon tension Wheel Sensor Surface Check & Clean 6 Check temperature Sensor Inspection 7 Main Air Supply Filter & Drain water Check & Clean 8 Flux tank Inspection 9 The cabinet cooling fans Check & Clean 10upper and lower surfaces of the ribbon puller Check & Clean Suction Cup Inspection for Loading ,Robot & Unloading 11 Check & Clean and if required then replace unit 12 Soldering pin Check, Clean and required then replace 13 IR lamps Inspection 14 Check voltage between ground and neutral Inspection 15 Soldering station fan Inspection 16 Conveyor heating plate vacuum Inspection 17 String pickup and traverse arms vacuum Inspection 18 Clean the vacuum filters Check & Clean 19 All belt tension Inspection 20 Tight power cable in electrical cabinet Inspection 21 Cell feeding mechanism Inspection 22 Robot working condition Inspection 23 Apply lubrication of all moving part of machine Lubrication 24 check and note general pressure(0.55 -0.6mpa) check and note 25 Robot Sucker pressure( 0.2-0.3 mpa) check and note 26 General flux pressure( 0.05-0.15mpa) check and note 27 Blowing pressure(0.05-0.2mpa) check and note 28 Loading sucker pressure(0.2-0.3mpa) check and note 29 Clean the exhaust line Check & Clean 30 Clean the welding conveyor vacuum pipe lines Check & Clean 31 All Motor in each unit Check the working condition to make 32 All pneumatic pipe line and cable condition Check the working condition to make 33 pneumatic components condition Check the working condition to make 34 Servo driving screw and sliding parts condition Check the working condition to make 35 sensor in each unit Check the working condition to make 36 All mechanism parts condition Check the working condition to make 37 Conveyor belt tension cylinder pressure(0.15-0.3mpa) check and note Monthly Maintenance Done By (Name): Signature: